| Location: | Connecticut |
|---|---|
| Posted: | May 12, 2026 |
| Due: | May 28, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | UCHC4-215943838 |
| Publication URL: | To access bid details, please log in. |
Prequalification: CT7 Inpatient and Research Renovations
The project consists of the renovation of approximately 1,000 square feet of existing clinic storage space to accommodate a new research laboratory for the Metabolic Chamber and a clean supply room for the JDH Short Stay Unit. Work includes selective demolition; construction of new partition walls; installation of new flooring, ceilings, and finishes; and modifications to the mechanical, plumbing, electrical, fire protection, and fire alarm systems. Infection Control Risk Assessment (ICRA) and Life Safety measures will be implemented throughout construction to maintain hospital operations and ensure patient and staff safety. Applicants must be pre-qualified by the Department of Administrative Services (DAS), for the Classification of GENERAL BUILDING CONSTRUCTION (GROUP C) to participate in this Prequalification Application.
Matthew Rood rood@uchc.edu

With GovernmentContracts, you can:
...Vine Rehoboth re-bid Sheldon Oak Central Inc. (SOC) seeks bids for General Contractor ...
State Government of Connecticut
Bid Due: 9/08/2026
...: 238210 - Electrical Contractors and Other Wiring Installation Contractors Place of Performance... ...
DEPT OF DEFENSE
Bid Due: 8/14/2026