RFQ 484-110926 CEI Services for US 278 Grade Separation over CSX Railroad

Location: Georgia
Posted: Oct 8, 2026
Due: Nov 9, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: PE-48401-RFQ-2027-000000630
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-48401-RFQ-2027-000000630 RFQ 484-110926 CEI Services for US 278 Grade Separation over CSX Railroad Transportation-2, Department Of
Oct 08, 2026 @ 08:39 AM
Nov 09, 2026 @ 02:00 PM
RFQ 484-110926 CEI Services for US 278 Grade Separation over CSX Railroad

Start Date: Oct 08, 2026 @ 08:39 AM ET

End Date:
Nov 09, 2026 @ 02:00 PM ET

Event ID: PE-48401-RFQ-2027-000000630
Event Type: Request for Quote
Event Status: Open
Purchase Type: Open Market
Category Type: Services / Special Projects
Government Type: state
Fiscal Year: 2027


Description


Construction Engineering Inspection (CEI) Services for US 278 Grade Separation over CSX Railroad

NIGP Codes
Code Description
84571 Civil Engineering & Materials Testing Equipment
91842 Engineering Consulting (Inactive, please see commodity code 907-40 effective January 1, 2016)
93831 Engineering and Surveying Equipment, Drawing Instruments, etc., Including Photogrammetry Equipment M
91117 C.I.P., Construction, Roads
91275 Quality Control Testing Services for Construction
91831 Construction Consulting
15010 Construction Materials (Not Otherwise Classified)
90638 General Construction, Architectural Services
91313 Construction, Bridge and Drawbridge, Including Reconstruction and Rehabilitation
91327 Construction, Highway and Road
90740 Engineering Services, Non-Licensed (Not Otherwise Classified), Including Consulting
92588 Structural Engineering
92592 Value Engineering and Value Analysis, Professional
92595 Utilities, Gas, Steam, Electric Engineering
92555 Inspecting, General Engineering
92538 Field Engineering
92545 Geological Engineering
92546 Geotechnical Engineering
92513 Bridge Engineering
92517 Civil Engineering
92544 General Construction: Management, Scheduling, Cost Estimation Engineering
92549 Highways, Streets, Airport Pay-Parking Lots Engineering
92535 Environmental Engineering
95826 Construction Management Services
BuyerContact:

Temekia Arnold
tearnold@dot.ga.gov

404-631-1428

Attachment Preview

Date Posted: October 8, 2026
Office of Engineering Design Procurement
One Georgia Center
600 West Peachtree Street NW
Atlanta Georgia 30308
REQUEST FOR QUALIFICATIONS
Construction Engineering Inspection (CEI) Services for US 278 Grade Separation over CSX Railroad
RFQ 484-110926
Statement of Qualifications Due: November 9, 2026
1

Date Posted: October 8, 2026
REQUEST FOR QUALIFICATIONS
I. General Project Information
A. Overview
The Georgia Department of Transportation (GDOT) is soliciting Statements of Qualifications
(SOQs) from qualified firms to provide consultant services for the project or contract
identified in the applicable Exhibit below.
GDOT reserves the right to reject any or all Statements of Qualifications and Technical
Approaches and to waive technicalities and informalities at GDOT's discretion.
B. Restriction of Communications
From the date of advertisement of this solicitation until the successful firm is selected and
the award is officially announced, each firm is strictly prohibited from communicating in any
way regarding this solicitation or the associated scope of work with any GDOT staff,
including the Commissioner and GDOT Board Members. This restriction applies to all
potential firms and will be strictly enforced.
The only exception to this restriction is for the purpose of obtaining a Consultant Evaluation
Form to support a project being included in the SOQ submittal.
All questions or requests for clarification regarding any aspect of this RFQ must be submitted
in writing via email to:
Kamilah White
Kawhite@dot.ga.gov
Deadlines for the submission of questions are listed in the Schedule of Events section of this
RFQ.
Method of Communication
All general communication regarding this solicitation, including updates, clarifications, and
official announcements, will be posted to the Georgia Procurement Registry (GPR) under
this RFQ. It is the responsibility of all interested firms to monitor the GPR regularly for such
information.
GDOT reserves the right to communicate directly via email with the primary contact listed in
the submitted Statement of Qualifications (SOQ). Additional communications may be
conducted as specified elsewhere in this RFQ.
C. Contract Term and Type
GDOT anticipates awarding one (1) Multi-Phase, Project-Specific contract to one (1) firm
for each contract identified in the applicable Exhibits. The payment type through individual
task orders may be Lump Sum, Cost Plus Fixed Fee, Cost per Unit of Work, or Specific
Rate of Compensation.
2

