| Location: | Federal |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Oct 28, 2025 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C26025Q0851 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SITE VISIT: 10/24/2025 @ 10AM Pacific, White City SORCC Bldg. 229 - ask for Trevor or Stephen
Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.
| Aug 15, 2025 | [Sources Sought (Original)] J045--Repair Boilers #2 and #3 |
| Oct 8, 2025 | [Combined Synopsis/Solicitation (Updated)] J045--Repair Boilers #2 and #3 White City SORCC |
| Oct 24, 2025 | [Combined Synopsis/Solicitation (Updated)] J045--Repair Boilers #2 and #3 White City SORCC |

With GovernmentContracts, you can:
Follow 53--CASTER,SWIVEL Active Contract Opportunity Notice ID SPE7LX26U7976 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/12/2026
Follow 62--LIGHT ASSEMBLY,INDICAT Active Contract Opportunity Notice ID SPE4A626Q0915 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 6/11/2026
Follow SUBMIT A QUOTE TO PROVIDE, INSTALL, AND MAINTAIN 10GB ETHERNET CIRCUIT BETWEEN
DEPT OF DEFENSE
Bid Due: 6/29/2026
Follow FY26 REDWOOD CITY CHANNEL MAINTENANCE DREDGING PROJECT Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 6/11/2026