RFP - PROGRESSIVE DESIGN BUILD ROSECRANS PROPERTY DEVELOPMENT

Location: California
Posted: Aug 20, 2026
Due: Oct 30, 2026
Agency: County of San Diego
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
  • Y - Construction of Structures and Facilities
Solicitation No: BPM013320
Publication URL: To access bid details, please log in.
RFx Name: BPM013320
RFx Begin Date (UTC+0): RFP - PROGRESSIVE DESIGN BUILD ROSECRANS PROPERTY DEVELOPMENT
RFx End Date (UTC+0): 1
Commodities: 1
RFx Status: Building and facility maintenance and repair services
Solicitation Code: 8/20/2026 9:30:00 AM
Lot #: 10/30/2026 3:00:00 PM
Round #: 70
d
22
h
43
min
15
s

RFx General Information
Code
BPM013320
RFx Name
RFP - PROGRESSIVE DESIGN BUILD ROSECRANS PROPERTY DEVELOPMENT
Lot #
1
Round #
1
RFx Begin Date
8/20/2026 9:30:00 AM
RFx End Date
10/30/2026 3:00:00 PM
Summary
Contact

Kristen N. McEachron, Senior Procurement Contracting Officer
Cell: 858-880-5188 | Kristen.McEachron@sdcounty.ca.gov

Q&A Start Date (M/d/yyyy)
8/20/2026
9:30:00 AM
Q&A End Date (M/d/yyyy)
9/23/2026
5:00:00 PM
RFx Documents
Selected
Title Type Att. Last Modification Creation Date Validity End Date
00 31 00 Information Available to Proposers RFx Commercial Documents (Approved) 8/19/2026 8:07:10 PM 8/19/2026 8:07:10 PM
Division 01 Documents RFx Commercial Documents (Approved) 8/19/2026 8:05:04 PM 8/19/2026 8:05:04 PM
Division 00 Documents RFx Commercial Documents (Approved) 8/19/2026 8:02:20 PM 8/19/2026 8:02:20 PM
00 11 19 Request for Proposal RFx Commercial Documents (Approved) 8/19/2026 8:01:30 PM 8/19/2026 8:01:30 PM
4 Record(s)

Attachment Preview

MAGGIE RAMSBERGER
DEPARTMENT OF PURCHA SING AND CONTRACTING
BRENDA MILLER
INTERIM DIRECTOR 5560 OVERLAND AVENUE, SUITE 270, SAN DIEGO, CALIFORNIA 92123-1204 ASSISTANT DIRECTOR
Phone (858) 505-6367 Fax (858) 715-6452
August 20, 2026
COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP)
13320
GENERAL SERVICES
PROGRESSIVE DESIGN BUILD
ROSECRANS PROPERTY DEVELOPMENT
The County of San Diego (County) is requesting proposals (Proposal) from firms qualified to
provide Progressive Design Build services for the preconstruction and construction phases of
ROSECRANS PROPERTY DEVELOPMENT.
The delivery method for this Project is "Progressive Design Build" (PDB). The Project will consist
of a Base Scope and, at the County's discretion, one or more Contract Options. The Base Scope
and each Contract Option will have an individual preconstruction phase and, at County's option,
a construction phase. During the preconstruction phase, the Contractor will collaborate with the
County on existing conditions, design, constructability, cost, and schedule and develop a
Guaranteed Maximum Price (GMP) for the construction phase. Upon the County acceptance of
the GMP, the County may exercise its option for the construction phase. If the County and the
Contractor do not agree upon a GMP, the County may not exercise its option for the construction
phase to the Contractor.
The current estimated budget not to exceed for this Project, including the Base Scope, is
$212,000,000.00. Refer to the section titled, "Project Description," for additional information.
The Contracting Officer for this solicitation is Kristen N. McEachron, Senior Procurement
Contracting Officer (kristen.mceachron@sdcounty.ca.gov)

