| Location: | Georgia |
|---|---|
| Posted: | Oct 8, 2026 |
| Due: | Nov 11, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-64750-NONST-2027-000000231 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-64750-NONST-2027-000000231 | Bid Ref. #27-030 Albany Pipe Rehabilitation - Phase I | Albany, City Of |
Oct 08, 2026 @ 08:47 AM
|
Nov 11, 2026 @ 02:30 PM
|
Start Date: Oct 08, 2026 @ 08:47 AM ET
End Date:
Nov 11, 2026 @ 02:30 PM ET
Sealed Bids will be received by the City of Albany, Procurement Division, 222 Pine Avenue, Suite
260, Albany, Georgia 31701, until 2:30 p.m. on November 11, 2026, for all work required for the
pre-rehabilitation cleaning, inspection, and rehabilitation of approximately 5,000 linear feet of large
diameter sanitary sewer mains and 15 sanitary manholes along Schley Avenue between McLain Lane
and Lift Station #67 in accordance with bid documents, specifications, and all other contract documents
contained herein. Bids will be opened and publicly read aloud at the above stated time and place.
| Code | Description |
| 91356 | Construction, Utility and Underground Projects |
| 91389 | Maintenance and Repair, Utility and Underground Projects |
| 95895 | Utility Management Services |
| 96183 | Utility Services, Electric |
| 96184 | Utility Services, Gas |
| 96185 | Utility Services, Water |
| 96291 | Utility Locator Service, Underground |
| 96863 | Relocation and or Removal Services for Utility Works |
Ricky Gladney
rgladney@albanyga.gov
229-302-1455
October 8, 2026
INVITATION TO BID
Albany Pipe Rehabilitation - Phase I
Bid Reference No. 27-030
Sealed Bids will be received by the City of Albany, Procurement Division, 222 Pine Avenue, Suite
260, Albany, Georgia 31701, until 2:30 p.m. on November 11, 2026, for all work required for the
pre-rehabilitation cleaning, inspection, and rehabilitation of approximately 5,000 linear feet of large
diameter sanitary sewer mains and 15 sanitary manholes along Schley Avenue between McLain Lane
and Lift Station #67 in accordance with bid documents, specifications, and all other contract documents
contained herein. Bids will be opened and publicly read aloud at the above stated time and place.
A Pre-Bid Conference will be held on October 15, 2026, at 10:00 a.m. at 323 Pine Avenue, Suite
203, Albany, Georgia 31701 and simultaneously on Zoom. The Project Manager will provide an
overview of the work to be performed and answer questions. All interested bidders are strongly
encouraged to attend. Zoom link:
https:// us06web.zoom.us/j/85034492683?pwd=VabzzZjZcaND9ibKSqi3YfoZl bEDqo. l
Meeting ID: 850 3449 2683 Passcode: 239005
A 5% Bid Bond is required of all bidders. Bid bond must be present for bid to be read or
considered. 100% Performance and Payment bonds will be required of the successful bidder. This
project will be bid on a unit price basis for all specified work and will be awarded to the responsive
and responsible bidder submitting the lowest total base bid.
The City of Albany strongly encourages Small Business firms to participate in this bid. The City of Albany
reserves the right to reject any and all bids and to waive any informalities in the bidding process. Bid
documents are available at the Procurement Division, www.albanyga.gov and on the Georgia
Procurement Registry.
For additional information, contact Ricky Gladney, Buyer I, at 229-302-1455. Submit all questions
via email to rgladney@albanyga.gov cc: jswilliams@albanyga.gov and kross@albanyga.gov. The deadline
for questions is October 29, 2026, at 2:30 p.m. Replies of substance will be answered in the form of
an addendum and made available to all potential bidders.
Albany, _
jJ~
J shua Williams, CPPB
rocurement Manager
FINANCE
P.O. BOX 447 ALBANY, GA 31702 I PHONE: 229.431.3211 I FAX: 229.431.2184 I www.albanyga.gov
CITY OF ALBANY
FINANCE DEPARTMENT
PROCUREMENT DIVISION
ALBANY, GEORGIA
INSTRUCTIONS TO BIDDERS
These instructions will bind bidders to terms and conditions herein set forth, except as specifically qualified in special bid and
contract terms issued with any individual bid.
