Airport Snow and Ice Removal IFB Addendum No. 1

Location: Illinois
Posted: Sep 3, 2026
Due: Sep 8, 2026
Agency: Qual Cities International Airport
Type of Government: State & Local
Category:
  • S - Utilities and Training Services
Publication URL: To access bid details, please log in.

Airport Snow and Ice Removal IFB Addendum No. 1

Attachment Preview

ADDENDUM NO. 1
Invitation for Bids
Airport Snow and Ice Removal
This Addendum No. 1 is hereby issued to modify and supplement the Invitation for Bids
(“IFB”) issued August 27, 2026, for Airport Snow and Ice Removal. Answers to
questions will be identified in red.
1. Is the bid opening on 9/8 open for the public to attend?
Public Attendance at Bid Opening Yes, the bid opening is scheduled for
Tuesday, September 8, 2026, at 2:30 P.M. Central Time is open to the public.
Sealed bids will be opened immediately following the submission deadline at the
Airport Administrative Offices, located in the west end of the airport terminal
building (2200 George Kirk Dr., Suite 100, Moline, IL 61265).
2. Does the Authority have minimum required equipment quantities by Area, or is
each bidder responsible for determining and proposing the equipment quantities
necessary to meet the required level of service?
Minimum Required Equipment Quantities The IFB does not specify minimum
required equipment quantities by Area. Each bidder is responsible for
determining and proposing the specific make, model, and quantity of equipment
necessary to perform the required scope of work and maintain the required level
of service.
3. If one contractor is awarded multiple Areas, may equipment be shared between
Areas during the same snow event, or must equipment identified for each Area
remain dedicated exclusively to that Area?
Equipment Sharing Across Awarded Areas The IFB does not explicitly prohibit
a contractor awarded multiple Areas from sharing equipment during a snow
event. However, any equipment sharing must not compromise the level of service
or the ability to meet all contract requirements, including the mandatory response
times and continuous operational needs—for each individual Area
simultaneously.
4. Will the Authority consider awarding all three Areas to one bidder, and if so, may
a bidder identify operational and pricing efficiencies associated with a combined
award?
Combined Award and Pricing/Operational Efficiencies The Authority reserves
the right to award contracts or issue purchase orders on whatever basis is
deemed to be in the authorities’ best interest, which includes awarding multiple or
T: 309.757.1768
F: 309.757.1515
2200 George Kirk Drive Suite 100
Moline, Illinois 61265
all Areas to a single bidder if advantageous. Bidders are permitted and
encouraged to submit combined pricing or identify cost and operational
efficiencies for a multi-Area award, provided standalone pricing for each
individual Area is also submitted.
5. Please provide historical utilization for each Area for the previous three winter
seasons, including total contractor equipment hours by equipment category and
number of call outs.
Historical Utilization (Previous 3 Seasons)
o 2023-2024 Snow season Specific equipment hours are not available
Area 1 12 call outs totaling $48,280
Area 2 12 call outs totaling $43,300
Area 3 9 call outs totaling $8,200
o 2024-2025 Snow Season Specific equipment hours are not available
Area 1 9 call outs totaling $14,845
Area 2 6 call outs totaling $11,558
Area 3 8 call outs totaling $3,728
o 2025 -2026 Snow Season Specific equipment hours are not available
Area 2 4 call outs totaling $15,320
6. What snowfall depth, pavement condition, weather condition, or operational
circumstance normally triggers a contractor call out?
Contractor Call-Out Triggers
While the IFB does not establish rigid metric thresholds (such as fixed snowfall
depth or pavement accumulation) to initiate service, call-outs are authorized
solely at the discretion of the Authority on an as-needed basis, 24/7/365.
In practice, contractor dispatch is typically prompted by one or more of the
following operational conditions:
o Snow Accumulation: Forecasted or active snowfall reaching 1.0 inch or greater.
o Operational Directives: All Official call-out notifications are issued by the Airport
Facilities Manager.