TABLE OF CONTENTS
ARTICLE 1 PROCUREMENT INFORMATION ..................................................................... 4
1.1 RFP TIMELINE.............................................................................................................................. 4
1.2 PRE-PROPOSAL CONFERENCE................................................................................................ 4
1.3 QUESTIONS ................................................................................................................................. 4
1.4 PROPOSAL SUBMITTAL ............................................................................................................. 5
1.5 BONDING AND INSURANCE ....................................................................................................... 5
1.6 RETENTION.................................................................................................................................. 6
1.7 PREVAILING WAGE COMPLIANCE ............................................................................................ 6
1.8 LICENSING OF PROPOSER ....................................................................................................... 7
1.9 VEHICLE EMISSIONS DISCLOSURE & COMPLIANCE REQUIREMENT ................................. 7
1.10 NO SUBSTITUTIONS ................................................................................................................... 7
ARTICLE 2 PROJECT OVERVIEW ......................................................................................8
2.1 PROJECT DESCRIPTION ............................................................................................................ 8
2.2 PURPOSE ..................................................................................................................................... 9
2.3 SCOPE OF WORK ....................................................................................................................... 9
2.4 BUDGET NOT TO EXCEED ......................................................................................................... 9
2.5 FIRMS ASSOCIATED WITH PROJECT ....................................................................................... 9
ARTICLE 3 RFP INSTRUCTIONS AND RULES ................................................................. 11
3.1 RFP PROCESS........................................................................................................................... 11
3.2 INSTRUCTIONS FOR SUBMITTING A PROPOSAL ................................................................. 12
3.3 PROPOSAL ORGANIZATION .................................................................................................... 14
3.4 EVALUATION AND SELECTION ............................................................................................... 15
3.5 DEFINITIONS.............................................................................................................................. 16
3.6 COUNTY COMMITMENT ........................................................................................................... 16
3.7 LATE, MODIFIED, OR WITHDRAWN PROPOSAL ................................................................... 16
3.8 INFORMATION AVAILABLE TO PROPOSERS ......................................................................... 17
3.9 DUTY TO INQUIRE, QUESTIONS, AND EXPLANATION TO PROPOSERS ........................... 18
3.10 PROTEST PROCEDURE ........................................................................................................... 18
3.11 DEBRIEF AND REVIEW OF CONTRACT FILES ....................................................................... 18
3.12 PROPOSER COMMUNICATIONS ............................................................................................. 19
3.13 CLAIMS AGAINST THE COUNTY.............................................................................................. 19
3.14 SOLICITING EMPLOYEES ......................................................................................................... 19
3.15 PROHIBITED CONTRACTS ....................................................................................................... 19
3.16 PUBLIC CONTRACT CODE COMPLIANCE .............................................................................. 20
3.17 CALIFORNIA REVENUE AND TAXATION CODE 18662 ....................................................... 20
3.18 W-9 FORM .................................................................................................................................. 21
3.19 ORGANIZATIONAL CONFLICT OF INTEREST POLICY FOR DESIGN BUILD PROJECTS .. 21
3.20 COMMITMENT TO USE A SKILLED AND TRAINED WORKFORCE ....................................... 21
3.21 DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS .............................................. 21
3.22 SUBCONTRACTORS, SUPPLIERS, AND OTHERS ................................................................. 22
ARTICLE 4 EVALUATION CRITERIA ................................................................................ 24
4.1 ESSENTIAL REQUIREMENTS - PASS/FAIL ............................................................................ 24
4.2 ACCEPTABLE SAFETY RECORD - PASS/FAIL ...................................................................... 24
4.3 EXPERIENCE OF PROPOSER - UP TO 200 POINTS ............................................................. 24
4.4 EXPERIENCE OF PERSONNEL - UP TO 200 POINTS ........................................................... 24
4.5 PROJECT PLAN - UP TO 200 POINTS .................................................................................... 24
00 11 19 Request for Proposal (Rev. 07/29/26) Page 2 of 59

