| Location: | Iowa |
|---|---|
| Posted: | Jun 18, 2025 |
| Due: | Jun 22, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EK25RA018LOCK19PRESOL |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers (USACE), Rock Island District, has a requirement for Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bullnose Recesses.
The work includes but is not limited to: a base bid and two options. The base bid extends the riverwall monolith upstream and includes mobilization, hydrographic surveys, concrete removal above and underwater, mechanical dredging, underwater rock excavation, monolith extension using precast concrete segments and tremie concrete placement, checkposts and other appurtenances, fabrication of protection plate assembly, and electrical work. Option 1 constructs a bulkhead recess in the landwall and includes fabrication and installation of a cofferbox, concrete removal above and underwater, fabrication and installation of a bulkhead recess, concrete placement above and underwater, fabrication and installation a of protection plate assembly, and electrical work. Option 2 constructs the bulkhead sill and includes mobilization, hydrographic surveys, mechanical dredging, drilled shafts, stay-in-place formwork, and tremie concrete placement, and a test dewatering of the upstream chamber from the new bulkhead sill to the guard gate, bulkheads will be government furnished equipment.
NAICS: 237990
Size Standard: $45,000,000.00
Magnitude: Between $25,000,000 and $100,000,000
Unrestricted Lowest Priced Technically Acceptable Request for Proposal
It is anticipated that the formal solicitation will issued on or around 23 June 2025.
| May 6, 2025 | [Presolicitation (Updated)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses |

With GovernmentContracts, you can:
...Follow Shady Creek Ranger Facility - Construction Supplies Active Contract Opportunity Notice ID... ...
DEPT OF DEFENSE
Bid Due: 11/30/2026
...Bid Number: Project # 25-33855 Bid Title: Construction of Homestead Meadows - Phase ...
Le Mars city
Bid Due: 12/10/2026
...Bid Information Type Request for Proposal Status Issued Number 2027-055 (Construction Materials...:00:00 PM ...
City of Ames
Bid Due: 12/03/2026
...: $100,180 TSB goal: 10% Project manager: Brandon Kadner bkadner@iastate.edu 515-509-6874 Construction...@mbionline.com McGraw-Hill ...
Iowa State University
Bid Due: 12/01/2026