| Location: | Georgia |
|---|---|
| Posted: | Oct 8, 2026 |
| Due: | Nov 13, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66087-NONST-2027-000000017 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66087-NONST-2027-000000017 | Request for Proposals New Fire Station Contractor | Madison, City Of |
Oct 08, 2026 @ 08:13 AM
|
Nov 13, 2026 @ 04:00 PM
|
Start Date: Oct 08, 2026 @ 08:13 AM ET
End Date:
Nov 13, 2026 @ 04:00 PM ET
The City of Madison is seeking qualified general contracting firms to provide complete construction management and general contracting services for the construction of New Fire Station #22. The selected contractor will be responsible for all construction methods, job-site safety programs, scheduling (CPM), quality control, subcontractor prequalification, cost accounting, permitting coordination, as-built documentation, and full closeout/commissioning. The scope also includes a mandatory one-year warranty period with punch-list administration and a year-end warranty inspection.
| Code | Description |
| 90924 | Building Construction, Commercial and Institutional |
| 90922 | Building Construction, Non-Residential, Office Bldg., etc. |
| 90921 | Building Construction, Industrial, Warehouse, etc. |
| 95826 | Construction Management Services |
Laurinda Mason
lmason@madisonga.com
706-752-5596
| Schedule of Events | |
|---|---|
| RFP Release Date | 10-08-2026 |
| Mandatory Pre-bid Meeting | 10-22-2026 1pm |
| Deadline for Questions | 10-29-2026 5pm |
| Answers will be posted as Addendum | 11-06-2026 4pm |
| Deadline for Submittals | 11-13-2026 5pm |
| Evaluations | 11-16-2026 |
| Interviews | 11-20-2026 (time tbd) |
RFP No. 2027-3500-01
Project Location: City of Madison
Description of Project: New Fire Station #22
Primary Contact: Laurinda Mason, Procurement Agent
Phone: 706-752-5596
Address: 132 N Main St
Madison, GA 30650
Email: lmason@madisonga.com
Project Documents: The Construction Documents (CDs) and Project Manual (prepared by 2WR
of Georgia, Project #25-02527) are issued as separate attachments [A & B] to this RFP, as well as all
addendums, schedule changes, and other important updates related to this solicitation will be
posted on the State of Georgia Procurement Registry and the City of Madison's procurement
website: https://madisonga.com/1049/ProposalsRFPSolicitations.
Questions and proposals must be submitted electronically at
https://www.myvendorlink.com/
Mandatory Pre-Bid Meeting
A mandatory pre-bid meeting will be held on 10/22/2026 at 1:00PM at 1100 Mary Magnan Blvd,
Madison, GA 30650. Attendance by a representative of each prospective bidder is required. Only
firms represented at the meeting will be eligible to submit a proposal. It is the responsibility of
each proposer to sign the attendance sheet. Failure to attend will result in the proposal being
deemed non-responsive.
The City of Madison gives public notice that it is the policy of the City to ensure full
compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act
of 1987, and related statutes and regulations in all programs and activities. It is our
policy that no person in the United States of America shall, on the grounds of race,
color, national origin, sex, age or disability be excluded from the participation in, be
denied the benefits of, or be otherwise subjected to discrimination under any of our
programs or activities.
Schedule of Events
RFP Release Date 10-08-2026
Mandatory Pre-bid Meeting 10-22-2026 1pm
Deadline for Questions 10-29-2026 5pm
Answers will be posted as Addendum 11-06-2026 4pm
Deadline for Submittals 11-13-2026 5pm
Evaluations 11-16-2026
Interviews 11-20-2026 (time tbd)
Section I - Introduction and Project Overview
1. Purpose, Intent, and Project Description
The City of Madison ("City") is accepting Proposals for the construction of a fire station
(#22) at 1100 Mary Magnan Boulevard, Madison, Georgia 30650. The work under this contract
includes the complete construction of a new facility, including all building components, site work,
finishes, and all related elements required for a fully functional fire station.
