| Location: | North Carolina |
|---|---|
| Posted: | May 12, 2026 |
| Due: | Jun 10, 2026 |
| Agency: | Division of Highways |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
PR35401 Division-Wide
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
HIGHWAY DIVISION 2
IQ/IQ PROPOSAL
DATE AND TIME OF BID OPENING: June 10, 2026 AT 2:00 PM
CONTRACT ID: PR35401
WBS ELEMENT NO.: TBD
FEDERAL AID NO.: TBD
COUNTY: Beaufort, Carteret, Craven, Greene, Jones, Lenoir, Pamlico and Pitt
Counties
TIP NO.: NONE
MILES: NONE
ROUTE NO.: VARIOUS
LOCATION: DIVISION 2
TYPE OF WORK: EMERGENCY
NOTICE:
ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF
GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF
NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING
BOARD FOR CONTRACTORS WHEN BIDDING ON ANY NON-FEDERAL AID PROJECT WHERE THE
BID IS $30,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE
LICENSING BOARD. BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS
REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR
CONDITIONING AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS ON
BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL
COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA FOR
LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
THIS IS A ROADWAY PROJECT. BID BOND IS NOT REQUIRED.
NAME OF BIDDER
ADDRESS OF BIDDER
PR35401 Division-Wide
PROPOSAL FOR THE CONSTRUCTION OF
CONTRACT No. PR35401 IN Beaufort, Carteret, Craven, Greene, Jones, Lenoir, Pamlico and Pitt Counties,
NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION,
RALEIGH, NORTH CAROLINA
The Bidder has carefully examined the location of the proposed work to be known as Contract No. PR35401; has
carefully examined the plans and specifications, which are acknowledged to be part of the proposal, the special
provisions, the proposal, the form of contract; and thoroughly understands the stipulations, requirements and
provisions. The undersigned bidder agrees to be bound upon his execution of the bid and subsequent award to him
by the Department of Transportation in accordance with this proposal. Payment and performance bonds are not
required on this project. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and
other means of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary
to perform and complete the said contract in accordance with the 2024 Standard Specifications for Roads and
Structures by the dates(s) specified in the Project Special Provisions and in accordance with the requirements of the
Engineer, and at the unit or lump sum prices, as the case may be, for the various items given on the sheets contained
herein.
The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the
work and required labor to construct and complete Contract No. PR35401 in Beaufort, Carteret, Craven, Greene,
Jones, Lenoir, Pamlico and Pitt Counties, for the unit or lump sum prices, as the case may be, bid by the Bidder in
his bid and according to the proposal, plans, and specifications prepared by said Department, which proposal, plans,
and specifications show the details covering this project, and hereby become a part of this contract.
The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for
Roads and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into
and made a part of this contract; that, except as herein modified, all the construction and work included in this contract
is to be done in accordance with the specifications contained in said volume, and amendments and supplements thereto,
under the direction of the Engineer.
If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer
or such other person as may be designated by the Secretary to sign for the Department of Transportation. The
conditions and provisions herein cannot be changed except over the signature of the said Contract Officer or Division
Engineer.
The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as
the basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item
or portion of the work as may be deemed necessary or expedient.
An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease
in the unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.