PHASE I DATE TIME
a. GDOT issues a public advertisement for this RFQ. 10/08/2026 --------
b. Deadline for submission of written questions and requests for clarification 10/26/2026 2:00 PM
c. Deadline for submission of SOQs 11/09/2026 2:00 PM

Date Posted: October 8, 2026
D. Contract Amount
For each Multi-Phase, Project-Specific contract, a maximum allowable compensation
amount will be established to serve as a ceiling for the total contract value. This ceiling may
not be exceeded unless formally adjusted through a contract modification. Under the Multi-
Phase, Project-Specific contract structure, the solicited scope of services will be negotiated
and authorized individually through task orders. The specific scope of work and associated
costs will be determined by the contract progress.
E. Scope of Services
Under the resulting Agreement, the selected firm will provide the scope of services identified
in the applicable Exhibit through individual task orders issued during the contract term.
F. Schedule of Events
The schedule below represents GDOT's estimated schedule. All times indicated are Eastern
Time. GDOT reserves the right to adjust the schedule as GDOT deems necessary.
PHASE I DATE TIME
a. GDOT issues a public advertisement for this RFQ. 10/08/2026 --------
b. Deadline for submission of written questions and requests for 10/26/2026 2:00 PM
clarification
c. Deadline for submission of SOQs 11/09/2026 2:00 PM
G. Area Class Prequalification
The proposed Consultant Team must collectively hold each Area Class required by Section
4 of the applicable Exhibit or have submitted an application for a new Area Class or renewal
to GDOT before the SOQ deadline. A firm with a timely pending application or renewal
remains eligible for evaluation. Failure to satisfy an Area Class requirement may result in
disqualification.
The Area Class Summary Table identifies the team member whose prequalification is used
to demonstrate each required Area Class. It does not limit the services a team member may
perform. Any member of the proposed Consultant Team may perform services in an Area
Class for which it holds the applicable GDOT prequalification, whether or not that firm is
marked with an X for that Area Class.
Each firm is responsible for maintaining its applicable GDOT Area Class prequalifications in
accordance with the GDOT Prequalification Manual throughout the procurement process
and the term of any resulting contract.
GDOT will verify the proposed Consultant Team's Area Class prequalifications during
prescreening, before finalizing the shortlist, and again before contract award. If a firm
3