1. The following criteria are used in determining low responsible bidder.
(a) The ability, capacity and skill of bidder to perform required service.
(b) Whether bidder can perform service promptly or within specified time.
(c) The character, integrity, reputation, judgment, experience and efficiency of bidder.
(d) The performance of previous contracts.
(e) The suitability of equipment or material for City use.
(f) The ability of bidder to provide future maintenance and parts service.
2. Payment terms are Net 30 unless otherwise specified. Favorable term discounts may be offered and will be considered in
determining low bids if they are deemed advantageous to The City.
3. Unless otherwise specified all materials, supplies or equipment quoted herein must be delivered within thirty (30) days from
date of notification of award or by exception noted on bid sheet.
4. Prospective bidders are responsible for examining the location of the proposed work or delivery and determining, in their
own way, the difficulties, which are likely to be encountered in the execution of same.
5. The ESTIMATED QUANTITY given in the specifications or advertisement is for the purpose of bidding only. The City may
purchase more or less than the estimated quantity, and the bidder must not assume that such estimated quantity is part of
the contract.
6. All bids should be tabulated, totaled and checked for accuracy. The unit price will prevail in case of errors.
7. All requested information should be included in the sealed bid envelope. All documents and information must be signed and
included for your bid to receive full consideration. Failure to submit any required information or document will be
cause for bid to be rejected as non-responsive.
8. Failure of the bidder to sign the bid document or have the signature of any authorized representative or agent on the bid in
the space provided will be cause for rejection of the bid. Signature(s) must be written in ink.
9. Failure to enclose bid bond, where required, will result in rejection of the bid. Bond may be in the form of cash,
certified check, cashier's check or Surety Bond issued by a Surety Company licensed to conduct business in Georgia.
10. All bidders should provide their tax identification number with the bid.
11. All bidding Corporations should provide the corporate seal, a copy of the Secretary of State's Certificate of Incorporation,
and a listing of the principals of the corporation with the bid.
12. Quote all prices F.O.B. Albany or our warehouse or as specified in bid documents.
13. If the bidder proposes to furnish any item of a foreign make or product, he/she should write "Foreign" together with the
name of the originating country opposite such item on the bid.
14. When requested, SAMPLES will be furnished free of expense, properly marked for identification and accompanied by list
where there is more than one sample. The City reserves the right to mutilate or destroy any samples submitted whenever it
may be in the best interests of The City to do so for the purpose of testing.
15. The City will reject any material, supplies or equipment that do not meet the specifications, even though bidder lists the
trade name or names of such materials on the bid or price quotation form.
16. Any alterations, erasures, additions or omissions of required information or any changes of specifications, or bidding
schedule are done at the risk of the bidder. Any bid will be rejected that has a substantial variation, such as a variation that
affects the price, quality, or delivery date (when delivery is required by a specific time).
17. Each bid or proposal will be submitted in a SEALED ENVELOPE. Additionally, that envelope shall be clearly marked on the
outside as a Sealed Bid with the Bid Number clearly printed.
18. Bids must be received and stamped by the Procurement Office before the date and time stipulated in bid documents. The
City of Albany assumes no responsibility for submittals received after the advertised deadline or at any office or location
other than that specified herein, whether due to mail delays, courier mistake, mishandling, or any other reason. No
responsibility will attach to any City representative or employee for premature opening of bids not properly addressed or
identified.
19. If only one bid is received, the bid may be rejected and/or re-advertised, except in the case of only one known source of
supply.
20. Bids received late will not be accepted, and The City will not be responsible for late mail delivery.
21. Should a bid be misplaced by The City and found later it will be considered.
22. The unauthorized use of patented articles is done entirely at the risk of the bidder.
23. All bidders must be recognized and authorized dealers in the materials or equipment specified and be qualified to instruct in
their application or use. A bidder at any time requested must satisfy the Procurement Office and City Commission that he
has the requisite organization, capital, plant, stock, ability, and experience to satisfactorily execute the contract in
accordance with the provisions of the contract in which he is interested.
