| Location: | Georgia |
|---|---|
| Posted: | Dec 4, 2024 |
| Due: | Jan 10, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77812-NONST-2025-000000002 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77812-NONST-2025-000000002 | Request for Qualifications for Engineering Services CDS/CPF STAG Drinking Water Infrastructure Proje | Clay County |
Dec 04, 2024 @ 04:10 PM
|
Jan 10, 2025 @ 04:00 PM
|
Start Date: Dec 04, 2024 @ 04:10 PM ET
End Date:
Jan 10, 2025 @ 04:00 PM ET
The Clay County Board of Commissioners is requesting qualifications for selection of an Engineering Firm to provide post-award services for a water infrastructure project funded by the FY 2024 Congressionally Directed Spending (CDS)/Community Project Funding (CDF) State and Tribal Assistance Grants (STAG) Program for Drinking Water Projects. Post-award services will include, but are not limited to, grant application development, environmental review, planning, design, cost estimating, permitting, bidding, contracting, construction oversight, quality control, grant administration, and project closeout. Statements of qualifications are being requested from Engineering Firms with a strong record in successfully assisting local governments with the design and construction administration of Federally Assisted Projects. Responding firms should be technically qualified and licensed in the State of Georgia to provide these services.
Information which should be submitted for our evaluation is as follows:
1) History of firm and resources
2) Federal Funds Engineering Experience, including STAG/CDBG/EIP/RDF/GEFA/USDA/ARPA, etc.
3) Key personnel/qualifications
4) Current workload
Experience with similar projects and list of references
6) Errors and Omissions Insurance
7) Statement of Qualifications Form
A Selection Committee will received and evaluate Statements of Qualifications submitted in response to this RFQ using the provided scoring criteria and will select a qualified Engineering Firm in a qualifications-based selection process.
Interested parties may request copies of the Qualifications Form and Scoring Criteria prior to preparing and submitting their Statement of Qualification. Questions related to this RFQ will be received in writing until 5:00 PM on January 6, 2025. Proposals shall be received no later than 4:00 PM on January 10, 2025.
| Code | Description |
| 92597 | Water Supply, Treatment, and Distribution Engineering |
Ronnie Dollar
ronnie.dollar@claycountyga.net
229-308-0113

With GovernmentContracts, you can:
...preliminary architectural report, planning, design, cost estimating, bidding, contracting...
State Government of Georgia
Bid Due: 7/07/2026
...report, planning, design, cost estimating, bidding, contracting, construction oversight, quality...
State Government of Georgia
Bid Due: 7/07/2026
...to, preparing preliminary engineering report, planning, design, cost estimating, bidding, contracting...
State Government of Georgia
Bid Due: 6/11/2026
...estimating, bidding, contracting, construction oversight, quality control, and project closeout...
State Government of Georgia
Bid Due: 7/07/2026