Date Posted: October 8, 2026
marked with an X in the Area Class Summary Table no longer holds the required
prequalification, GDOT will consider whether another firm already listed on the proposed
Consultant Team holds that Area Class. A proposed Consultant Team that does not
collectively satisfy all required Area Classes at the time of shortlisting will not be shortlisted.
If the highest-ranked firm's proposed Consultant Team does not collectively satisfy all
required Area Classes at the time of award, GDOT will award the applicable contract to the
next highest-ranked firm whose proposed Consultant Team satisfies the requirements.
II. Selection Method
Following the responsiveness review and prescreening of the Statements of Qualifications,
GDOT will determine whether to conduct separate Phase I and Phase II evaluations or a
combined Phase I and Phase II evaluation. This determination will be based on the number of
responsive SOQs received and the efficient administration of the selection process. The
evaluation process selected by GDOT will not alter the evaluation criteria or weights identified
in this solicitation.
A. Separate Phase I and Phase II Evaluation
When GDOT determines that separate Phase I and Phase II evaluations are appropriate,
individual Selection Committee members will review each responsive firm's SOQ using the
Phase I selection criteria and weights identified in this solicitation before the Phase I group
evaluation meeting. When a competitive range is needed, individual committee members
will rank the firms, and the sum of their rankings will determine the competitive range. When
GDOT determines that all responsive firms will be discussed and evaluated by the Selection
Committee as a group, individual committee members will review each firm's SOQ before
the group meeting, but will not rank firms to establish a competitive range.
During the Phase I group evaluation meeting, the Selection Committee will discuss and
evaluate all responsive firms or the firms within the competitive range, as applicable, and
assign a group rating for each Phase I evaluation criterion, resulting in a Phase I group score
and final ranking of the top submittals. Based on the group scores, the most highly qualified
firms will be shortlisted to participate in Phase II.
Each shortlisted firm will be notified by email to participate in Phase II of the evaluation
process. The notification will include all due dates, additional details, and requirements
beyond those provided in the solicitation.
Before the Phase II group evaluation meeting, individual Selection Committee members will
review each shortlisted firm's Technical Approach without assigning individual rankings.
During the meeting, the Selection Committee will discuss and evaluate all shortlisted firms
as a group using the Phase II selection criterion and weight identified in this solicitation and
assign a group rating resulting in a Phase II group score.
B. Combined Phase I and Phase II Evaluation
When GDOT determines that a combined Phase I and Phase II evaluation is appropriate,
all responsive firms will be shortlisted to participate in Phase II. Each shortlisted firm will be
notified by email to participate in Phase II of the evaluation process. The notification will
include all due dates, additional details, and requirements beyond those provided in the
solicitation. Before the combined evaluation meeting, the individual Selection Committee
members will separately evaluate each firm's Phase I SOQ and Phase II Technical
Approach using the respective selection criteria and weights identified in this solicitation.
4

Date Posted: October 8, 2026
During the combined evaluation meeting, the Selection Committee will first discuss and
evaluate each firm's Phase I SOQ as a group and assign a group rating for each Phase I
evaluation criterion, resulting in a Phase I group score. The Selection Committee will then
separately discuss and evaluate each firm's Phase II Technical Approach as a group and
assign a group rating for the Phase II evaluation criterion, resulting in a Phase II group score.
C. Final Selection
Upon completion of the applicable evaluation process, the Phase I and Phase II group
scores for each firm will be added together to determine a total score, and the firms will be
ranked in order of preference.
GDOT will initiate negotiations with the top-ranked firm to finalize the scope, compensation,
fees, and other terms and conditions of the contract. If a satisfactory agreement cannot be
reached, GDOT will formally terminate negotiations with that firm and may initiate
negotiations with the next highest-ranked firm. GDOT may continue this process in order of
ranking until a satisfactory agreement is reached and a contract is executed.
III. Selection Criteria and Weights
The Selection Committee will evaluate the Phase I Statements of Qualifications and Phase II
Technical Approaches using the criteria and weights identified below. Phase I accounts for 60
percent of the total evaluation score, and Phase II accounts for 40 percent.
A. Phase I Selection Criteria
The following criteria and weights will be used to evaluate and score the Phase I Statements
of Qualifications:
1. Consultant Project Manager, Key Team Leaders, and Key Team Member - Experience and
Qualifications: 30%
Evaluation will be based on the relevant experience, professional qualifications, and
technical expertise of the proposed Consultant Project Manager, Key Team Leaders, and
Key Team Member in relation to the scope of services identified in the applicable Exhibit.
2. Additional Resources and Challenges: 20%
Evaluation will be based on the firm's additional resources and its approach to addressing
challenges associated with the scope of services.
3. Prime Consultant Past Performance: 10%
Evaluation will be based on the Prime Consultant's experience performing similar or
related services and its past performance. Past performance will be assessed using the
evaluation forms submitted with the SOQ and any relevant experience or project
knowledge held by members of the Selection Committee.
B. Phase II Selection Criterion
The following criterion and weight will be used to evaluate and score the Phase II
Technical Approaches:
Technical Approach: 40%
This criterion evaluates the firm's proposed approach to contract and task-order
management, Subconsultant management and coordination, workload and staffing
management, anticipated challenges and risks, quality management, corrective action
5

