| Location: | California |
|---|---|
| Posted: | Aug 21, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | City of Compton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications. The project location will be Tucker Street, Bradfield Ave, and Greenleaf Blvd.
Bid Document: 2026 - Public Works - Specs_Annual Residential Street Rehabilitation-Phase 2D_08-03-26
Plan Document: 2026 - Plans Annual Residential Street Rehabilitation-Phase 2D_06-07-21

With GovernmentContracts, you can:
...Opportunity ID 231882 Organization City of Los Angeles Department Water & Power Stage ...
City of Los Angeles
Bid Due: 9/22/2026
...to the City of San Mateo in an amount not less than ten ...
City of San Mateo
Bid Due: 10/08/2026
...damage with limits of not less than the following: General Aggregate ($,1,000,000), Each ...
Community Development Commission of the County of Los Angeles
Bid Due: 9/24/2026
..., and environmental damage with limits of not less than the following: General ...
Community Development Commission of the County of Los Angeles
Bid Due: 9/24/2026