Albany Pipe Rehabilitation - Phase I 2
Bid Ref. #27-030
24. Only the latest model equipment, as evidenced by the manufacturer's current published literature will be considered.
Obsolete models of equipment not in production will not be acceptable. Equipment shall be composed of new parts and
materials. Any unit containing used parts or having seen any service other than the necessary tests will be rejected. In
addition to the equipment specifically called for in the specifications, all equipment catalogued by the manufacturer as
standard or required by the State of Georgia shall be furnished with the equipment. Where required by the State of Georgia
Motor Vehicle Code, vehicles shall be inspected and bear the latest inspection sticker of the Georgia Department of
Revenue.
25. All materials, equipment and supplies shall be subject to rigid inspection, under the immediate supervision of the
Procurement Officer and/or the Department to which they are delivered. If defective material, equipment or supplies are
discovered, the contractor, upon being instructed by the Procurement Officer, shall remove, or make good such material,
equipment or supplies without extra compensation. It is expressly understood and agreed that the inspection of materials
by The City will in no way lessen the responsibility of the contractor or release him from his obligation to perform and
deliver to The City sound and satisfactory materials, equipment, or supplies. The contractor agrees to pay the cost of all
tests on defective material, equipment or supplies or allow the cost to be deducted from any monies due him by The City.
26. For multi-year contracts the following clauses pursuant to OCGA 36-60-13 apply: (1) The contract shall terminate absolutely
and without further obligation on the part of The City or County at the close of the calendar year in which it was executed
and at the close of each succeeding calendar year for which it may be renewed; (2) The contract may provide for
automatic renewal unless positive action is taken by The City or County to terminate such contract, and the nature of such
action shall be determined by The City or County and specified in the contract; (3) The contract shall state the total
obligation of The City or County for the calendar year of execution and shall further state the total obligation which will be
incurred in each calendar year renewal term, if renewed; and (4) The contract shall provide that title to any supplies,
materials, equipment, or other personal property shall remain in the vendor until fully paid for by The City.
27. Unless otherwise specified The City reserves the right to award each item separately or on a lump sum basis, whichever is
in the best interest of The City.
28. The successful bidder shall secure all permits, license certificates, inspections (permanent and temporary) and occupational
tax certificate, if applicable, before any work can commence. Contractor as well as any and all known subcontractors must
possess or will be required to obtain a City of Albany Occupational Tax Certificate or Registration.
29. The successful bidder on motor vehicle equipment shall be required to furnish with delivery of vehicle, Certificate of Origin
and Georgia vendors shall provide Georgia Motor Vehicle form MV1.
30. The City reserves the right to reject any and all bids, to waive any informalities in the bid process, and to award the
contract as may be in the best interest of the City and/or re-advertise for bids.
31. Local bidder (domiciled in Albany City Limits) will receive bid in the event of tie bids. In the case of tie bids between out of
town companies or between local concerns, evaluated as equal, bid will be recommended or awarded by chance coin toss,
or drawing straws. The Board of Commissioners passed a local preference ordinance on January 27, 2015.
Where applicable, this ordinance will govern. Local preference will not be a basis for award on bids that are
federally funded.
32. No bidder writing restrictive specifications for The City will be allowed to bid on the project.
33. Reasonable grounds for supposing that any bidder is interested in more than one bid for the same item will be considered
sufficient cause for rejection of all bids in which he/she is interested.
34. A contract will not be awarded to any corporation, firm or individual who is, from any cause, in arrears to The City/County
or who has failed in any former contract with The City to perform work satisfactorily, either as to the character of the work,
the fulfillment of the guarantee, or the time consumed in completing the work.