7. Does the one-hour response requirement mean all equipment and personnel
proposed for an Area must be onsite and ready to work within one hour, or only
an initial response crew?
One-Hour Response Requirement Scope The one-hour response requirement
dictates that all adequate personnel and equipment proposed and dispatched for
an Area must be on-site at the airport and ready to begin work within one (1) hour
of the initial notification call from the Authority.
T: 309.757.1768
F: 309.757.1515
2
2200 George Kirk Drive Suite 100
Moline, Illinois 61265
8. Will the Authority permit seasonal storage of contractor equipment onsite? If so,
what areas will be made available for Areas 1, 2 and 3?
Onsite Seasonal Storage of Equipment Onsite equipment storage is permitted
only with prior written consent from the Authority. The Authority can provide
designated staging and seasonal storage locations on airport property for
contractors awarded Areas 1, 2, and 3. Specific site maps and staging
boundaries will be provided prior to contract execution.
9. Please provide the previous contract pricing and identify the incumbent contractor for
each Area.
2023-2024 Snow season Quint City Construction Area 1, Area 2, and Area 3
PICK UP TRUCK PLOW: $100 per hour per truck
SKID STEER (SNOW PUSHER): $140 per hour per machine
SKID STEER (SNOW BLOWER): $140 per hour per machine
MEDIUM LOADER (1-3 yd.) $205 per hour per machine
LARGE LOADER (3-5 yd.) $230 per hour per machine
HAND SHOVEL/SNOW BLOW $50 per hour per person
SALT (AUTHORITY PROVIDED) $100 per hour per machine
OTHER (DESCRIBE) $0 per hour per machine
2024-2025 Snow season Quint City Construction Area 1, Area 2, and Area 3
PICK UP TRUCK PLOW: $105 per hour per truck
SKID STEER (SNOW PUSHER): $145 per hour per machine
SKID STEER (SNOW BLOWER): $145 per hour per machine
MEDIUM LOADER (1-3 yd.) $295 per hour per machine
LARGE LOADER (3-5 yd.) $295 per hour per machine
HAND SHOVEL/SNOW BLOW $55 per hour per person
SALT (AUTHORITY PROVIDED) $105 per hour per machine
OTHER (DESCRIBE) $105 per hour per machine
2025-2026 Snow Season Granet Construction Area 2
PICK UP TRUCK PLOW: $ 120 per hour per truck
SKID STEER (SNOW PUSHER): $ 170 per hour per machine
SKID STEER (SNOW BLOWER): $ 170 per hour per machine
MEDIUM LOADER (1-3 yd.) $ 340 per hour per machine
LARGE LOADER (3-5 yd.) $ 340 per hour per machine
HAND SHOVEL/SNOW BLOW $ 65 per hour per person
SALT (AUTHORITY PROVIDED) $ 120 per hour per machine
OTHER (DESCRIBE) $ 120 per hour per machine
10. Are payment and performance bonds required for these snow removal contracts,
and if so, what bond amount or percentage of anticipated contract value is required?
3
T: 309.757.1768
F: 309.757.1515
2200 George Kirk Drive Suite 100
Moline, Illinois 61265
Payment and Performance Bond Requirements Section 24 of the Purchase
Order Terms & Conditions confirms that payment and performance bonds are
required. The bonds must strictly comply with the Illinois Public Construction
Bond Act (30 ILCS 550/0.01 et seq.) and be issued by a surety with an A.M. Best
financial strength rating of at least A-. The document does not state a fixed dollar
amount or percentage in the main terms; bond values are governed by the
statutory requirements of the Act relative to the final contract value.
Bidders must acknowledge receipt of this Addendum No. 1 on the Bid Cover Page/Signature
Affidavit. Failure to acknowledge this Addendum may result in rejection of the bid as non-
responsive.
Issued By:
Marlin Jackson
Airport Facilities Manager
Metropolitan Airport Authority of Rock Island County, Illinois
Dated: September 3, 2026
T: 309.757.1768
F: 309.757.1515
4
2200 George Kirk Drive Suite 100
Moline, Illinois 61265
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow 88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS-

DEPT OF DEFENSE

Bid Due: 9/16/2026

DEPARTMENT OF WATER MANAGEMENT Construction 76305 1334862 1334862: Block Level Lead Service Line

City of Chicago

Bid Due: 10/01/2026

Project: C26FI103384111 - Request for Proposals (RFP) for Construction Services for the Red

Chicago Transit Authority

Bid Due: 10/07/2026

Project: Mechanical Engineering Design Services Ref. #: 214619 Department: Purchasing Type: Other Status:

Metra Rail

Bid Due: 9/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.