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
4.6 PRICE PROPOSAL - UP TO 200 POINTS ................................................................................ 24
4.7 CONTRACT TERMS AND CONDITIONS - UP TO 100 POINTS .............................................. 24
4.8 FINANCIAL STRENGTH - UP TO 100 POINTS ........................................................................ 25
4.9 INTERVIEW - UP TO 200 POINTS (OPTIONAL) ...................................................................... 25
ARTICLE 5 SUBMITTAL ITEMS ......................................................................................... 26
5.1 PROPOSAL COVER PAGE (PC600) ......................................................................................... 27
5.2 REPRESENTATIONS AND CERTIFICATIONS FORM (PC601) ............................................... 27
5.3 PROPOSER INFORMATION ...................................................................................................... 28
5.4 ESSENTIAL REQUIREMENTS .................................................................................................. 32
5.5 SAFETY RECORD ...................................................................................................................... 37
5.6 EXPERIENCE OF PROPOSER .................................................................................................. 38
5.7 EXPERIENCE OF PERSONNEL ................................................................................................ 42
5.8 PROJECT PLAN ......................................................................................................................... 43
5.9 PRICE PROPOSAL(S) ................................................................................................................ 48
5.10 CONTRACT TERMS AND CONDITIONS .................................................................................. 50
5.11 CONFIDENTIAL/PROPRIETARY EXHIBIT; NONDISCLOSURE INDEMNIFICATION
AGREEMENT (PC620) ........................................................................................................................... 51
5.12 AUTHORIZATION FOR RELEASE OF INFORMATION AND WAIVER OF LIABILITY FOR
REFERENCES ........................................................................................................................................ 52
5.13 NON-COLLUSION DECLARATION ........................................................................................... 53
5.14 IRAN CONTRACTING ACT CERTIFICATION ........................................................................... 54
5.15 FLEET COMPLIANCE CERTIFICATION ................................................................................... 55
5.16 SURETY DECLARATION FORM ............................................................................................... 56
ARTICLE 6 ATTACHMENTS .............................................................................................. 58
6.1 DIVISION 00 DOCUMENTS ....................................................................................................... 58
6.2 GENERAL REQUIREMENT SPECIFICATIONS, DIVISION 01 DOCUMENTS ......................... 58
00 11 19 Request for Proposal (Rev. 07/29/26) Page 3 of 59

Event Description Date and Time (San Diego Time)
Pre-Proposal Conference & Job Walk September 3, 2026, at 9:00 a.m.
Questions due September 23, 2026, prior to 5:00 p.m.
Proposals due October 30, 2026, prior to 3:00 p.m.

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
ARTICLE 1 PROCUREMENT INFORMATION
1.1 RFP TIMELINE
Below is the County's timeline for this RFP. This timeline is subject to change at any time. The
County will issue an addendum for changes to the pre-proposal conference date, Questions due
date, or proposal due date. The actual timing and sequence of events resulting from this RFP
shall ultimately be determined by the County.
Event Description Date and Time (San Diego Time)
Pre-Proposal Conference & Job Walk September 3, 2026, at 9:00 a.m.
Questions due September 23, 2026, prior to 5:00 p.m.
Proposals due October 30, 2026, prior to 3:00 p.m.
1.2 PRE-PROPOSAL CONFERENCE
1.2.1 A pre-proposal conference will be held on the Date and Time listed in the timeline at the
County Administration Center, 1600 Pacific Highway, Board Chamber (Third Floor, Room
310), San Diego, CA 92101. The County will provide an overview of the RFP process and
may provide a program/technical overview and other information. Requests for clarification
related to definition or interpretation of this RFP shall be submitted in writing via BuyNet
as Questions in accordance with the section titled "Duty to Inquire, Questions, and
Explanation to Proposers." Attendance at the pre-proposal conference is encouraged but
not mandatory.
1.2.2 A job walk/site inspection will follow the pre-proposal conference at the Health Services
Complex, 3851 Rosecrans Street, San Diego, CA 92110. Attendance at the job walk/site
inspection is encouraged but not required.
1.2.3 Information provided by the County, both written and oral, at a pre-proposal conference
and job walk/site inspection is non-binding. Written information provided at a pre-proposal
conference is not a Contract Document and should not be relied upon by Proposers.
Requests for clarification related to definition or interpretation of this RFP shall be
submitted in writing via BuyNet as Questions in accordance with the section titled, "Duty
to Inquire, Questions, and Explanation to Proposers."
1.3 QUESTIONS
1.3.1 Questions regarding this RFP shall be submitted in writing via BuyNet to the Contracting
Officer by the Date and Time listed in the timeline, in accordance with the section titled,
"Duty to Inquire, Questions, and Explanation to Proposers." Oral explanations or
responses to Questions will not be binding upon the County.
00 11 19 Request for Proposal (Rev. 07/29/26) Page 4 of 59