27910
M aryVMoore
05/12/2026
PR35401 Division-Wide
TABLE OF CONTENTS
COVER SHEET
PROPOSAL SHEET
PROJECT SPECIAL PROVISIONS
INTERESTED PARTIES LIST NOT REQUIRED: ................................................................ G-1
MANDATORY PRE-BID CONFERENCE (Prequalifying To Bid): ....................................... G-1
BOND REQUIREMENTS - No Bonds Required.................................................................... G-2
HAUL ROADS: ...................................................................................................................... G-2
BUILD AMERICA, BUY AMERICA (BABA): ..................................................................... G-2
CONTRACT TIME FOR ID/IQ: ............................................................................................. G-6
NON-EXCLUSIVE CONTRACT: .......................................................................................... G-7
WORK ORDER ASSIGNMENT (MULTIPLE AWARDS) FOR ID/IQ: ................................ G-7
EXTENSION OF CONTRACT TIME: ................................................................................... G-7
DISPUTE RESOLUTION PROCESS FOR ID/IQ: ................................................................. G-8
RENEWAL OF CONTRACT (FIXED PRICE ADJUSTMENT): ........................................... G-8
PAYMENT: ............................................................................................................................ G-8
NO MAJOR CONTRACT ITEMS: ......................................................................................... G-9
NO SPECIALTY ITEMS: ....................................................................................................... G-9
SCHEDULE OF ESTIMATED COMPLETION PROGRESS:................................................ G-9
DISADVANTAGED BUSINESS ENTERPRISE (DIVISIONS): .......................................... G-10
MULTI-YEAR MAINTENANCE CONTRACTS (ID/IQ): ................................................... G-23
CERTIFICATION FOR FEDERAL-AID CONTRACTS: ..................................................... G-24
RESTRICTIONS ON ITS EQUIPMENT AND SERVICES: ................................................ G-24
USE OF UNMANNED AIRCRAFT SYSTEM (UAS):......................................................... G-24
EQUIPMENT IDLING GUIDELINES: ................................................................................ G-25
U.S. DEPARTMENT OF TRANSPORTATION HOTLINE: ................................................ G-25
ROADWAY ........................................................................................................................... R-1
STANDARD SPECIAL PROVISIONS
AVAILABILITY OF FUNDS - TERMINATION OF CONTRACTS ................................ SSP-1
ERRATA ............................................................................................................................ SSP-2
PLANT AND PEST QUARANTINES................................................................................ SSP-5
TITLE VI AND NONDISCRIMINATION: ........................................................................ SSP-6
MINORITY AND FEMALE EMPLOYMENT REQUIREMENTS .................................. SSP-15
REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTR CONTRACTS ...... SSP-17
ON-THE-JOB TRAINING ............................................................................................... SSP-32
MINIMUM WAGES ........................................................................................................ SSP-35
MINIMUM WAGES ........................................................................................................ SSP-40
UNIT PROJECT SPECIAL PROVISIONS
SIGNATURE SHEETS AND FORMS................................................................................. S-1
PR35401 Division-Wide
BID/PAY ITEM SHEETS..................................................................................................... T-1
DOT EXECUTION SHEET ................................................................................................. U-1
PR35401 Division-Wide
INSTRUCTIONS TO BIDDERS
PLEASE READ ALL INSTRUCTIONS CAREFULLY
BEFORE PREPARING AND SUBMITTING YOUR BID.
All bids shall be prepared and submitted in accordance with the following requirements. Failure to
comply with any requirement may cause the bid to be considered irregular and may be grounds for
rejection of the bid.
TRADITIONAL PAPER BIDS:
1. Download the entire proposal from the Connect NCDOT website and return the entire proposal with your
bid.
2. In accordance with Article 102-3 of the Standard Specifications, registration on the Interested Parties List
is required unless SP1 G02 Interested Parties List Not Required provision is included in the proposal.
3. All entries on the itemized proposal sheet (bid form) shall be written in ink or typed.
4. The Bidder shall submit a unit price for every item on the itemized proposal sheet. The unit prices for the
various contract items shall be written in figures. Unit prices shall be rounded off by the Bidder to contain
no more than FOUR decimal places.
5. An amount bid shall be entered on the itemized proposal sheet for every item. The amount bid for each item
shall be determined by multiplying each unit bid by the quantity for that item, and shall be written in figures
in the "Amount" column of the form.
6. The total amount bid shall be written in figures in the proper place on the bid form. The total amount bid
shall be determined by adding the amounts bid for each item.
7. Changes to any entry shall be made by marking through the entry in ink and making the correct entry
adjacent thereto in ink. A representative of the Bidder shall initial the change in ink. Do not use correction
fluid, correction tape or similar product to make corrections.
