| Location: | Missouri |
|---|---|
| Posted: | Jul 1, 2026 |
| Due: | Aug 12, 2026 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | SL District, City of O'Fallon, Roadway resurfacing, construction of a roundabout intersection, storm sewer replacement, etc. | 7/1/26 | 8/12/26 |
REQUEST FOR BID STP-7302(690) Main Street Ph 3
Page 2 of 314
INVITATION TO BID
City of O'Fallon, MO
Main St. Phase 3 STP-7302(690)
Bid No. 26-031
Sealed bids addressed to City of O'Fallon, 100 North Main Street, O'Fallon, MO 63366 for the proposed work will
be received by the City of O'Fallon, MO until 2:00pm (prevailing local time) on August 12, 2026 at the office of the City
of O'Fallon, 100 North Main Street, O'Fallon, MO 63366, and at that time will be publicly opened. Bids may be hand
delivered to the Purchasing Agent of the City of O'Fallon during City Hall hours, Monday through Friday, 8:30 a.m.
and 4:30 p.m. Mailed proposals are accepted with regular mail service. Bids should be delivered to: City of O'Fallon,
100 North Main Street, O'Fallon, MO 63366.
The proposed work includes: Roadway resurfacing, construction of a roundabout intersection, storm sewer replacement,
sidewalk and curb ramp improvements, and decorative lighting along Main Street between the NSRR tracks and St. Joseph
Ave.
Contract Documents are on file at the office of Drexel Technologies at http://planroom.drexeltech.com and are open for
public inspection. Copies of documents may be obtained from Drexel Technologies for the fee listed online.
Communications between the bidders and the City shall be conducted and documented in writing through the use of email
communication to ptalimonchuk@ofallonmo.gov. No oral interpretation will be recognized.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate
of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations
(Federal Wage Rate), or state wage rate, whichever is higher.
The City of O'Fallon, Missouri hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, disadvantaged business owned and controlled by socially and economically disadvantaged
individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.
All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for
highway Construction, 2025 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to
bid opening. The project will be awarded to the lowest, responsive, responsible bidder.
Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA
construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be
completed by their on-site employees within sixty (60) days of beginning work on the construction project.
A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal.
The City of O'Fallon reserves the right to reject any or all bids.
The DBE goal for this project is 0%
No 2nd tier subcontracting will be allowed on this project

With GovernmentContracts, you can:
...of Florissant's, grading, sidewalk installation, pavement repair, mill and overlay, entrance reconstruction, and ...
Missouri Department of Transportation(MDOT)
Bid Due: 9/09/2026
...of storm sewer pipes and inlets along with pavement improvements for the long-term ...
City of Joplin
Bid Due: 9/22/2026
...and storm sewer construction, concrete box culvert extensions and sidewalk improvements in Baldwin ...
Drexel Technologies
Bid Due: 9/30/2026
...and storm sewer construction, concrete box culvert extensions and sidewalk improvements in Baldwin ...
Drexel Technologies
Bid Due: 9/30/2026