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
1.3.1.1 Please be aware that the County has changed its procedure for submitting
Questions. In order to see all information related to this RFP, to submit
Questions, and to receive notifications of updates, Proposers must select
"Participate in RFx" for this solicitation in BuyNet. Questions should be
submitted via BuyNet, by sending a message to the Contracting Officer through
the "Discussions" functionality in accordance with the section titled, "Duty to
Inquire, Questions, and Explanation to Proposers." Non-Proposers should
direct inquiries regarding this solicitation to the Contracting Officer.
1.3.2 Concerns or comments regarding this solicitation should be directed to the Contracting
Officer.
1.4 PROPOSAL SUBMITTAL
1.4.1 The County has posted this solicitation on its official BuyNet website at
https://sdbuynet.sandiegocounty.gov/. Proposers should go to BuyNet for the most up-to-
date information and to submit Questions and proposals. In order to see all information
related to this RFP, to submit Questions, and to receive notifications of updates, Proposers
must select "Participate in RFx" for this solicitation in BuyNet.
1.4.2 Proposer must submit a complete original proposal in accordance with the format provided
in this solicitation to the County of San Diego, Department of Purchasing and Contracting
through electronic upload to BuyNet by the Date and Time listed in the timeline.
1.4.3 If Proposer is unable to submit via BuyNet for any reason, Proposer may submit via
electronic files on CD/DVD or a printed proposal at the Purchasing and Contracting front
desk. If delivering the RFP at the Purchasing and Contracting front desk on the due date,
Proposer should plan to arrive early, as parking may be limited. When submitting via
BuyNet, allow extra time to submit by an alternate method in the event of technical
difficulties.
1.4.4 The County's decision about the timeliness or responsiveness of any submitted document
shall be final, and the County has the discretion to waive or not waive any non-material
defect or nonconformance.
1.5 BONDING AND INSURANCE
1.5.1 Proposer shall demonstrate a minimum bonding capacity of 100% of the Budget NTE for
all Contract Options in response to this RFP.
1.5.2 The selected Proposer shall provide a Payment Bond and Performance Bond as specified
in the article titled "Insurance and Bonds" of the General Conditions.
1.5.3 The selected Proposer shall provide insurance as specified in as described in 00 73 16
Insurance Requirements.
00 11 19 Request for Proposal (Rev. 07/29/26) Page 5 of 59

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
1.5.4 The successful Proposer shall provide Installation Floater/Builders Risk insurance
including Acts of God for the total replacement cost of the Project, as described in 00 73
16 Insurance Requirements. (California Public Contract Code 7105.)
1.6 RETENTION
The County will withhold retention in the amount of 5% of each progress payment. Pursuant to
California Public Contract Code 22300, the successful Proposer may substitute certain
securities for funds withheld by County to ensure Proposer/Contractor's performance under the
Contract.
1.7 PREVAILING WAGE COMPLIANCE
1.7.1 The undertaking and accomplishment of this Project is required by State law to comply
with the requirements of California Labor Code 1770, et seq. Nothing in this RFP is
intended to nor should be interpreted as contravening the provisions of that code.
1.7.2 The Proposer shall be fully knowledgeable of and shall comply with the provisions of
California Labor Code 1770, including the general prevailing wage rate requirements,
requirements for subcontracts, and forfeiture penalties.
1.7.3 Department of Industrial Relations Compliance Monitoring and Enforcement:
1.7.3.1 County public works projects are subject to compliance monitoring and
enforcement by the Department of Industrial Relations (DIR) in accordance with
California Labor Code 1771.4(a)(1). As part of this program, contractors and
subcontractors on public works projects are required to be registered with DIR
in accordance with California Labor Code 1725.5. Unregistered contractors
are not qualified to bid on, be listed in a bid proposal, listed as a subcontractor,
or engage in the performance of any public works contract, all as more
particularly described in California Labor Code 1771.1(a). The successful
Contractor shall be required to post the job site with all notices required by
regulations per California Labor Code 1771.4(a)(2), whether or not the County
also posts.
1.7.3.2 Pursuant to California Labor Code 1770, the Director of the DIR has
ascertained the general prevailing rate of per diem wages and a general
prevailing rate for legal holiday and overtime work for each craft required for
execution of the contract.
1.7.3.3 In accordance with California Labor Code 1773.2, copies of the prevailing rate
of per diem wages are on file and can be viewed during normal business hours
at the County Department of Purchasing and Contracting, located at 5560
Overland Avenue, Suite 270, San Diego, CA 92123-1294. Contractor shall post
a copy of the applicable prevailing wage rates at the job site.
1.7.3.4 Wage rates set forth are the minimum that may be paid by the Contractor.
Nothing herein shall be construed as preventing Contractor from paying more
00 11 19 Request for Proposal (Rev. 07/29/26) Page 6 of 59