8. The bid shall be properly executed on the included Execution of Bid - Non-collusion, Debarment and
Gift Ban Certification form. All bids shall show the following information:
a. Name of corporation, partnership, Limited Liability Company, joint venture, individual or firm,
submitting bid.
Corporations that have a corporate seal shall include it on the bid, otherwise write your corporations
name in the seal location.
b. Name of individual or representative submitting bid and position or title held on behalf of the bidder.
c. Name, signature, and position or title of witness.
9. The bid shall not contain any unauthorized additions, deletions, or conditional bids.
10. The Bidder shall not add any provision reserving the right to accept or reject an award, or to enter into a
contract pursuant to an award.
11. THE PROPOSAL WITH THE ITEMIZED PROPOSAL SHEET ATTACHED SHALL BE PLACED
IN A SEALED ENVELOPE AND SHALL BE DELIVERED TO AND RECEIVED IN THE NCDOT
DIVISION PROJECT DEVELOPMENT OFFICE, LOCATED AT 1037 WH Smith Blvd Greenville,
NC 27834, BY 2:00 PM ON, June 10, 2026.
12. The sealed bid must display the following statement on the front of the sealed envelope:
QUOTATION FOR - CONTRACT ID PR35401 - ID/IQ CUT AND SHOVE 2026 IN DIVISION 2
TO BE OPENED AT 2:00 PM ON, June 10, 2026.
As well as the following information:
a. Name of corporation, partnership, Limited Liability Company, joint venture, individual or firm,
submitting bid.
b. Name of individual or representative submitting bid and position or title held on behalf of the bidder.
c. Address of corporation, partnership, Limited Liability Company, joint venture, individual or firm,
submitting bid.
d. SAP Vendor Number of corporation, partnership, Limited Liability Company, joint venture, individual
or firm, submitting bid.
PR35401 Division-Wide
e. Contractor License Number, if available, of corporation, partnership, Limited Liability Company, joint
venture, individual or firm, submitting bid.
13. If delivered by mail, the sealed envelope shall be placed in another sealed envelope and the outer envelope
shall be addressed as follows:
N. C. DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS, DIVISION 2
ATTN: Mary Moore, PE
1037 WH Smith Blvd
Greenville, NC 27834
14. Questions should be emailed 7 calendar days prior to the bid opening to Mary Moore, PE at
MVMOORE@NCDOT.GOV. Contact with any other NCDOT personnel concerning this project is strictly
prohibited, unless otherwise noted, and may result in bids being considered non-responsive.
PR35401 G-1 Division-Wide
PROJECT SPECIAL PROVISIONS
GENERAL
INTERESTED PARTIES LIST NOT REQUIRED:
(6-21-22)(Rev. 2-20-24) 102 SP1 G02
Revise the Standard Specifications as follows:
The Interested Parties List sign up process is not applicable to this contract.
Page 1-13, Article 102-3 PROPOSALS AND INTERESTED PARTIES LIST, lines 12-15,
delete the first paragraph.
Page 1-14, Article 102-8 PREPARATION AND SUBMISSION OF BIDS, lines 43-44, delete
the first sentence of the first paragraph.
MANDATORY PRE-BID CONFERENCE (Prequalifying To Bid):
(7-18-06) (Rev. 12-23-25) SPI 1-14A
In order for all prospective bidders to have an extensive knowledge of the project, all prospective
bidders shall attend a mandatory pre-bid conference at May 26, 2026 at 10:00 am.
Division 2 MOST Conference Room
2815 Rouse Road EXTENSION
Kinston NC 28504
(Directly across the street from the Kinston Regional Jetport Terminal)
For any questions about the pre-bid conference, please contact:
Mary Voelker Moore
Division Contract Engineer
mvmoore@ncdot.gov
252-439-2828
The pre-bid conference will include a thorough discussion of the plans, contract pay items, special
provisions, etc.
