Quotes 2026-66SD Mini Splits
| Location: |
Massachusetts |
| Posted: |
Jul 1, 2026 |
| Due: |
Jul 21, 2026 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- 41 - Refrigeration, Air Conditioning and Air Circulating Equip.
|
| Solicitation No: |
BD-26-1150-CH015-CH015-131016 |
| Publication URL: |
To access bid details, please log in. |
|
Header Information
|
|
Bid Number:
|
BD-26-1150-CH015-CH015-131016
|
Description:
|
Quotes 2026-66SD Mini Splits
|
Bid Opening Date:
|
07/21/2026 02:30:00 PM
|
|
Purchaser:
|
Jaime Morrow
|
Organization:
|
City of Holyoke
|
|
Department:
|
CH015 - Purchasing
|
Location:
|
CH015 - Purchasing
|
|
Fiscal Year:
|
26
|
Type Code:
|
SS - Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
07/01/2026 11:25:15 AM
|
|
Info Contact:
|
Jaime Morrow, Chief Procurement Officer
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
Yes
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
Non-Mandatory but highly recommended, a pre-bid walkthrough will be held on July 10th at 2:00 pm. Meet at the front door of 728 Main Street, then we will head upstairs to the 3rd floor
|
|
Bulletin Desc:
|
Remove and replace the existing 2-ton and 4-ton split system HVAC units. installation of new gas furnaces, matching cased evaporator coils, and outdoor condensing units. The new condensing units shall be relocated to the indoor warehouse area as specified, including full re piping of refrigerant lines to accommodate the new
layout. Refrigeration piping will be properly supported, insulated, and installed installation of new electrical components and wiring to serve both condensing units.
|
|
|
Ship-to Address:
|
|
Bill-to Address:
|
Mari Colon
536 Dwight Strret #15
Holyoke, MA 01040
US
Email: Colond@holyoke.org
Phone: (413) 322-5650
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
Desired Attachment Name
|
Description
|
|
|
|
Item # 1:
(
72-15
-
12
)
|
Remove and replace the existing 2-ton and 4-ton split system HVAC units. installation of new gas furnaces, matching cased evaporator coils, and outdoor condensing units. The new condensing units shall be relocated to the indoor warehouse area as specified, including full re piping of refrigerant lines to accommodate the new
layout. Refrigeration piping will be properly supported, insulated, and installed installation of new electrical components and wiring to serve both condensing units.
|
|
U N S P S C Code:
|
72-15-12
Heating and cooling and air conditioning HVAC construction a
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Healthcare System;1400 VFW Parkway;General Warehouse;West Roxbury, MA 02132 02132 USA Point... 66--Purchase of ...
Department of Veterans Affairs
Bid Due: 9/10/2058
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.