| Location: | South Carolina |
|---|---|
| Posted: | Jan 28, 2026 |
| Due: | Feb 4, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Interior renovation includes, but is not limited to, the following: Demolition of all flooring, ceilings, plumbing fixtures, CMU chase walls and windows CMU block chase walls Casework in all classrooms Acoustic Ceiling Tiles throughout building - Luxury vinyl tile Epoxy, Walk off carpet flooring Painting Toilet Accessories Plumbing fixtures in all bathrooms and classrooms Electrical and Lighting Fire Alarm

With GovernmentContracts, you can:
...will be accepted. Demo as indicated. Install shower & acc. Provide & install ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...and recoat existing concrete flooring in main pool area and both locker rooms. ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/24/2026
...will be accepted. Demo as needed. Install prov. shower & acc. Provide & ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...for the resurfacing of approximately 7,500 square feet of aircraft hangar and shop ...
Beaufort County
Bid Due: 7/03/2026