Only bidders who have attended and properly registered at the above scheduled pre-bid conference
and who have met all other prequalification requirements will be considered prequalified to bid on
this project. A bid received from a bidder who has not attended and properly registered at the
above scheduled pre-bid conference will not be accepted and considered for award. There is not
a virtual or call-in option for this mandatory pre-bid conference.
Attendance at the pre-bid conference will not meet the requirements of proper registration unless
the individual attending has registered at the pre-bid conference in accordance with the following:
PR35401 G-2 Division-Wide
(A) The individual will ensure his name and all required information has been recorded on the
official roster no later than 10 minutes after the above noted time for the beginning of the
conference. Attendees can request that the names and their companies' names on the
official roster be read aloud.
(B) The individual has written in the name and address of the company he or she represents.
(C) Only one company has been shown as being represented by the individual attending.
(D) The individual attending is an officer or permanent employee of the company they are
representing.
Attendance at any prior pre-bid conference will not meet the requirement of this provision.
BOND REQUIREMENTS - No Bonds Required
(6-1-16)(Rev. 1-16-24) SPD 01-420B
The provisions of Articles 102-10 and 103-7 of the Standard Specifications are waived for this
project. No bonds required.
HAUL ROADS:
(7-16-24) 105 SP1 G04
Revise the Standard Specifications as follows:
Page 1-45, Article 105-15 RESTRICTION OF LOAD LIMITS, line 31, add the following after
second sentence of the second paragraph:
At least 30 days prior to use, the Contractor shall notify the Engineer of any public road proposed
for use as a haul road for the project.
BUILD AMERICA, BUY AMERICA (BABA):
(11-15-22)(Rev. 4-21-26) 106 SP1 G05 B
Revise the Standard Specifications as follows:
Page 1-47 and 1-48, Article 106-1 GENERAL REQUIREMENTS, lines 30-47 and 1-49, delete
and replace Article 106-1 with the following:
106-1 MATERIALS AND MANUFACTURING
(A) General Requirements
The Contractor shall furnish materials that conform to all contract requirements, are suitable
for their intended use, and are free from defects. All materials used in the work shall meet the
requirements of the contract and shall be subject to inspection, test, or rejection by the
Engineer. All materials permanently incorporated into the completed work shall be new,
unless otherwise specified in the contract or as approved by the Engineer.
PR35401 G-3 Division-Wide
The Contractor is responsible for selecting, procuring, and delivering materials of the types
and quantities necessary to perform the work and meet contract requirements. Delays in
material delivery or quality control do not relieve the Contractor of obligations for schedule
or quality.
All materials incorporated into the work shall be approved before use. Approval is based on
testing, certification, or both, as required by the contract. Department review or acceptance
does not relieve the Contractor of responsibility for material compliance. The Department
may inspect, sample, and test materials at any time before, during, or after installation.
Materials shall be handled, stored, and protected to prevent damage, contamination, or
deterioration. Materials determined to be defective, damaged, contaminated, or otherwise not
in compliance shall be rejected and promptly removed from the project.
To facilitate inspection and testing, the Contractor shall furnish a complete statement of
origin for all materials, including certifications or samples when requested. This information
shall be submitted to the Materials and Tests Unit when required by the contract or as
directed by the Engineer, in advance of fabrication, shipment, or use to allow for appropriate
inspection.
The Contractor shall furnish Safety Data Sheets (SDS) for all paints and hazardous chemicals
proposed for use on the project, in accordance with the North Carolina Hazard
Communication Standard, 29 CFR 1910.1200 and NCGS 95-174.
The Contractor shall provide access, equipment, means and assistance for the verification and
calibration of any devices used in testing, measurement, or documentation of materials.
If the Contractor proposes to use materials from local deposits not identified in the contract,
the Contractor shall be responsible for preliminary sampling, source approval, and
production of acceptable material. Preliminary samples shall be furnished at no cost to the
Department. If requested in writing, the Department may perform sampling, with costs to be
charged to the Contractor as determined by the Engineer.