The proposed project is a Fire Station with four drive through bays, administrative offices,
firefighter dorm rooms and living quarters, etc. The building structure is a pre-engineered metal
building clad with brick and block interior and prefinished metal wall panels on the exterior with
a standing seam metal roof, slab on grade. The adjacent portion of the building is a slab on grade
wood construction with wood trusses and brick and cementitious siding exterior with aluminum
windows. Area is approximately 11,000 square feet.
All work shall be coordinated with the City of Madison, and subject to City approval.
2. General Conditions
The contractor will be responsible for providing all labor, materials, equipment, and
incidentals necessary to complete the work described in the project documents. The project
will be delivered under a lump sum contract; however, the City reserves the right to consider
if proposals demonstrate enhanced value, constructability, or lifecycle benefits, provided the
base scope requirements are met.
The building's exterior facade, signage, and site design must comply with all applicable City of
Madison Code of Ordinances and local architectural/overlay district standards. The Contractor
shall ensure all proposed exterior finishes, materials, and colors adhere to municipal guidelines
prior to final submittal for building permit approval.
Proposers are responsible for conducting their own site inspection prior to submitting a
Proposal. Change orders must be reviewed and approved by the City Manager prior to any work
being performed from change order.
Unless otherwise specified by written addendum, the project shall be completed in strict
compliance with the Construction Bid Documents (Attachment A), the Project Manual and
Technical Specifications (Attachment B), and all other solicitation documents, appendices, and
addenda.
The Lump Sum Proposal shall be all-inclusive and shall cover:
* All labor
* Materials & Tools
* Equipment, including Specialty Equipment such as:
o Fire Suppression & Protection: Full fire sprinkler coverage throughout the facility and an
integrated commercial hood fire suppression system over all kitchen/cooking appliances
in accordance with local and state codes.
o Low-Voltage & Communications: Dedicated conduit, cabling stubs, and infrastructure to
support dispatch, security systems, fire alarms, and high-speed fiber optic data
connections. Final connection coordination shall be managed with the City's designated
IT and Fire Department representatives.
* Transportation
* Permits
* Incidentals required to construct the new fire station, including all:
o On-site utility installations and water/sewer lines stubbed out to the Right
of Way (ROW) for future connection. While the installation of gas service-
including all associated piping, trenching, and utility fees-is expressly
excluded from this scope of work, the Contractor shall be responsible for all
costs associated with the construction staging area, the provision and
servicing of dumpsters/waste removal, and the provision and maintenance
of portable restrooms. Because the City will not provide these facilities or
services, no additional compensation will be granted for these items.
A 10% retainage shall be withheld in accordance with applicable Georgia law. The City will
inspect work as it progresses.
3. Funding
This project is locally funded by SPLOST proceeds. Construction is expected to be complete
within fourteen (14) months after notice to proceed.
Section II - Scope of Work
During the construction, the Contractor will be responsible for methods of construction, safety
programs, general conditions, prequalification of potential subcontractors and proposing of all work,
certification of work in place and monthly payment requests, coordination and scheduling of all
construction contracts and miscellaneous contracts required for the completion of the project within
the predetermined budget and schedule.
2.1 Minimum Requirement
Proposer shall have five (5) years of experience in similar size and scope as specified by this RFP, the
Construction Documents (Attachment A), and the Project Manual / Specifications (Attachment B).
Please be sure to include the necessary references to support this requirement in Appendix C -
Reference Form. Failure to meet minimum requirements or correctly complete Reference Form may
result in proposal being rejected.
The following list of services will be provided during:
A. Construction Phase
a) Maintain on-site staff for construction management of the project while work is
ongoing.
b) Establish and maintain coordinating procedures.
c) Develop and maintain a detailed schedule (CPM) including delivery,
approvals, inspection, testing, construction and occupancy.
d) Attend job meetings, coordinate sub-contractor attendance as required and
provide updated schedule/progress and pricing/cost information.
e) Prepare and submit change order documentation for approval of the Architect
and the Owner.
f) Maintain a system for review and approval of shop drawings.
g) Maintain records and submit formal monthly reports to Architect and Owner.
h) Maintain quality control and ensure conformity with plans.
i) Provide cost control through progress payment review and verifications
according to the approved schedule and contract amounts.
j) Develop as-built drawings.
k) Coordinate post-completion activities, including the assembly of guarantees,
manuals, closeout documents, training, and the Owners final acceptance.