35. It is mutually understood and agreed that if any time the Procurement Officer shall be of the opinion that the contract or
any part thereof is unnecessarily delayed or that the rate of progress or delivery is unsatisfactory, or that the contractor is
willfully violating any of the conditions or covenants of the agreement, or is executing the same in bad faith, the
Procurement Officer shall have the power to notify the aforesaid contractor of the nature of the complaint. Notification shall
constitute delivery of notice, or letter, to address given in bid/proposal. If after three working days of notification the
conditions are not corrected to the satisfaction of the Procurement Officer, he shall thereupon have the power to take
whatever action he may deem necessary to complete the work or delivery herein described, or any part thereof, and the
expense thereof, so charged, shall be deducted from any paid by The City out of such monies as may become due to the
said contractor, under and by virtue of this agreement. In case such expense shall exceed the last said sum, then and in
that event, the bondsman or the contractor, his executors, administrators, successors, or assigns, shall pay the amount of
such excess to The City on notice by the Procurement Officer of the excess due.
36. Contracts may be cancelled by The City with or without cause with 30-day written notice.
37. Any complaint from bidders relative to the Invitation to Bid or any attached specifications should be made prior to the time
of opening of bids, otherwise such complaint cannot be properly considered.
38. Any bidder may withdraw his bid at any time before the time set for opening of bids. No bid may be withdrawn without
cause in the 60-day period after bids are opened.
39. All questions, inquiries and requests for clarification shall be directed to Procurement.
40. Prior to submission, all bidders are encouraged to check the website at www.albanyga.gov or call the
Procurement Office at 229-431-3211 for any addendums.
PROCUREMENT FORM - Revised 11/18/2021
Albany Pipe Rehabilitation - Phase I 3
Bid Ref. #27-030
SPECIAL INSTRUCTIONS
Albany Pipe Rehabilitation - Phase I
Bid Ref. #27-030
1. General Information: The Albany Pipe Rehabilitation project consists of the pre-rehabilitation
cleaning and inspection, followed by the rehabilitation of existing sanitary manholes and large
diameter sanitary sewer mains in Albany, Georgia. The work is located on the north side of the
city and consists of the following phase:
* Phase 1: Approximately 5,000 feet of sanitary sewer along Schley Avenue between
McLain Lane and Lift Station #67 and 15 manholes.
Bid Document Access & Downloading Protocol:
Bid documents, specifications, and plans may be inspected physically at the Procurement Office,
222 Pine Avenue, Suite 260, Albany, Georgia, and on the Georgia Procurement Registry.
Alternatively, digital bid documents can be viewed and downloaded by visiting www.ardurra.com
and clicking on the BidDocs tab in the upper right corner of the webpage, or by visiting
questcdn.com. Vendors must use the QuestCDN Project Number 10394593 to locate this
specific job on the www.QuestCDN.com website search page. There is a $22 non-refundable
cost for downloading the contract documents in digital PDF format.
All bids shall be deemed to have been made with full knowledge of all terms, conditions, and
requirements contained herein.
2. Contractor Responsibilities & Contract Terms: Contractor's bid shall include all necessary
labor, materials, tools, equipment, and all other items necessary to complete the contract
requirements in accordance with bid documents, special instructions, specifications, and all other
provisions included in this bid document. It is the bidder's responsibility to visit the jobsite and
become familiar with the local conditions.
The contract shall be written for all work required, expressed, or implied, that is necessary to
perform the work described in the bid documents, special instructions, specifications, and all
other contract documents. No money shall be paid for any extra work or modifications to the
specifications unless such work or modification is expressly approved in writing by the owner's
designated representative prior to execution.
3. Bid Form: Bids must be submitted on the form linked in this bid document. Ensure the bid form
is completed in its entirety. Bid is for unit cost contract for all work specified in this bid document.
Bid will be awarded to the responsive and responsible bidder(s) submitting the lowest bid, in the
measure that best benefits the City of Albany.
4. No bid may be withdrawn for a period of sixty (60) days from the bid opening date.
5. Contract Time: Contract must be substantially completed within 180 calendar days following
the issuance of the Notice to Proceed. Performance will be monitored and documented by the
Project Manager. Not completing this contract within the time specified may hamper the
contractor's ability to secure future contracts with the City.
