REQUEST FOR QUALIFICATIONS
CONSTRUCTION MANAGEMENT AT RISK
PART A: PRE-CONSTRUCTION SERVICES (Design-Assist) and
PART B: CONSTRUCTION SERVICES
Learning Lab
University of Louisiana Lafayette - South Campus
Lafayette, Louisiana
Project No. 19-640-23-04, F.19002506
January 7, 2026
1
REQUEST FOR QUALIFICATIONS
CONSTRUCTION MANAGEMENT AT RISK
ISSUE DATE: January 7, 2026
TITLE:
PART A: PRE-CONSTRUCTION SERVICES (Design-Assist) and
PART B: CONSTRUCTION SERVICES
Learning Lab
University of Louisiana Lafayette - South Campus
Lafayette, Louisiana
Project No. 19-640-23-04, F.19002506
ISSUED BY:
State of Louisiana
Division of Administration
Facility Planning and Control
Claiborne Building
1201 North Third Street, Suite 7-160
Baton Rouge, LA 70802
The electronic submission of “PROPOSALS” (Statements of Qualifications) will be received for the
State of Louisiana by the Division of Administration, Office of Facility Planning and Control until 2:00
PM local time, Friday, February 6, 2026, for furnishing the work described herein. The “PROPOSAL”
must be titled “PART A: PRE-CONSTRUCTION SERVICES (Design-Assist) and PART B:
CONSTRUCTION SERVICES Learning Lab, University of Louisiana Lafayette - South Campus,
Lafayette, Louisiana, Project No. 19-640-23-04, F.19002506” and title indicated in the subject line of the
email.
In compliance with this Request for Qualifications and with all Conditions imposed herein, the undersigned
offers and agrees to furnish services in accordance with the attached signed Proposal.
I certify that I have read and understand this Request for Qualifications and am duly authorized to sign this
proposal for the Proposer. I certify that the language in this document has not been altered in any way and
appears as originally transmitted by the issuing authority.
NAME AND ADDRESS OF FIRM (PROPOSER):
_________________________________ DATE: ________________________________
_________________________________ BY: ________________________________
_________________________________ NAME: ________________________________
_________________________________ TITLE: ________________________________
PHONE: ________________________________
EMAIL: ________________________________
PROPOSAL (including all attachments) shall be submitted in electronic format only and emailed to:
FPC-RFQ@la.gov prior to the stipulated deadline for receipt of Proposals (Statements of
Qualifications).
2
REQUEST FOR QUALIFICATIONS
CONSTRUCTION MANAGER AT RISK
PART A: PRE-CONSTRUCTION SERVICES (Design-Assist) and
PART B: CONSTRUCTION SERVICES
Learning Lab
University of Louisiana Lafayette - South Campus
Lafayette, Louisiana
Project No. 19-640-23-04, F.19002506
January 7, 2026
TABLE OF CONTENTS
1.0 GENERAL INFORMATION
2.0 ADMINISTRATIVE INFORMATION
3.0 PROPOSAL INFORMATION
4.0 RESPONSE INSTRUCTIONS
5.0 EVALUATION AND SELECTION
6.0 CONSTRUCTION MANAGER AT RISK REQUIREMENTS
7.0 PROJECT DESCRIPTION
8.0 KEY PROJECT VALUES
9.0 PRE-CONSTRUCTION SERVICES (DESIGN-ASSIST) SCOPE OF WORK
10.0 CONSTRUCTION SERVICES SCOPE OF WORK
11.0 PROJECT SCHEDULE
12.0 SAMPLE MATRIX OF PRIOR PROJECTS PORTFOLIO AND KEY PERSONNEL
13.0 SAMPLE WORKSHEET – PRE-CONSTRUCTION SERVICES STAFFING PLAN
14.0 SAMPLE DIVISION OF COST ELEMENTS
15.0 ACKNOWLEDGEMENT OF RFQ ADDENDA
16.0 EXHIBIT A - DRAFT OWNER/CONSTRUCTION MANAGER AGREEMENT (AIA A133-2009)
(posted separately via addendum)
17.0 EXHIBIT B - GENERAL CONDITIONS OF THE CONTRACT (AIA A201-2017)
(posted separately via addendum)
18.0 EXHIBIT C – PROGRAM AND SCHEMATIC DESIGN CONCEPTS (posted separately via
addendum)
19.0 EXHIBIT D – BIM REQUIREMENTS (posted separately via addendum)
3
1.0 GENERAL INFORMATION
1.1 INTRODUCTION AND PURPOSE
The purpose of this Request for Qualifications (RFQ) is to solicit Proposals (Statements of
Qualifications) from qualified applicants to award contracts for Part A: Pre-Construction
Services (Design-Assist) and Part B: Construction Services for the State of Louisiana
(herein defined as “State” or “Owner”). Owner intends to contract with a qualified CMAR
contractor to provide Pre-Construction Services and Construction Services, including
guaranteeing the maximum cost of construction through a Guaranteed Maximum Price
(GMP) contract. The contracting of Part B: Construction Services with the successful
CMAR contractor will be at the Owner’s option. Selection of the CMAR contractor will
be a selection method based on the criteria evaluation and scoring addressed in Section 5
of this RFQ. The Owner seeks a qualified CMAR contractor to coordinate the day-to-day
facilitation, communication and management of pre-construction design assist and
construction of this Project for the various components described in this RFQ. It is
anticipated that the CMAR contractor will be responsible for and accountable to manage
several second tier contractors.