B. Warranty Phase
a) Coordinate and monitor the resolution of remaining "punch-list" items.
b) Coordinate, monitor and resolve all warranty complaints to the satisfaction of
the Owner during the one-year general warranty period.
c) Provide year-end inspection.
2.2 Prosecution and Progress
The baseline project schedule requires Substantial Completion within fourteen (14)
months following the issuance of the official Notice to Proceed (NTP). The obtaining of
necessary municipal building permits shall be prioritized upon contract execution. Time
spent in standard permit review shall be accounted for within the master construction
schedule, and any delays associated with permitting must be communicated to the City
immediately.
Once construction begins, the contractor shall work diligently and continuously to
minimize disruptions to nearby residential areas. Delay in project completion affects the
City's operational planning; therefore, time is of the essence.
The Contractor shall perform cleanup and restoration activities daily. If the contractor fails
to maintain the site in a clean and orderly condition, the City may direct work to stop until
acceptable cleanup is completed. Continued failure to perform cleanup may result in
suspension of work.
The City will not provide a roll-off container or portable potties.
2.3 Compliance and Safety
From mobilization through final acceptance, the contractor is responsible for always
maintaining a safe work environment. Beyond standard OSHA and ADA regulations, all
constructed spaces and mechanical systems must comply with applicable NFPA standards
concerning firefighter health, safety, and carcinogen control. Design and construction
considerations must incorporate proper zone separation between living quarters and apparatus
bays, proper ventilation/exhaust extraction routing, and dedicated areas for turnout gear
storage and decontamination.
All work shall comply with the Americans with Disabilities Act (ADA), as amended, and all
applicable federal and state accessibility requirements, including the 2010 ADA Standards for
Accessible Design. The Contractor shall be responsible for ensuring that all constructed
elements meet required accessibility standards.
2.4 Bonding and Insurance Requirements
Bonds must be provided within 7 calendar days of Notice to Award. The contractor shall procure
and maintain the following bonds:
1. Whenever a bond is provided, it shall be executed by a Surety licensed to write surety
insurance in the State of Georgia and the attached Bond Forms shall be utilized.
2. The successful Proposer shall give a Contract Proposal Bond, Performance Bond and a Payment
Bond,
post a Proposal Bond of five percent (5%) of the proposal price, a Payment Bond of one
hundred percent
(100%) of the proposal price and a Performance Bond of one hundred percent (100%) of the
proposal price, for the use of all persons doing work or furnishing skills, tools, machinery, or
materials under or for the purpose of the resulting Contract, in accordance with the applicable
provisions of Georgia state law, including but not limited to, O.C.G.A. 13-10-1 and 36-91-21
et seq. The life of these bonds shall extend through the life of the Contract including a sixty (60)
day maintenance period (where applicable) and a twelve-month (12) guarantee period after
the completion of Work performed under the resulting Contract.
3. It is further agreed between the parties hereto that if at any time after the execution of the
Contract and the surety bonds, the City shall deem the surety or sureties upon such bonds to be
unsatisfactory, or if, for any reason, such bonds cease to be adequate to cover the performance
of the Work, the Contractor shall, at its sole expense and within seven (7) calendar days
after the receipt of notice from the City to do so, furnish additional bond or bonds in such form
and amount and with such surety or sureties as shall be satisfactory to the City.
2.5 Insurance Requirements
A certificate of insurance must be provided within 7 calendar days of Notice to Award. The
contractor shall procure and maintain the following insurance coverage for the duration of the contract:
* Commercial General Liability Insurance with limits of not less than
$1,000,000 combined single limits per occurrence for bodily injury and/or
property damage. The policy shall name the City of Madison as an additional
insured.
* Statutory Workers' Compensation and Employers' Liability Insurance with
limits of not less than $1,000,000, including a waiver of subrogation in favor of the
City of Madison and its affiliates.
* Commercial Automobile Liability Insurance with limits of not less than
$1,000,000 combined single limits per occurrence for bodily injury and/or
property damage. The policy shall name the City of Madison as an additional
insured.
Certificate Holder:
City of Madison
PO Box 32
Madison, GA 30650
Additional Insurance Requirements:
1. Primary & Non-Contributory: Require that the Contractor's General Liability and Auto policies
act as primary coverage over any insurance maintained by the City of Madison.