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
than the minimum rates set. No extra compensation whatsoever will be allowed
by the County due to the inability of the Contractor to hire labor at minimum
rates, nor for necessity for payment by Contractor of subsistence, travel time,
overtime, or other added compensations, all of which possibilities are elements
to be considered and ascertained to the Contractor's own satisfaction in
preparing its Proposal.
1.7.3.5 If it becomes necessary to employ crafts other than those listed in the General
Prevailing Wage Rate, Contractor shall obtain a wage rate determination. The
rates thus determined shall be applicable as minimum from the time of initial
employment. Contractor shall be responsible for paying the applicable rate.
1.7.3.6 Contractor and each subcontractor shall keep and make available accurate
payroll record in accordance with California Labor Code 1771.4(a)(3) and
1776. The record shall contain the names, addresses, social security numbers,
work classifications, straight time and overtime hours worked each day and
week, and the actual per diem wages paid to each journeyman, apprentice,
worker, or other employee employed by Contractor and/or subcontractors in
connection with the work. Payroll records shall be certified and shall be on
forms provided by the Division of Labor Standards Enforcement or shall contain
the same information as those forms. A copy of all payrolls shall be submitted
weekly to in accordance with the Contract. Contractor and subcontractors'
certified payroll records shall be available for inspection at the principal office of
Contractor, or at the job site should the principal office be located outside of
San Diego County.
1.8 LICENSING OF PROPOSER
Unless otherwise provided in the Contract Documents, Contractor shall possess, at the time its
Proposal is submitted, at the time the Contract is awarded, and at all times when Work is
performed, a valid license in accordance with the provisions of the Contractor's State License
Law (Cal. Bus. & Prof. Code 7000 et seq.) with the following license classification: Class "B"
General Building Contractor.
1.9 VEHICLE EMISSIONS DISCLOSURE & COMPLIANCE REQUIREMENT
All Proposers shall comply with California Air Resources Board ("CARB") In-Use Off-Road Diesel-
Fueled Fleets regulations in California Code of Regulations Title 13, Division 3 ( "Regulation").
Proposers shall complete the attached Fleet Compliance Certification and, as applicable, submit
valid Certificate(s) of Reported Compliance with the Proposal. In responding to this solicitation, it
shall be the Proposer's sole responsibility to evaluate and account for the cost of complying with
all vehicle and equipment emissions requirements under this Agreement and applicable law,
including the Regulation, in its Proposal.
1.10 NO SUBSTITUTIONS
Pursuant to California Public Contract Code 3400(c), the County has made findings designating
certain materials, products, things, or services by specific brand or trade name. Such findings and
00 11 19 Request for Proposal (Rev. 07/29/26) Page 7 of 59

