| Location: | Texas |
|---|---|
| Posted: | Aug 13, 2025 |
| Due: | Aug 28, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12639525Q0178 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This USDA-Animal and Plant Health Inspection Service construction requirement is for the renovation os restrooms in building 6414 at Moore Air Base in Edinburg, Texas. Building 6414 houses the Insect Management and Molecular Diagnostics Laboratory.
Work includes demolition of existing walls, ceiling, floor tile, wall tile, counters, sinks, metal lockers, partitions, plumbing fixtures, mirrors.
New walls will be constructed with metal studs and gypsum board; new sheetrock, 2x2 ceiling tiles, flooring, shower tiles, vinyl cove base, door trim, vanity, touchless fixtures. Work also includes demo of existing slab to install new sewer pipe to reroute sanitary sewer line to new sanitary sewer service, new lockers, partitions.
This solicitation is set aside for small business firms only. The NAICS code is 236220 – Commercial and Institutional Building Construction, with a small business size standard of $45 million. The estimated magnitude of the project is between $250,000 and $500,000.
It is the responsibility of interested parties to monitor this site for amendments, if any. Questions concerning this synopsis should be directed to Jim Roloff, contracting officer, at james.g.roloff@usda.gov.
The solicitation documents are posted below.
Amendment 1 to correct set aside language is posted below.
Attachment 3 is posted below.
NOTE: Block 11 of the SF 1442 is silent on number of days to complete the project. However, this is from page 6 of the solicitation:
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within five calendar days after
the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete
the entire work ready for use 120 days after notice to proceed. The time stated for completion shall
include final cleanup of the premises.
Site visit attendance posted below.
| Jul 29, 2025 | [Solicitation (Updated)] Renovate Restrooms, Moore Air Base, TX |
| Aug 5, 2025 | [Solicitation (Updated)] Renovate Restrooms, Moore Air Base, TX |
| Aug 12, 2025 | [Solicitation (Updated)] Renovate Restrooms, Moore Air Base, TX |
| Aug 19, 2025 | [Solicitation (Updated)] Renovate Restrooms, Moore Air Base, TX |

With GovernmentContracts, you can: