| Location: | Texas |
|---|---|
| Posted: | Sep 4, 2025 |
| Due: | Oct 21, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25CSP007 |
| Publication URL: | To access bid details, please log in. |
25CSP007
Posted
Lana Beranek
(512) 232-7037
lana@austin.utexas.edu
10/21/2025
11:00 AM
721
21+ Days for Solicitation Notice
9/4/2025
9/4/2025 9:03 am
90922-Building Construction, Non-Residential (Office Bldg., Etc.);
90924-Building Construction, Commercial And Institutional;
99042-*Fire Alarm and Safety Services, Including Installation of Equipment;
91132-C.I.P., Fire Alarm System;
34016-Fire Alarm Systems, Power Sirens, And Controls;
The scope of work for this project is for the complete replacement of the Fire Alarm (FA) system for the Hal. C. Weaver Power Plant Expansion. The scope includes, but is not limited to demo and replacement of: User end devices, audio visual devices, sensing devices, and system monitoring panel. Additionally, the scope shall include installation of interconnecting wires. The work shall be done according to design documents and pass final inspection. The new installation shall be new code compliant throughout the entire building.

With GovernmentContracts, you can:
...("PPE") and Cover-Up Equipment Addenda: 0 Release Date: 5/26/2026 Due Date: 7/1/2026 Follow ...
Granbury city
Bid Due: 7/01/2026
...("PPE") and Cover-Up Equipment (On-Site at City of Granbury) Addenda: 0 Release Date: ...
Granbury city
Bid Due: 7/01/2026
...all contractors must and the use of personal protective equipment (PPE) (i.e., mask ...
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 6/05/2026