Sampling or testing by the Department does not constitute pre-approval or acceptance of
material. The Contractor remains responsible for ensuring quality and uniformity of all
materials produced or delivered, including those from local deposits. The Contractor shall
indemnify and hold harmless the Department from any claims, costs, or damages related to
the development or use of such sources, including, but not limited to, failure to meet quantity
or quality requirements.
Materials covered by Subarticles 106-1(B) and 106-1(C) shall comply with applicable
domestic content requirements, including those for iron and steel, construction materials, and
manufactured products.
(B) Domestic Material Requirements
Domestic material requirements apply to iron and steel products permanently incorporated
into any project in accordance with 23 U.S.C. 313, 23 CFR 635.410, and NCGS 136-
28.7. Construction materials and manufactured products permanently incorporated into the
PR35401 G-4 Division-Wide
work are subject to domestic-content requirements only on Federal-aid projects, in
accordance with 23 U.S.C. 313, Build America Buy America Act (IIJA 70914), 2 CFR
184, and as implemented for the Federal-aid highway program through 23 CFR Part 635.410.
All iron or steel products, construction materials, and manufactured products subject to
domestic content requirements shall be of domestic origin and meet the applicable
requirements of the contract based on the project's funding source.
Before any materials are delivered to the project, the Contractor shall submit a notarized
letter acknowledging their understanding of the domestic material requirements for the
specific contract. This acknowledgment is a contract-level affirmation that the Contractor is
responsible for ensuring that no iron or steel product, construction material, or manufactured
product subject to domestic content requirements is permanently incorporated into the work
without the required certification. This acknowledgment does not substitute for product-level
certifications from the manufacturer or supplier. The Department reserves the right to deny or
recover payment for any material incorporated into the work without valid documentation.
For iron and steel, all manufacturing processes must occur in the United States.
For construction materials, all manufacturing processes must occur in the United States.
For manufactured products, final assembly must occur in the United States.
Before any iron or steel product, construction material, or manufactured product subject to
domestic content requirements is eligible for payment, the Contractor shall submit a
certification from the manufacturer or supplier confirming compliance with the applicable
regulations. A separate certification is required for each shipment or delivery and must
clearly identify the items covered, linked to the associated bill of lading, invoice, or packing
list.
The Contractor shall ensure that all required certifications from the manufacturer or supplier
are obtained and submitted to the Engineer prior to payment for any iron or steel product,
construction material, or manufactured product subject to domestic content requirements.
The Engineer will retain documentation in accordance with Department procedures.
Compliance with domestic material requirements is the responsibility of the Contractor,
based on certifications and documentation provided by the manufacturer or supplier.
(C) Material Category Requirements
(1) Iron and Steel Products
Items are considered iron or steel products if they consist wholly or predominantly of iron
or steel. Predominantly means the cost of iron or steel components exceeds 50% of the
total cost of all product components.
All steel and iron products that are permanently incorporated into the work shall be
produced in the United States. This includes any such item that is melted, cast, rolled,
formed, shaped, drawn, extruded, forged, fabricated, finished or otherwise processed in
the manufacture of the product. Coatings applied to iron and steel products shall also be
applied in the United States.

With GovernmentContracts, you can:
Follow Multiple Building Fire Exhaust Systems Repairs Active Contract Opportunity Notice ID N4008526R9059
DEPT OF DEFENSE
Bid Due: 8/05/2026
Follow 43d Air Mobility Squadron_ Request for Proposal_FA445226R0012_B753 Kitchen Renovation Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 8/05/2026
Follow Multiple Base-wide Location Fencing Repairs Active Contract Opportunity Notice ID N4008524R9072 Related
DEPT OF DEFENSE
Bid Due: 8/20/2026
Project: Federal Pipe Video Contracts Ref. #: 269- 2026-235 Department: City Procurement Type:
City of Charlotte
Bid Due: 8/24/2026