| Location: | South Carolina |
|---|---|
| Posted: | Nov 14, 2025 |
| Due: | Dec 18, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 60773551 |
| Publication URL: | To access bid details, please log in. |
Prep, Clean, Containment, Blast Interior and Exterior, Paint/Finish the Interior and Exterior Surfaces of the Tank (including concrete base), Painting Exposed Piping, and Miscellaneous Repairs/Tasks at the Whaley Street Tank (250,000 Gallons) and St. Matthews Tank (250,000 Gallons) as indicated or specified and as needed for a complete and proper installation.

With GovernmentContracts, you can:
...: Design-Bid-Build Construction Cost Range: $1,235,000 to $1,305,000 Agency Project Coordinator... and support ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/17/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project...: Improvements include ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...29104 Project Delivery Method: Design-Build Construction Cost Range: $96,000 Agency Project... with applicable ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/15/2026
...and hardware. Documents May Be Obtained From: Scherrie Cogdill, Director of Design and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026