2. Notice of Cancellation: Add an express requirement that insurers provide 30 days' advance
written notice of cancellation (or 10 days for non-payment of premium).
3. Comprehensive Waiver of Subrogation: Expand the subrogation waiver beyond Workers'
Compensation to include Commercial General Liability and Auto Liability in favor of the City of
Madison, its elected officials, officers, and employees.
4. Certificate Tracking Details: Mandate that Certificates of Insurance (COIs) explicitly reference
RFP #2027-3500-01 / New Fire Station #22.
Builder's Risk Insurance: Contractor shall provide a Builder's Risk Insurance Policy to be made payable to
the City and Contractor, as their interests may appear. The policy amount shall be equal to 100% of the
Maximum Contract Price, written on a Builder's Risk "All Risk," or its equivalent. The policy shall provide, or
be endorsed to provide, as follows: "The following may occur without diminishing, changing, altering
or otherwise affecting the coverage and protection afforded the insured under this policy:
1) Equipment may be delivered to the insured premises and installed in place ready for use; and
2) Partial or complete occupancy by City ; and
3) Performance of Work in connection with construction operations insured by the City, by its agents or
lessees, or other contractors of the City or using agency." The insurance coverage shall include extended
coverage, and providing coverage for transit, with sublimit sufficient to ensure the full replacement value of
the property or equipment removed from its site and while located away from its site until the date of final
acceptance of the Work.
Minimum Financial Security Requirements
All companies providing insurance required by this RFP must meet certain minimum financial security
requirements. These requirements must conform to the ratings published by A.M. Best & Co. in the
current Best's Key Rating Guide - Property-Casualty. The ratings for each company must be indicated
on the documentation provided by Contractor/Consultant to City certifying that all insurance
requirements set forth in this RFP and applicable to the Contract have been unconditionally satisfied.
For all contracts, regardless of size, companies providing insurance or bonds under the contract must
meet the following requirements:
1. Best's Rating not less than A-VII,
2. Best's Financial Size Category not less than Class VII, and
3. Companies must be authorized to conduct and transact insurance contracts by the Insurance
Commissioner, State of Georgia.
4. All proposal, performance and payment bonds must be underwritten by a U.S. Treasury Circular 570
listed company.
If the issuing company does not meet these minimum requirements, or for any other reason is or
becomes unsatisfactory to City, City will notify Contractor/Consultant in writing. Contractor/Consultant
must promptly obtain a new policy or bond issued by an insurer acceptable to City and submit to City
evidence of its compliance with these conditions.
2.6 Subcontracting
The contractor shall not subcontract the entire scope of work or substitute key
subcontractors identified in Proposal without prior written approval from the City. Any
contractor proposing to use subcontractors must submit a list of all intended subcontractors
(form provided).
Upon award of the contract, the contractor shall provide a Notarized Subcontractor Affidavit
(form provided) for each approved subcontractor.
Failure of the Proposer to provide information concerning the responsibility of any Sub-
Consultant or Subcontractor may result in a finding that the Proposer is not responsible.
2.6.1 All proposed Sub-Consultants and Subcontractors must be listed in the
Proposer's response. Proposer shall ensure that all proposed Subcontractors
have adequate personnel, past experience, adequate facilities, finances, and
business systems to perform the scope of services. The City reserves the right to
approve all Subcontractors and Sub-Consultants for this RFP.
2.6.2 Proposer must have the responsibility of verifying the existence, authenticity,
and dates of expiration of all licenses required by all Sub-Consultants and
Subcontractors engaged in the work of this RFP. The lack of a valid license from
the Proposer or any Sub-Consultant or Subcontractor shall be grounds for
default, and for immediate termination for cause with prejudice as it relates to
the Proposer, and the removal of any unlicensed entity from the project. In the
event Proposer, a Sub-Consultant or Subcontractor is required to be licensed or
certified as a condition precedent to providing goods or services under this
RFP, the revocation or loss of such license or certification may result in
immediate termination of the Proposer's Contract effective as of the date on
which the license or certification is no longer in effect.