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
the materials, products, things, or services and their specific brand or trade names are set forth
in the 01 61 10 Products Specified by Brand Name. Proposers shall review the Contract
Documents to understand the extent to which the Project incorporates those brand name
materials, products, things, or services.
ARTICLE 2 PROJECT OVERVIEW
2.1 PROJECT DESCRIPTION
2.1.1 The Project will be delivered in a Base Scope and, at the County's discretion, one or more
Contract Options. Refer to the section titled, "Contract Options," within the 00 72 95
General Conditions and the section titled, "Contract Options for Extra Work," within the 00
52 96 Agreement for additional information.
2.1.2 Base Scope Behavioral Health Wellness Campus
Development of a new Behavioral Health Wellness Campus on approximately 8.24 acres of
County-owned property located at 3851 Rosecrans Street in San Diego. The Campus will include
approximately 120,000 square feet of new facilities designed to provide a comprehensive
continuum of behavioral health services for adults, including outpatient treatment, crisis
stabilization, residential substance use treatment, mental health rehabilitation, social
rehabilitation, peer support, administrative and operational support functions, and related
behavioral health programs.
Associated site improvements, including parking, circulation, landscaping, outdoor therapeutic
and recreational spaces, utility infrastructure, signage, lighting, security features, stormwater
features and other improvements necessary to support campus operations.
To maintain uninterrupted operation of the adjacent County psychiatric hospital during
construction, temporary construction-related improvements and facilities, such as temporary
offices, storage containers, utility connections, fencing, parking modifications, and other
temporary operational support facilities, all of which will be removed or restored upon completion
of construction.
In June 2025, the California Department of Health Care Services (DHCS) released the Behavioral
Health Continuum Infrastructure Program (BHCIP) Bond Round 2: Unmet Needs funding
opportunity. The County applied for development of the Wellness Campus and on March 11,
2026, received notice of a conditional grant award totaling approximately $99.5 million. The
BHCIP Grant Program Funding Agreement (PFA) imposes the following non-negotiable
requirements:
* Any BHCIP grant funds not obligated and expended by June 30, 2031, must be returned
to the State.
* The Campus must include approximately 118,052 square feet of new facilities.
* The development of the Campus must meet the requirements of Health & Safety Code
50675.1.5 and Welfare & Institutions Code 5960.31.
00 11 19 Request for Proposal (Rev. 07/29/26) Page 8 of 59

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
2.1.3 Contract Option 1 Redevelopment of Remaining Property
Redevelopment, renovation, and/or construction of improvements on the remaining
approximately 3.4 acres of County property at 3851 Rosecrans Street ("Remaining Property").
This is subject to availability of funding, compliance with California Environmental Quality Act
(CEQA), and receipt of Board of Supervisors' approval.
Upon County issuance of a notice to proceed with Phase 1 Preconstruction, perform a
comprehensive feasibility study to evaluate existing site conditions, facility condition, structural
systems, utility infrastructure, operational requirements, code compliance, environmental
constraints, historic resource considerations, and opportunities to improve functionality,
resilience, sustainability, and long-term asset performance. Develop and evaluate multiple
alternatives, including renovation of existing facilities, partial reconstruction, and complete site
redevelopment. Prepare conceptual designs, planning-level cost models, schedules, phasing
strategies, life-cycle cost analyses, risk assessments, and implementation recommendations.
Upon County's selection of a preferred alternative, provide complete architectural, engineering,
and preconstruction services necessary to advance the Contract Option through final design and
permitting. Coordinate a design that supports uninterrupted County operations to the maximum
extent practicable.
Upon County issuance of a notice to proceed with Phase 2 Construction, commence with
Construction Work and achieve Substantial Completion within the Contract Time.
Proposer is not required to provide a Price Proposal for this Contract Option at this time.
2.2 PURPOSE
To utilize a Progressive Design Build (PDB) process whereby a single contract will be awarded
to include preconstruction services and, at County's option, construction services necessary to
deliver the Project. The County may, for example, at its discretion, proceed with construction
along with the Design Professionals, but hire a different general contractor to build the Project.
(Please refer to the section titled Contractual Off-Ramp of the 00 56 96 Agreement for additional
information.)
2.3 SCOPE OF WORK
Refer to 00 54 13 Scope of Work for additional information.
2.4 BUDGET NOT TO EXCEED
The Budget Not-To-Exceed (Budget NTE) for Base Scope Behavioral Health Wellness Campus
of the Progressive Design Build contract is $212,000,000.00. Refer to the Price Proposal(s) for
the County's estimates of Direct Pass-Through Costs, Allowances, and County Controlled
Contingency. Refer to the section titled, "Budget Not-to-Exceed" in 00 52 96 Agreement for
additional information.
2.5 FIRMS ASSOCIATED WITH PROJECT
00 11 19 Request for Proposal (Rev. 07/29/26) Page 9 of 59

