Project Description: The following is a general sequence of Work to be completed under this project:
A. Remove existing storm drain pipe and concrete waterway and install storm drain pipe and structures;
B. Loop utility conflicts as necessary;
C. Rotomill existing asphalt and regrade west leg of intersection with approximately 18-inches of fill at the concrete waterway and tapering in the west and east directions and prepare final grade prior to overlay;
D. Striping work;
E. All work done according to APWA Standards and Specifications.
Complete bid documents for this project can be viewed/downloaded from the FILES section of this advertisement.

With GovernmentContracts, you can:
...Project: SLCo PWO130995-1 Asphalt Concrete Mix - RFC Ref. #: SLCo PWO130995-1 Asphalt ...
State Government of Utah
Bid Due: 12/31/2026
...approaches, cross gutters, and concrete flatwork; Asphalt saw cutting and patching; Excavation, grading... ...
State Government of Utah
Bid Due: 8/05/2026
..., Electrical & Lighting, Concrete & Hardscapes, Asphalt, Utility & Drainage Systems, Site...
State Government of Utah
Bid Due: 8/07/2026
...asphalt paving shall remain in place wherever practical, and all new concrete aprons, ...
Vernal city
Bid Due: 8/27/2026