| PE-61750-NONST-2027-000000018 | St. George Crossing Subdivision Project (PE24218) | Waynesboro, City Of |
Aug 19, 2026 @ 11:54 AM
|
Sep 17, 2026 @ 03:00 PM
|
Start Date: Aug 19, 2026 @ 11:54 AM ET
End Date:
Sep 17, 2026 @ 03:00 PM ET
Sealed bids for construction of the St. George Crossing Subdivision Project will be received until September 17th, 2026 at 3:00 PM at the City of Waynesboro City Hall at 615 North Liberty Street, Waynesboro, Georgia 30330 at which time and place they will be publicly opened and read. Any bid received after said time & date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of 60 days. The work shall consist of furnishing all products & equipment & performing all labor necessary for water, sewer, drainage, paving, & sidewalk construction including: 3680 LF 8¿ ductile iron watermain, 600 LF of 2¿ watermain, 11 fire hydrants, shortside and longside laterals, 23 EA manhole installations, 4133 LF 8¿ sewer main, 1830 LF 4¿ sewer lateral, 61 EA cleanouts, 2395 LF 18¿ HP storm pipe, 871 LF 24¿ HP storm pipe, 248 LF 30¿ HP storm pipe, H.B. traps, grate inlets, weir inlets, rip-rap, 4¿ concrete sidewalk, 6¿ concrete, 6¿ GAB, asphalt paving, 18¿ curb and gutter, 6¿ curb, erosion controls, & grading complete. Time allotted for completion of work is 240 calendar days. The Scope of Work as described herein is defined as ¿utility contracting¿ so the Contractor performing the work must provide proof of a valid license. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid. Funding is to be provided by the OneGeorgia Authority¿s Rural Workforce Housing Initiative which is administered by DCA. This agreement is for services related to a project that is subject to BABAA. This project is a Section 3 covered contract. Section 3 Businesses are encouraged to apply. Plans & Specifications are on file at Parker Engineering. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable).
| Code | Description |
| 91396 | Paving and Resurfacing, Streets, Major and Residential |
| 91345 | Construction, Sewer and Storm Drain |
| 91360 | Construction, Water System, Plants, Main and Service Line |
| 91362 | Construction, Concrete, Pour-In-Place, Form, Place, Finish |
Lindsey Bashlor
lindsey@parker-engineering.com
912-764-7722
City of Waynesboro - St. George Crossing Subdivision
Contract Documents & Technical Specifications
SECTION 00100
ADVERTISEMENT FOR BIDS
PART 1. GENERAL
1.1 SEALED BIDS
Sealed bids for construction of the St. George Crossing Subdivision Project will be
received until September 17th, 2026 at 3:00 PM at the City of Waynesboro City Hall
at 615 North Liberty Street, Waynesboro, Georgia 30330 at which time and place
they will be publicly opened and read. Any bid received after said time and date will
not be considered by the Owner. No bid may be withdrawn after the closing time for
the receipt of bids for a period of sixty (60) days.
1.2 SCOPE OF WORK
The work shall consist of furnishing all products and equipment and performing all labor
necessary to perform the following:
Project shall consist of water improvements including, but not limited to, approximately
3,680 LF 8" ductile iron watermain, 600 LF of 2" watermain, 11 fire hydrants, 40 shortside
laterals, and 21 longside laterals, and miscellaneous improvements.
Project shall consist of sewer improvements including, but not limited to, approximately 23
EA manhole installations (various depths), 4,133 LF 8" sewer main, 1,830 LF 4" sewer
lateral, 61 EA cleanouts and miscellaneous improvements.
Project shall consist of storm improvements including, but not limited to, 2,395 LF 18" HP
storm pipe, 871 LF 24" HP storm pipe, 248 LF 30" HP storm pipe, H.B. traps, grate inlets,
weir inlets, rip-rap, and miscellaneous improvements.
Project shall consist of miscellaneous improvements including, but not limited to, 4"
concrete sidewalk, 6" concrete, 6" GAB, asphalt paving, 18" curb and gutter, 6" curb,
erosion controls, and grading complete.
Time allotted for completion of work is two hundred forty (240) calendar days. All Work
shall be completed in accordance with the plans and specifications.
1.3 CONTRACTOR LICENSE
The Scope of Work as described herein is defined as "utility contracting" in accordance with
O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid
license by the State of Georgia as a "Utility Contractor" and must also employ a "Utility
Manager" certification holder who will have oversight of all the work. See Instruction to
Bidders for additional bidding requirements.
Parker Engineering, Inc. 00100-1
Proj. No. PE24218
City of Waynesboro - St. George Crossing Subdivision
Contract Documents & Technical Specifications
1.4 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC.
Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B,
Statesboro, Georgia 30458, Phone: (912) 764-7722, email: lindsey@parker-
engineering.com, upon payment of $150.00 for each full-size set (non-refundable).
1.5 BONDS
Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less
than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with
an "A" minimum rating of performance and a financial strength of at least five (5) times the
contract price as listed in the most current publication of "Best's Key Rating Guide Property
Liability". Performance and Payment Bonds, each in an amount equal to 100% of the
contract price shall be required of the successful bidder if contract is awarded. Each Bond
shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the
surety and certified to include the date of the bond.
1.6 FUNDING SOURCES
Funding is to be provided by the OneGeorgia Authority's Rural Workforce Housing Initiative
which is administered by the Georgia Department of Community Affairs. Funding is also
provided by the City of Waynesboro. All Bidders must comply with 41 CFR 60-4, in regard
to affirmative action, to ensure equal opportunity to females and minorities and will apply
the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of the project.
This project is a Section 3 covered contract. Section 3 Business Concerns are
encouraged to apply.
1.7 BUILD AMERICA, BUY AMERICA BID REQUIREMENTS
This agreement is for services related to a project that is subject to the Build America,
Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment
and Jobs Act ("IIJA"), Pub. L. 177-58. Absent an approved waiver, all iron, steel,
manufactured products, and construction materials used in this project must be produced
in the United States, as further outlined by the Office of Management and Budget's
Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America
Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022.
1.8 RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids and to waive informalities, including
without limitation, the rights to reject any or all nonconforming, non-responsive,
unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it
would not be in the best interest of the Project to make an award to that Bidder, whether
because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability
or fails to meet any other pertinent standard or criteria established by the Owner.
Parker Engineering, Inc. 00100-2
Proj. No. PE24218
City of Waynesboro - St. George Crossing Subdivision
Contract Documents & Technical Specifications
1.9 E-VERIFY
Contractor shall comply with E-Verify regulations.
CITY OF WAYNESBORO
OWNER
END OF SECTION
Parker Engineering, Inc. 00100-3
Proj. No. PE24218

With GovernmentContracts, you can:
...2026-21: Newton Drive Storm Drainage Improvements Project Bids are due by 10:00 AM ...
City of Covington
Bid Due: 10/13/2026
...2026-21 Newton Drive Storm Drainage Improvements Project Covington, City Of Aug 24, 2026 ...
State Government of Georgia
Bid Due: 10/13/2026
..., curb & gutter, storm drainpipe, catch basins, driveway reconstruction and thermoplastic striping... ...
State Government of Georgia
Bid Due: 9/22/2026
...measures, storm water detention facilities, storm sewer, sanitary sewer, water mains, curb and ...
City of Gainesville
Bid Due: 9/24/2026