Bolder Associates 300 Spectrum Center Drive #730 Irvine, CA 92618 O'Connor Construction Management Inc. (OMCI) 2550 Fifth Avenue, Suite 720 San Diego, CA 92103
Carrier Johnson San Diego, 185 F Street, Suite 500 San Diego, CA 92101 Abramson Architects / Moon-Majoras Architects 5171 W. Jefferson Blvd, Los Angeles, CA 90016
Sillman Architects 7515 Metropolitan Dr. Ste. 400 San Deigo, CA 92108 CannonDesign 797 J Street, San Diego, CA 92101
Jones Lang Lasalle (JLL) 4727 Executive Dr. 11th floor, San Diego, CA 92121 Nova Services, Inc. 4373 Viewridge Ave., B, San Diego, CA 92123
BWE, Inc. 9449 Balboa Ave., San Diego, CA 92123 Helix Environmental Planning 7578 El Cajon Blvd., La Mesa, CA 91942
RECON Environmental 3111 Camino Del Rio N. Ste. 600 San Diego, CA 92108 PanGIS, Inc. 8745 Aero Dr. #101, San Diego, CA 92123
TerraPacific Consultants 4010 Morena Blvd. Suite 108, San Diego, CA 92117 Ninyo & Moore 5710 Ruffin Rd. San Diego, CA 92123
Latitude 33 10731 Treena St., San Diego, CA 92131 KPFF Consulting Engineers 3131 Camino Del Rio N. #1080, San Diego, CA 92108
MA Engineers Inc. 5160 Carroll Canyon Rd., San Diego, CA 92121 The Dry Utility Group, Inc. PO BOX 1292 San Marcos, CA 92079
Chicago Title 2365 Northside Dr. Suite 600 San Diego, CA 92108 Cumming Group 15010 Avenue of Science Suite 100 San Diego, CA 92128

COUNTY OF SAN DIEGO - REQUEST FOR PROPOSALS (RFP) 13320
DEPARTMENT OF GENERAL SERVICES
DESIGN-BUILD OF ROSECRANS PROPERTY DEVELOPMENT
2.5.1 The County of San Diego engaged the following firms to provide design, environmental,
and construction documents for this construction procurement:
Bolder Associates O'Connor Construction Management Inc. (OMCI)
300 Spectrum Center Drive #730 2550 Fifth Avenue, Suite 720
Irvine, CA 92618 San Diego, CA 92103
Abramson Architects / Moon-Majoras Architects
Carrier Johnson
San Diego, 185 F Street, Suite 500
5171 W. Jefferson Blvd,
San Diego, CA 92101
Los Angeles, CA 90016
Sillman Architects CannonDesign
7515 Metropolitan Dr. Ste. 400 797 J Street,
San Deigo, CA 92108 San Diego, CA 92101
Jones Lang Lasalle (JLL) Nova Services, Inc.
4727 Executive Dr. 11th floor, 4373 Viewridge Ave., B,
San Diego, CA 92121 San Diego, CA 92123
BWE, Inc. Helix Environmental Planning
9449 Balboa Ave., 7578 El Cajon Blvd.,
San Diego, CA 92123 La Mesa, CA 91942
RECON Environmental PanGIS, Inc.
3111 Camino Del Rio N. Ste. 600 8745 Aero Dr. #101,
San Diego, CA 92108 San Diego, CA 92123
TerraPacific Consultants Ninyo & Moore
4010 Morena Blvd. Suite 108, 5710 Ruffin Rd.
San Diego, CA 92117 San Diego, CA 92123
Latitude 33 KPFF Consulting Engineers
10731 Treena St., 3131 Camino Del Rio N. #1080,
San Diego, CA 92131 San Diego, CA 92108
MA Engineers Inc. The Dry Utility Group, Inc.
5160 Carroll Canyon Rd., PO BOX 1292
San Diego, CA 92121 San Marcos, CA 92079
Chicago Title Cumming Group
2365 Northside Dr. Suite 600 15010 Avenue of Science Suite 100
San Diego, CA 92108 San Diego, CA 92128
00 11 19 Request for Proposal (Rev. 07/29/26) Page 10 of 59

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...HSR26-16 M2M Collaborative Design-Build ServicesDetails Event ID HSR26-16 Format/Type: Sell Event... that the ...

State Government of California

Bid Due: 11/30/2026

...Category Construction Bid Method Whole Item Type RFQ - Request for Quote Description ...

City of Los Angeles

Bid Due: 11/23/2026

...Basic Information Title Progressive Design-Build Independent Cost Estimator Services for the Kane... Restoration ...

State Government of California

Bid Due: 11/19/2026

...RFP / RFQ / RFO / RFI DATE POSTED DUE DATE Request for ...

San Francisco Unified Public School District

Bid Due: 11/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.