| Location: | South Carolina |
|---|---|
| Posted: | Jan 24, 2025 |
| Due: | Mar 5, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project consists of replacing the existing stormwater infrastructure along Center Street between Arctic Avenue and the outfall in Folly River, and intersecting streets along Center Street; installing green infrastructure solutions along Center Street; and re-establishing drainage connectivity along E. Erie Ave and the intersection of 8th Street E. The completion of this project will require installation within and repair of SCDOT maintained roads and rights-of-way.

With GovernmentContracts, you can:
...Ad Title: Athletic Field Sports Lighting - LED Upgrade - Design-Build Purchasing Agent/Entity...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/12/2026
..., Greenwood, SC Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator: Jeffrey... METHOD: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/14/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Frank Murray... (District) ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/08/2026
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... Engineer ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026