6. Liquidated Damages: Time is an essential element of the Contract, and any delay in the
prosecution of The Work may inconvenience the public, obstruct traffic, or interfere with
business. In addition to the aforementioned inconveniences, any delay in completion of The Work
will always increase the cost of engineering. For this reason, it is important that The Work be
pressed vigorously to completion. Should the Contractor or, in case of default, the Surety fail to
Albany Pipe Rehabilitation - Phase I 4
Bid Ref. #27-030
complete The Work within the time stipulated in the Contract or within such extra time that may
be allowed, charges shall be assessed against any money due or that may become due the
Contractor in accordance at the rate of $500 per calendar day.
7. The General Conditions Contract being utilized is the Engineering Joint Construction
Document linked herein.
8. Liquidated Damages: Time is an essential element of the Contract, and any delay in the
prosecution of The Work may inconvenience the public, obstruct traffic, or interfere with
business. In addition to the aforementioned inconveniences, any delay in completion of The Work
will always increase the cost of engineering. For this reason, it is important that The Work be
pressed vigorously to completion. Should the Contractor or, in case of default, the Surety fail to
complete The Work within the time stipulated in the Contract or within such extra time that may
be allowed, charges shall be assessed against any money due or that may become due the
Contractor in accordance at the rate of $500 per calendar day. These daily charges are
intended to represent the actual damages sustained by the Owner due to the delay, are agreed
upon in advance as a reasonable estimate of such losses, and are expressly considered damages
and not a penalty.
9. General Insurance Requirements: Contractor shall maintain insurance with companies
licensed to do business in the State of Georgia acceptable to the City for the protection of the
City and name it as an additional insured, against all claims, losses, costs or expenses arising out
of injuries or death of persons whether or not employed by contractor, whether arising from the
acts or omission, negligence or otherwise of contractor or any of its agents, employees, patrons,
or other persons, and growing out of work being done by Contractor on behalf of City, such
policies to provide for a liability limit on account of each accident resulting in the bodily injury or
death of not less than One Million ($1,000,000) Dollars, a liability limit of not less than One
Million ($1,000,000) Dollars for each accident for property damage. Contractor shall also
carry product/completed operations liability insurance for personal injuries and/or death in the
amount not less than One Million ($1,000,000) Dollars for any one person. Contractor shall
maintain a combined single liability limit of One Million ($1,000,000) Dollars covering owned,
non-owned, leased, and hired vehicles and name the City of Albany as an additional insured.
Contractor shall furnish to the City satisfactory evidence that it carries Worker's Compensation
Insurance in the statutory limits of Georgia and Employers' Liability with limits of liability of no
less than One Hundred Thousand ($100,000) Dollars of each accident/disease. These
polices must also contain a waiver of subrogation in favor of the City of Albany.
Contractor shall furnish evidence of the continuance in force of said policies by providing copies
of timely declaration page(s) to the Procurement Agent. Acceptable proofs of insurance: (i) a
Certificate of Insurance with Additional Insured Endorsements (a Certificate of Insurance by itself
is not acceptable) or (ii) Declaration Pages of the insurance policies which explicitly name the
City of Albany (P.O. Box 447, Albany, GA 31702) as an additional insured. The Certificate of
Insurance must provide the project name and our project number on all certificates; where the
Project requires Contractor's Pollution Legal Liability coverage or Contractor's Professional E & O
coverage, per project coverage would be allowed. All insurance policies must provide that the
City of Albany will be notified within 30 days of any changes, restrictions, and/or cancellation.
The City's sole judgment shall control as to the sufficiency of the coverage.
10.Indemnification: Contractor agrees to indemnify and hold harmless the City, its agents,
officers, and employees, their successors and assigns, individually and collectively, with respect
to all claims, demands or liability for any injuries to any person (including death) or damage to
any property arising out of the activities of contractor or based on alleged negligence of
Albany Pipe Rehabilitation - Phase I 5
Bid Ref. #27-030
contractor, its officers, agents, or employees and contractor shall defend against all such claims
and pay all expenses of such defense, including attorney fees, and all judgments based thereon;
provided that this obligation shall not extend to any damage, injury or loss due to the negligence
of the City.