Date Posted: October 8, 2026
and recovery, and the application of experience and added value to the delivery of the
applicable scope of services.
C. Presentation/Interview
GDOT reserves the right to request a presentation or interview when determined to be in
GDOT's best interest. If requested, the presentation or interview will be evaluated as part
of the Technical Approach.
IV. Instructions for Content and Preparation of the Phase I Statement of
Qualifications
The Phase I Statement of Qualifications must be prepared in accordance with the instructions
provided in this section. The SOQ must respond to all requested information and be organized
using the required headings, numbering, and lettering shown in red.
The Phase I SOQ must be prepared as one complete PDF document in portrait orientation on
8.5-by-11-inch paper, except that the Organizational Chart and Area Class Summary Table
may be submitted in portrait or landscape orientation on 8.5-by-11-inch or 11-by-17-inch
paper. Use a minimum 11-point font. Number all pages and comply with the page limits stated
for each section. Hyperlinks and embedded videos must not be included.
The firm must provide only the information requested. Additional pages and unsolicited
information must not be included.
Standalone divider, separator, and section-identification pages must not be included. Each
section with a stated page limit must begin on a new page and must not exceed the applicable
limit.
A. Phase I Cover Page
The Phase I SOQ must include a cover page identifying the following information:
1. RFQ Number: Provide the RFQ number.
2. RFQ Title: Provide the RFQ title.
3. Firm Name: Provide the firm's full legal name.
4. Project or Contract Information: Identify the applicable project or contract, including
the Project Number, if applicable.
5. District, Region, and County Information: Provide the applicable district or region and
county or counties.
6. Description: Provide the applicable project or contract description.
Page Limit: The Phase I Cover Page is excluded from the page count.
B. Administrative Requirements
Restrictions on Inclusion of GDOT Employees and Personnel Disclosure
A current GDOT employee must not be included as a member of the proposed consultant
team. Inclusion of a current GDOT employee on the proposed team will make the SOQ
nonresponsive.
6

Date Posted: October 8, 2026
Firms may identify current GDOT employees as project managers or contacts for previous
projects or contracts, or as references or evaluators of the firm's past performance. Such
a reference must not imply that the individual is part of the proposed consultant team.
The firm must ensure that every individual identified as a proposed team member has been
informed of and agreed to the proposed role. The firm must not identify an employee of
another firm, including a proposed subconsultant, without the individual's knowledge and
the concurrence of the individual's current employer. The current employer of every
proposed individual must be clearly identified.
1. Addendum or Addenda
For each Addendum issued for this RFQ, the firm must include only the signed
Addendum cover page. The remaining pages of the Addendum must not be included. If
no Addendum was issued, the firm must state "No Addendum Issued."
Page Limit: Signed Addendum cover pages are excluded from the page count.
2. Basic Company Information
a. Company Name: Provide the full legal name of the company.
b. Company Headquarters Address: Provide the complete address of the company
headquarters.
c. Primary Contact Information: Provide the name, telephone number, and email
address of the individual who will serve as the primary contact for this solicitation.
d. Georgia Office Locations: Identify each office located in Georgia and provide its
complete address. If the firm has no Georgia office, state "No Georgia Office."
e. Staffing in Georgia Offices: Provide the number of employees and the disciplines
represented at each Georgia office.
f. Ownership Structure: Identify the form of ownership, state of residency or
incorporation, and number of years the firm has been in business.
g. Proposed Consultant Team List: Provide a complete list of the firms included in the
proposed consultant team. List the Prime Consultant first, followed by each proposed
Subconsultant, using each firm's full legal name and GDOT prequalification expiration
date. If a firm does not yet have an expiration date because its initial prequalification
application is pending, enter "Pending." Only firms included in the Proposed
Consultant Team List will be included in the resulting contract.
The Prime Consultant is the firm submitting the Statement of Qualifications and the
firm that will contract directly with GDOT.
Subconsultants are generally considered team members performing services that
typically require prequalification, are subject to the Audit and Accounting System
Requirements, and whose services are billed as costs. Subconsultant team members
must be included in the resulting agreement and are subject to its terms and
conditions.
7

