| Location: | California |
|---|---|
| Posted: | Sep 25, 2025 |
| Due: | Oct 6, 2025 |
| Agency: | Sutter County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ST31002436P |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the FY2023-24 Culvert Replacements - Reclamation Rd at Maddock Rd. The project consists of trench excavation, removal and disposal of existing culvert, slurry-cement pour, installation of new culvert, rock slope protection material, backfill compaction using native soil and aggregate base, and paving.

With GovernmentContracts, you can:
...the remaining existing pavement with the underlying base material and/or soil to produce ...
La County
Bid Due: 9/29/2026
...pavement and the upper 18 inches of soil (which includes 12-14 inches of ...
State Government of California
Bid Due: 10/05/2026