| Location: | South Carolina |
|---|---|
| Posted: | Nov 14, 2025 |
| Due: | Dec 18, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H51-9862-JR |
| Publication URL: | To access bid details, please log in. |
Replacement of existing air handling unit #6 at Thurmond Gazes with a new air handling unit, modified electrical to emergency power, structural modifications, and roofing replacement below and around the new unit as detailed on the drawings and in the specifications.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...29303 Project Delivery Method: Design-Bid-Build Construction Cost Range: $425,000.00 - $525,000.00... Description: Roof ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/10/2026
...Location: 1000 Blossom Street, Columbia, Sc 29208 Project Delivery Method: Design-Bid-Build Construction...@mailbox.sc.edu Telephone: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...: Printed: 5 Electronic: 1 ANTICIPATED PROJECT DELIVERY METHOD: Design-Bid-Build CM-R N/A AGENCY...: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/08/2026