11.Superintendent: The contractor shall have a competent, full-time superintendent or designated
representative on the work site at all times while work is being performed. The superintendent
must be fluent in English, capable of reading and thoroughly understanding the project plans and
specifications and experienced in large-diameter utility or pipe rehabilitation work. He or she will
directly represent the contractor, and all directions, notices, or other communications given to
the superintendent by the City's designated Project Manager or inspector shall be as binding as if
given directly to the contractor.
12.Permits and Fees: Within five (5) days following the issuance of the Notice to Proceed the
contractor shall apply for all permits. Failure to do so may result in award of this contract to the
next lowest bidder and the original contractor may be billed for the difference in price. The
contractor shall secure all permits, license certificates, inspections (permanent and temporary)
and Occupational Tax Certificate before any work can commence. This documentation should be
on file in the Procurement Office prior to start of any work associated with this contract. The
contractor is required within five (5) days of completion of specified work to contact
the Project Manager, Andy Griffis, at (229) 302-1806, AGriffis@albanyga.gov for a
final inspection. Successful bidder as well as any and all known subcontractors must possess or
will be required to obtain a City of Albany Occupational Tax Certificate or Registration prior to
award of contract.
13.Preservation of Property: The contractor shall carry out their work with such care and by the
proper methods to prevent damage to the property adjacent to the work or within streets,
easement locations to the extent the owner may have rights therein, or other property of the
owners or of others, whether adjacent to the work site or not, the removal, relocation, or
destruction of which is not called for by the provisions of the contract documents; it being a
condition of the execution of the contract that the work be performed in such manner that the
property of others and other property of the owner shall not be damaged in any way. The word
PROPERTY, as used, is intended to include among other types of property, public street
improvements, storm and sanitary sewers, water lines and appurtenances, or other structures.
Should any property be damaged or destroyed, the contractor at their own expense shall
promptly, or within reasonable time, repair or make such restoration as is practical and
acceptable to the owner of the damaged or destroyed property. Restoration, if necessary, shall
conform to the Owner's or applicable agencies regulations, specifications and/or standard
construction details. In case of failure on the part of the contractor to repair or restore such
property, or make good such damage or injury, the Building Inspector may within forty-eight (48)
hours' notice, proceed to repair, rebuild, or otherwise restore such property as may be necessary,
and the cost thereof will be deducted from any monies due or which may become due the
contractor under this contract agreement. The contractor shall, at all times in performance of
the work, employ approved methods and exercise reasonable care and skill so as to avoid delay,
damage, injury or destruction of existing public service installations and structures; and shall at
all times in the performance of the work avoid interference with, or interruption of, public utilities
services, and shall cooperate fully with the owners thereof to the end.
14.Public Convenience and Safety: Fire hydrants on or adjacent to the street shall be kept
accessible to the fire apparatus at all times and no material or obstructions shall be placed within
ten (10) feet of any hydrant. Adjacent premises must be given access at all times and gutters
Albany Pipe Rehabilitation - Phase I 6
Bid Ref. #27-030
shall not be obstructed. Materials shall not be stored along the streets. Traffic on streets shall be
maintained at all times. Dust and debris shall not create a hazard or a nuisance.
15.Barricades and Warnings: The contractor shall provide, erect, and maintain all necessary
barricades, suitable and sufficient number of watchmen to direct traffic, and take all necessary
precautions for the protection of the work and safety of the public. Barricades and obstructions
shall be illuminated at night and lights shall be kept burning from sunset to sunrise.
16.Removal of Trash and Rubbish: The contractor shall be responsible for the removal and legal
disposal of all waste, trash, and rubbish resulting from the work under this contract. Work site
shall be kept clean and orderly during construction; trash shall be removed from the site or
adequately containerized daily.
