| Location: | California |
|---|---|
| Posted: | Aug 21, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | City of Compton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications. The project location will be Tucker Street, Bradfield Ave, and Greenleaf Blvd.
Bid Document: 2026 - Public Works - Specs_Annual Residential Street Rehabilitation-Phase 2D_08-03-26
Plan Document: 2026 - Plans Annual Residential Street Rehabilitation-Phase 2D_06-07-21

With GovernmentContracts, you can:
...) operates the Calera Creek Water Recycling Plant (CCWRP) and its Collection System ...
City of Pacifica
Bid Due: 10/02/2026
...to submit bids for construction of the Capital Improvement Project (CIP) 2528 - ...
City of Los Angeles
Bid Due: 10/30/2026
...water service area. MSWD also provides sewer service to approximately 26,000 customers in ...
Mission Springs Water District
Bid Due: 10/06/2026
...237110: Water and Sewer Line and Related Structures Construction Construction 237130: Power... Angeles ...
City of Los Angeles
Bid Due: 9/30/2026