Firm's Full Legal Name GDOT Prequalification Expiration Date
Prime Consultant: [Insert Full Legal Name] [MM/DD/YYYY]
Subconsultant: [Insert Full Legal Name] [MM/DD/YYYY or Pending]
Subconsultant: [Insert Full Legal Name] [MM/DD/YYYY or Pending]

Date Posted: October 8, 2026
Vendors are generally considered firms performing services that typically do not
require prequalification, are not subject to the Audit and Accounting System
Requirements, and whose services are billed as direct expenses. Vendors must not
be included in the Proposed Consultant Team List. Vendors will not be included in
the resulting agreement and will not be subject to its terms and conditions.
Firm's Full Legal Name GDOT Prequalification Expiration Date
Prime Consultant: [Insert Full Legal Name] [MM/DD/YYYY]
Subconsultant: [Insert Full Legal Name] [MM/DD/YYYY or Pending]
Subconsultant: [Insert Full Legal Name] [MM/DD/YYYY or Pending]
The firm must provide only the information requested in this subsection. Additional or
unsolicited information must not be included and will not be considered.
Page Limit: Basic Company Information, including the Proposed Consultant Team List,
is excluded from the page count.
C. Experience and Qualifications
The firm must provide the information requested below for the proposed Consultant
Project Manager, each required Key Team Leader, and the proposed Key Team Member.
The Consultant Project Manager and each Key Team Leader must be labeled exactly as
the positions appear in Section 6 of the applicable Exhibit.
The same individual may be proposed as both the Consultant Project Manager and a Key
Team Leader. The firm must provide the requested information separately for each
position. Within the Consultant Project Manager's page limit, the firm must explain how
the individual will perform both roles while maintaining sufficient availability and capacity.
The firm must not leave any requested personnel-information item blank. If an item does
not apply to the proposed individual, the firm must state "Not Applicable" or "N/A."
1. Consultant Project Manager
The following information must be provided for the proposed Consultant Project
Manager:
a. Current Employment: Identify the firm where the Consultant Project Manager is
currently employed and the number of years the individual has been employed by
that firm.
b. Project Management Experience: Provide the total number of years the individual
has served as a Project Manager.
c. Education: Identify the individual's relevant degrees or academic credentials.
d. Professional Registration: Identify any relevant professional licenses or
registrations.
e. Relevant Construction Engineering or Inspection Experience: Describe the
individual's construction engineering or inspection experience supporting highway
and bridge construction projects, including concurrent projects, relevant to the scope
of services identified in the applicable Exhibit.
f. Relevant Project Management Experience: Describe the individual's experience
managing construction engineering and inspection services, including coordinating
8