17.The Owner of this project is the City of Albany. The Owner reserves the right to reject any
and all bids and to waive any informalities in the bid process and to award the contract as may
be in the best interest of the Owner or re-advertise for bids
18.Compliance: The contractor is responsible for knowledge of and compliance with all laws,
codes, ordinances, and regulations that are applicable to this type of work.
19.Certificate of Non-Collusion: An executed copy of this form must be submitted. (See
Attached).
20.Governing Law and Venue: An executed copy of this form must be submitted. (See Attached).
21.Drug Free Workplace: An executed copy of this form must be submitted. (See Attached).
22.Debarred Bidders Integrity Form: An executed copy of this form must be submitted. (See
Attached).
23.Termination for Convenience: This contract may be terminated in whole or in part by the City
of Albany with the consent of the contractor in which case the two parties shall agree upon the
termination conditions, including the effective date in the case of partial termination, and the
portion to be terminated; or by the contractor upon written notification to the City of Albany
setting forth the reasons for such termination, the effective date, and in the case of partial
termination, the portion to be terminated. However, if in the case of partial termination, the City
of Albany determines that the remaining portion of the award will not accomplish the purposes
for which the contract was awarded, the City of Albany may terminate the contract in its entirety.
24.Termination for Cause: In the event that the contractor shall for any reason or through any
cause be in default of the terms, conditions, or obligations of the contract documents, the City
may give the contractor written notice of such default and terminate the contract. All terms,
conditions, and obligations of the contract documents are considered material. The City may, in
its discretion, provide the contractor an opportunity to cure the default, if curable, prior to
termination. Unless a different duration is provided in the notice of default, the contractor shall
have fourteen (14) calendar days to cure the default from the date such notice is mailed to the
contractor, unless notification is by facsimile or personal delivery, in which case the opportunity
to cure shall commence upon delivery of the notice. Upon failure of the contractor to cure the
default the City may immediately terminate the contract effective as of the mailing or delivery of
the default notice. If the City terminates the contract, the contractor shall remain liable for
performance of all terms, conditions, and obligations through the date of termination.
Albany Pipe Rehabilitation - Phase I 7
Bid Ref. #27-030
Termination by the City shall not constitute a waiver by the City of any other rights or remedies
available to the City by law or contract.
25.Certification of Bidder's Experience and Qualifications: The undersigned bidder certifies
that they are, at the time of bidding, and shall be, throughout the period of the contract, licensed
by the State of Georgia to do the type of work required under terms of the contract documents.
Bidder further certifies that they are skilled and regularly engaged in the general class and type
of work called for in the contract documents. The bidder represents that they are competent,
knowledgeable and have special skills on the nature, extent, and inherent conditions of the work
to be performed. Bidder further acknowledges that there are certain peculiar and inherent
conditions existent in the construction of the particular facilities, which may create, during the
construction program, unusual or peculiar unsafe conditions hazardous to persons and property.
Bidder expressly acknowledges that they have the skill and experience to foresee and to adopt
protective measures to adequately and safely perform the construction work with respect to such
hazards. Suitable evidence of the successful bidder's experience, to include references, must be
submitted with bid.
26.Warranty: Contractor shall guarantee all specified work performed for a period of one (1)
year from the date of written acceptance of the work by the Owner's designated representative
that all materials, labor, and workmanship provided under this contract are free from defects of
any kind. At no expense to the City of Albany, the contractor shall make repairs to any defects
found and reported during the warranty period. Final inspection, final acceptance, and final
payment shall not be construed as a waiver of this warranty. The following are excluded from
this warranty:
a. Defects or failures resulting from abuse by the owner.
b. Damage caused by fire, tornadoes, hail, hurricane, Acts of God, wars, riots, civil
commotion, or vandalism
c. The contractor is not an insurer nor is he a guarantor of the suitability of or adequacy of
design. Any other provisions of this warranty to the contrary notwithstanding, the
contractor shall not be required to remedy any unsuitable or inadequate design.