“If owner and the CMAR contractor are not able to agree upon constructability,
construction phasing and sequencing, the GMP for the project, the maximum number of
contract days to complete the project, and to reach a negotiated agreement, then the project
shall be re-advertised and publicly bid utilizing the design-bid-build delivery method,
provided the CMAR contractor shall be prohibited from bidding on the project.” La. R.S.
38:2225.2.4(G)(6).
1.2 GENERAL DESCRIPTION AND BACKGROUND
This multi-phase project consists of renovations, repurposing, and expansion of the former
65,000 sq ft Estuarine Habitats and Coastal Fisheries Center into a new Pre-K through 12th
Grade Learning Lab School proposed for the University of Louisiana Lafayette - South
Campus in Lafayette. This project will also include selective destructive testing and any
required hazardous materials remediation of the existing structure(s) in order to facilitate
proposed renovations.. See Section 7 and Exhibit C for further details.
The estimate of the Guaranteed Maximum Price (GMP) for this Project is $49,350,000.00
and the target date for completion is March 15, 2029.
AQ Studios, LLC / Pfluger Architects, AJV has been selected as the Designer (Professional
of Record) for this Project. Proposers shall have no communications with the Designer
regarding this RFQ prior to selection of the CMAR contractor.
The CMAR contractor shall determine whether certain elements of the entire project can
be completed simultaneously while considering the Owner’s priority in overall schedule
and completion of the various subparts / phases as applicable and shall be responsible for
making final determinations on scheduling, the limits of construction amongst the various
phases (where applicable), and the management of all aspects of the construction activities
with the goal being the delivery of the subparts/ phases within the stipulated contract time
(refer to Section 11: Project Schedule and Exhibit A: DRAFT Owner / Construction
Manager Agreement AIA A133-2009).
4
1.3 WORK TO SUPPORT AN ACCELERATED START
Advanced Construction Start (ACS) construction activities at the Owner’s option may be
amended into / become part of the Part A: Pre-Construction Services contract accompanied
by a mutually agreed upon increase/adjustment in the pre-construction services fee,
contract amount and contract time. Note that a 100% Performance and Payment Bond will
be required for the total value of the construction activities amended into the Part A
contract. Examples of related construction activities, include but are not limited to the
following:
1.3.1
ENVIRONMENTAL REMEDIATION /SELECTIVE DEMO (where applicable)
Accelerated delivery of the project is a priority within the overall program. The
CMAR contractor shall develop fast track schedule(s) for delivery of the
completed project inclusive of subcontracts, shop drawing approvals, fabrication,
testing and installation. Mock-ups and related testing in a laboratory setting, if
required, shall be coordinated and supervised by the CMAR contractor and
observed/confirmed by the Designer.
1.3.2 TEST PILE PROGRAM (where applicable)
It is anticipated that a Test Pile Program will be implemented prior to the award of
the Part B: Construction Services contract. If required, the CMAR contractor may
be asked to implement a program intended to gather data to verify loading
conditions for pile supported structures (where applicable)
1.3.3 FILL, SURCHARGE AND WICKING (where applicable)
If deemed necessary during the design phase, fill and surcharge fill may be placed
to assist in elevating the grade and compacting underlying soils to prepare for
construction. In that process, settlement would be anticipated. To accelerate
settlement to allow construction to commence, a program of wicking excess water
from the compacting soils may be required. If required, the CMAR contractor may
be asked to implement the fill, surcharge and wicking program prior to the delivery
of the GMP proposal and Part B: Construction Services contract. Geotechnical
monitoring and/or testing, as deemed necessary, shall be provided by the Owner.
1.3.4 LONG LEAD ORDERS
Due to the Owner’s desire to complete the project as soon as possible, the CMAR
contractor shall identify long-lead items (i.e. lab casework, mechanical / electrical
equipment, structural steel, etc.) for inclusion in the ACS activities.
1.4 STATEMENT OF INTENT
The Owner intends to use the CMAR delivery method for this Project due to the benefits
it creates to the Owner and to the public interest through collaboration, a team approach,
cost control, the ability for advance start work to accelerate the schedule, to alleviate cost
risks and to ensure meeting the budget with a GMP proposal on time and in budget.
1.4.1
PROJECT TEAM
1.4.1.1 Owner will have a primary representative for the project who will provide
oversight and assist in all matters of project coordination and decision-
5