Date Posted: October 8, 2026
staff and making day-to-day workflow decisions for projects of similar complexity,
size, scope, and function.
g. Relevant Training: Identify the individual's relevant construction engineering
and inspection training.
h. GDOT-Specific Experience: Describe the individual's experience applying
GDOT-specific procedures, policies, manuals, standards, and guidance relevant
to construction engineering and inspection services, including the Standard
Specifications, Construction Manual, Bridges Manual, and Environmental
Procedures Manual. For projects that did not follow GDOT requirements, identify
the alternative processes, manuals, standards, or guidance used and explain
their comparability.
Page Limit: Two (2) pages maximum.
2. Key Team Leaders
Key Team Leaders are individuals responsible for leading or overseeing scope areas
considered critical to the applicable scope of services. The firm must provide the
required information for each Key Team Leader identified in Section 6 of the applicable
Exhibit.
The following information must be provided for each required Key Team Leader:
a. Current Employment: Identify the firm where the Key Team Leader is currently
employed and the number of years the individual has been employed by that firm.
b. Professional and Leadership Experience: Provide the individual's total years of
relevant professional experience in the applicable discipline, including the number
of years the individual has been responsible for leading or overseeing work within
that discipline.
c. Education: Identify the individual's relevant degrees or academic credentials.
d. Professional Registration: Identify any relevant professional licenses or
registrations.
e. Relevant Resource Area Experience: Describe the individual's relevant
experience in the applicable resource area on highway and bridge construction
projects. Include construction engineering and inspection, traffic control, or
erosion control experience, as applicable to the proposed role, and identify
experience with GDOT or other State Highway Agencies.
f. Relevant Training: Identify the individual's relevant construction engineering
and inspection training.
g. GDOT-Specific Experience: Describe the individual's experience applying
GDOT-specific procedures, policies, manuals, standards, and guidance relevant
to the Key Team Leader's resource area, including the Standard Specifications,
Construction Manual, Bridges Manual, and Environmental Procedures Manual.
For projects that did not follow GDOT requirements, identify the alternative
processes, manuals, standards, or guidance used and explain their
comparability.
The firm must identify a Key Team Leader for each position specified in Section 6
of the applicable Exhibit. Failure to identify a required Key Team Leader will make
the SOQ nonresponsive. The firm must not include additional Key Team Leaders.
9

Date Posted: October 8, 2026
Page Limit: One (1) page maximum for each required Key Team Leader.
3. Key Team Member
A Key Team Member is an individual, other than the Consultant Project Manager or a
Key Team Leader, whose qualifications and proposed role are considered important to
the delivery of the scope of services identified in the applicable Exhibit.
a. Current Employment: Identify the individual's current employer and number of
years employed by that firm.
b. Professional Experience: Provide the individual's total years of relevant
professional experience in the applicable discipline.
c. Education: Identify the individual's relevant degrees or academic credentials.
d. Professional Registration: Identify any relevant professional licenses or
registrations.
e. Relevant Technical Experience: Describe the individual's relevant technical
experience on projects of comparable complexity, size, scope, and function.
f. Proposed Role: Describe the individual's proposed role and contribution to the
successful delivery of the applicable scope of services.
g. GDOT-Specific Experience: Describe the individual's experience using GDOT-
specific processes, manuals, standards, and guidance relevant to the proposed
role. For projects that did not follow GDOT processes, identify the alternative
processes, manuals, standards, or guidance used and explain their comparability.
Page Limit: One (1) page maximum.
4. Key Personnel Changes
No response is required under this subsection in the Phase I SOQ.
If, after submission, a Consultant Project Manager, Key Team Leader, or Key Team
Member identified in the Phase I SOQ is no longer employed by the firm, the shortlisted
firm must identify a replacement in the Phase II Technical Approach. The replacement
must be employed by the same firm as the individual being replaced.
The firm must provide all information required for the applicable position and comply
with the original page limitation. During the Phase II Technical Approach evaluation
meeting, GDOT will revisit and adjust the applicable Phase I score to reflect the
experience and qualifications of the replacement personnel. If no key personnel
changes have occurred, the firm must state "No Changes" in the Phase II Technical
Approach.
D. Additional Resources and Challenges
1. Overall Resources
Provide information regarding the overall resources available to deliver the applicable
scope of services, including:
10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract

DEPT OF DEFENSE

Bid Due: 11/18/2026

Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 11/25/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006

State Government of Georgia

Bid Due: 11/23/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047

State Government of Georgia

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.