27.Corporations: All Corporations should provide corporate seal, a copy of the Secretary of State's
Certificate of Incorporation, and a listing of the principals of the corporation with the bid.
28.Pre-Bid Conference: A Pre-Bid Conference will be held on October 15, 2026, at 10:00 a.m.
at 323 Pine Avenue, Suite 203, Albany, Georgia 31701 and simultaneously on Zoom.
The Project Manager will provide an overview of the work to be performed and answer questions.
All interested bidders are strongly encouraged to attend. Zoom link:
https://us06web.zoom.us/j/85034492683?pwd=VabzzZjZcaND9ibKSqi3YfoZ1bEDqo.1
Meeting ID: 850 3449 2683 Passcode: 239005
29.Pre-Construction Conference: Successful bidder will be required to attend a Pre-Construction
Conference with the owner's representative prior to commencement of work under resulting
contract.
30. Georgia Security and Immigration Compliance Act: The successful contractor will provide
certification that they are in compliance with the Georgia Security and Immigration Compliance
Act, certifying that the provisions of GA Law, O.C.G.A 13-10-91, Chapter 300-10-1, per the
Georgia Department of Labor, if applicable, have been complied with in full. Pursuant to O.C.G.A
13-10-90(2), all subcontractors entering into a contract or agreement for hire on this Project
must be registered and participate in the Federal Work Authorization Program. Complete and
Albany Pipe Rehabilitation - Phase I 8
Bid Ref. #27-030
submit a copy of the form, applicable to your company, and applicable Subcontractor Affidavits,
with your bid.
31.Bid Submittals (All items listed below must be submitted with bid):
a. Bid Form
b. Bid Bond
c. DBE Subcontractor Participation Form (attached)
The following items should be submitted with bid:
a. Indemnity Agreement
b. Governing Law and Venue Form
c. Certificate of Non-Collusion Form
d. Drug Free Workplace
e. Debarred Bidders Integrity Form
f. Corporate Seal
g. Secretary of State's Certificate of Incorporation
h. Listing of the principals of Corporation
i. Affidavit to Comply with OCGA 13-10-91
32.For additional information, contact Ricky Gladney, Buyer I, at (229) 302-1455. Submit all
questions via email to rgladney@albanyga.gov cc: jswilliams@albanyga.gov and
kross@albanyga.gov. The deadline for questions is October 29, 2026, at 2:30 p.m. Replies of
substance will be answered in the form of an addendum and made available to all potential
bidders.
Albany Pipe Rehabilitation - Phase I 9
Bid Ref. #27-030
* COMPLETE AND SUBMIT *
BID FORM
CITY OF ALBANY
Albany Pipe Rehabilitation - Phase I
Bid Reference No. 27-030
ARTICLE 1 - BID RECIPIENT
1.01 This Bid is submitted to:
City of Albany,
Procurement Division,
222 Pine Avenue, Suite 260
Albany, Georgia 31701-2531
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner
in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding
Documents for the prices and within the times indicated in this Bid and in accordance with the other terms
and conditions of the Bidding Documents.
ARTICLE 2 - BIDDER'S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation
those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after
the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 - BIDDER'S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items
identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent
areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may
affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost,
progress, and performance of the Work.
D. Bidder has carefully studied all:
Albany Pipe Rehabilitation - Phase I 10
Bid Ref. #27-030

With GovernmentContracts, you can:
...Bid Number: RFP PW 27-03 Bid Title: Custodial Cleaning Services (RFP PW 27-03) ...
Norcross city
Bid Due: 11/20/2026
...Custodial Cleaning Services (RFP PW 27-03) Norcross, City Of Oct 13, 2026 @ ...
State Government of Georgia
Bid Due: 11/20/2026
...BL003-27 INV Provision of Cleaning and Testing Services for the Firing Range Complex ...
Gwinnett County
Bid Due: 11/23/2026
...Pre-Advertisement Notice for Grease Interceptor Maintenance, & Cleaning Inspection Services... for Grease Interceptor ...
State Government of Georgia
Bid Due: 11/19/2026