| Location: | Georgia |
|---|---|
| Posted: | Dec 4, 2024 |
| Due: | Jan 3, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-33552-NONST-2025-000000007 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-33552-NONST-2025-000000007 | NATURAL GAS SYSTEM REGULATOR STATION | Fort Valley Utility Commission |
Dec 04, 2024 @ 01:18 PM
|
Jan 03, 2025 @ 11:00 AM
|
Start Date: Dec 04, 2024 @ 01:18 PM ET
End Date:
Jan 03, 2025 @ 11:00 AM ET
The Fort Valley Utility Commission will accept sealed bids for the construction and installation to
upgrade 4 regulator stations to ensure the inlet valves are accessible in emergency conditions. The
four stations will be at Atlanta Sand, Cactus Hill, Golf Course and Harris Drive.
Bids will be received in the Fort Valley Utility Commission Administration Office, 500 Anthoine St,
Fort Valley, Georgia, until 11:00 a.m. local time on Friday, January 3, 2025. No bid may be
withdrawn after the closing time for the receipt of bids for a period of sixty (60) calendar days after
bid opening date.
All potential bidders must hold a current Georgia Utility Contractor¿s License of proper classification
and in full force and effect, in compliance with Act. O.C.G.A. 43-14. Contractor must be a qualified
natural gas contractor under the laws of the State of Georgia and must comply with any Federal,
State, and Municipal guidelines and regulations. Plans, specifications, and contract documents are
available for review at the Fort Valley Utility Commission, Gas Department, during regular business
hours.
Copies of bid documents and drawings may be obtained from Sapp Engineering & Services, P. O.
Box 26097, Macon, Georgia 31221, by requesting an electronic version by calling (478) 342-0386,
or emailing Jack Sapp at jrsapp@sappengineering.com.
A mandatory pre-bid meeting is scheduled for this project at the Fort Valley Utility Commission
Administration Office, 500 Anthoine St, Fort Valley, Georgia, at 11:00 a.m. local time on Friday,
December 13, 2024. If you have any questions or need additional information, please contact Jack
Sapp.
The successful Contractor will be determined in January 2025 and will be expected to start
construction by February 2025.
| Code | Description |
| 67053 | Pipeline Equipment and Tools, Construction and Laying of the Pipeline |
Tara Giles
tgiles@fvutil.com
478-825-7701 ext 250

With GovernmentContracts, you can:
..., Construction 15538 Field Offices and Sheds, Construction Type 67053 Pipeline Equipment and ...
State Government of Georgia
Bid Due: 6/12/2026
...Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation 91340... Construction, Pipeline, Including ...
State Government of Georgia
Bid Due: 7/09/2026
...and Storm Drain 67053 Pipeline Equipment and Tools, Construction and Laying of the ...
State Government of Georgia
Bid Due: 6/29/2026
...Pipeline Equipment and Tools, Construction and Laying of the Pipeline 91117 C.I.P., Construction... ...
State Government of Georgia
Bid Due: 6/11/2026