| Location: | Utah |
|---|---|
| Posted: | May 4, 2025 |
| Due: | May 22, 2025 |
| Agency: | City of West Valley City |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PAYSON2025ST001 |
| Publication URL: | To access bid details, please log in. |
Project Description: Furnish all labor, equipment and materials required to remove and replace asphalt pavement, mill and overlay asphalt pavement, install storm drain pipe and structures, install concrete curb, gutter, sidewalk, and drive approaches, and remove and replace 1” water service laterals. All work to be done according to plans, Payson City and APWA Standards and Specifications

With GovernmentContracts, you can:
...drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, ...
State Government of Utah
Bid Due: 11/19/2026
...includes the replacement of 4" asbestos cement pipe (abandoned in place) with 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2027
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 12/01/2026