| Location: | Georgia |
|---|---|
| Posted: | Jan 23, 2025 |
| Due: | Feb 25, 2025 |
| Agency: | Chatham County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0013-5 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work will consist of furnishing all materials, labor, and equipment for:
The installation of a traffic signal at Little Neck Road at its intersection with John Carter Road and DOT Barn Road. This intersection is offset by approximately 170 feet. Work to include grading (complete), traffic signal equipment, traffic signal timing, striping and signing. This is a temporary traffic signal being installed until the interchange improvement project
All work shall be according to the plans and special conditions attached under Supporting Documents on the Chatham County Purchasing Bonfire portal. The Prime Contractor must be pre-qualified by GDOT at the time of the bid opening. All subcontractors must be qualified or registered by GDOT prior to beginning work on the project.

With GovernmentContracts, you can:
...SURFACE INSTALLATION, GRADING, TREE DEMOLITION, PLANTING AND IRRIGATION INSTALLATION, AND LIMITED... DRAINAGE WORK. ...
State Government of Georgia
Bid Due: 8/17/2026
...Airport ? Hangar Development Phase 1. This project consists of site grading for ...
State Government of Georgia
Bid Due: 8/19/2026
..., materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures... grading, ...
State Government of Georgia
Bid Due: 8/25/2026
..., equipment, and labor for the construction of: BOARDWALK REPLACEMENT AT REED CREEK ...
State Government of Georgia
Bid Due: 8/27/2026