2.6.3 All Sub-Consultants and Subcontractors must be approved by the City prior to
performing. Consultant must receive written permission to add sub-consultants
or Subcontractors not initially submitted with Proposer's response. Sub-
Consultants and Subcontractors shall not sub-contract any portion of their
work pursuant this RFP without the written consent of the City. Failure of the
Proposer to obtain from the City prior approval of each Sub-Consultant or
Subcontractor performing work on the project may result in suspension of
work by that Subcontractor, removal of work performed by unapproved
Subcontractor(s) and all permissible sanctions against the Proposer.
2.7 Contractor Work Hours
Normal work hours for this project are:
7:00 a.m. to 7:00 p.m., Monday through Friday
Extended hours may be approved in advance by written request.
2.8 Final Inspection
The City will perform a Final Inspection upon Substantial Completion. The contractor may be
present during this inspection. All required corrections shall be completed at the
contractor's expense prior to Final Acceptance.
3 Liquidated Damages
To ensure timely completion, liquidated damages will be assessed as follows:
* $300.00 per calendar day for failure to achieve substantial completion by the
contract completion date (excluding punch list work).
* $150.00 per calendar day for failure to complete punch list items within 30 calendar
days after the issuance of the punch list.
Liquidated damages will be deducted from retainage held by the City.
3.1 Schedule Submittals
The contractor shall submit a Progress Schedule upon Notice of Award.
Additionally, the contractor shall submit a two-week advance schedule every Friday by
2:00 p.m., outlining planned activities for the upcoming week to the Director of Public
Works, Shawn Wood (swood@madisonga.com).
Section III - Proposal Requirements
The City reserves the right to determine that no proposals meet the minimum requirements
and to reject any or all submissions if deemed in the City's best interest. Proposals may be
disqualified by the City's Procurement Agent as a result of, but not necessarily limited to, the
following reasons:
1. Failure to follow City's Proposal schedule;
2. Failure to return applicable compliance and/or specification sheets;
3. Failure to return applicable addenda;
4. Failure of proposer to sign all requested documents;
5. A proposal which is non-responsive;
6. A proposal submitted by a Person who has litigation pending.
To ensure a uniform and efficient evaluation process, all proposal submittals must be
organized and presented in the exact sequential order as requested in this Request for
proposals (RFP):
1. Authentication/Cover Letter
2. Table of Contents
3. Firm Qualifications
o Years in business
o Professional history
o Georgia Contractor License (number and expiration)
4. Project Team Qualifications
o Project Manager
o Superintendent
o Key personnel resumes
5. Similar Project Experience
o Public safety/government facilities
o Projects completed within the region
o LEED/Green Building experience (if applicable)
6. Construction Approach
o Staffing
o Sequencing
o Coordination
o Overall project philosophy and goals
7. Statement of Qualifications
o Explain why your team is best suited for this project
8. Estimated Project Schedule
o Anticipated duration from Notice to Proceed
9. References
10. Acknowledgement of Addenda
Required Forms
11. Cost Proposal Form
12. W-9
13. Georgia Security and Immigration Compliance Act Affidavit
14. Notarized Contractor Affidavit
15. Acknowledgement of Insurance and Bonding Requirements
16. Proposed List of Subcontractors
17. References Form
18. Notarized Oath of Non-Collusion
19. Contact Form
20. Acknowledgement of Proposer
Section IV - Instructions to Proposers
From the date this RFP is issued until a contract is awarded, Proposers are prohibited
from contacting any City of Madison staff or elected officials regarding this solicitation,
except through the authorized point of contact identified below.
Any unauthorized communication may result in disqualification from further consideration.

With GovernmentContracts, you can:
...Project: CONSTRUCTION TIME AND MATERIALS Ref. #: RFP 27-261110 Type: RFP Status: Open ...
Paulding County School District
Bid Due: 12/10/2026
...CONSTRUCTION TIME AND MATERIALS Paulding County School District Nov 10, 2026 @ 09:31 ...
State Government of Georgia
Bid Due: 12/10/2026
...Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF... ...
State Government of Georgia
Bid Due: 12/17/2026
...Follow Prefabrication Training Venues and Construction Supplies Active Contract Opportunity Notice...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 12/29/2026