| Location: | North Carolina |
|---|---|
| Posted: | Nov 3, 2026 |
| Due: | Nov 5, 2026 |
| Agency: | Wake County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQ #26-097 |
| Publication URL: | To access bid details, please log in. |
RFQ #26-097 Engineering Services for Construction & Renovation Projects
Due Date/Time: Nov. 5, 2026, by 2 p.m.
Contact: Maged Sedarous, maged.sedarous@wake.gov
REQUEST FOR QUALIFICATIONS AND
PROPOSALS
ENGINEERING SERVICES FOR
CONSTRUCTION & RENOVATION PROJECTS
RFQ #26-097
October 14, 2026
I. Project
Engineering Services for Wake County Construction & Renovation Projects
II. Summary of Projects
Wake County occupies or has responsibility for 200 buildings totaling over 5.0 million square feet of
building space. In accordance with Wake County's commitment to protecting and preserving its assets,
the Facilities Design & Construction Department manages the planning, design and construction of all
capital investment and preventive maintenance funding projects undertaken by the County. Generally, the
projects include improvement and/or replacement of mechanical, electrical and plumbing systems and
equipment for libraries, public safety facilities, health and human services buildings, justice and detention
facilities, parks, office buildings, historic building restorations, emergency communications facilities,
water and sewer facilities, and solid waste facilities. Design, construction work, materials testing and
various other services are outsourced to private firms through competitive procurement methods as
allowed by NC General Statutes. Construction costs for projects in this request will range between
$10,000 and $4.0 million each.
The following projects are among those that have been targeted for implementation over the next 3 years:
Wake County Courthouse AHUs & VAV Replacements
Wake County Courthouse Chiller and Pumps Replacements
Wake County Detention Center AUS and CRAC Replacement
Green Road Library HVAC Replacement
Marble Museum AHUS and VAVs Replacement
Wake County Public Safety Center Cooling Towers and Pumps Replacement
Wake Brook HVAC Renovation
Yates Mill AE Finley AHUs and VAVs Replacement
Eastern Regional Center AHU & Chiller Replacement
Law Enforcement Training Center AHU & VAV Replacement
Radio Tower Generator Replacements
Wake County Office Building Chiller, Cooling Tower, & AHU Replacements
In addition to the above, there will be some building system replacements that are part of much larger,
more comprehensive renovation projects for which the selected engineering consultant firms from this
RFQ may be requested as part of those overall design teams. Finally, there may also be several smaller
planned projects managed by Wake County General Services, for which engineering services may be
requested from the selected engineering consultant firms.
III. Request
Wake County Government hereby requests qualifications and proposals from engineering consultant
firms for providing all mechanical, electrical, plumbing, and fire protection engineering services required
to satisfactorily complete all phases of an assigned project within stipulated time limitations. The
engineering consultant firm shall take the lead project management role of the design team. Anticipated
services include the following:
Page 3 of 10
* Preliminary Design (Studies and Assessments)
* Cost estimating
* Life Cycle Cost analyses and evaluation of various alternative energy conservation options
(consistent with County Guidelines for Designing Energy Efficient Buildings)
* Schematic Design
* Design Development
* Construction Documents
* Bidding Phase
* Construction Administration
* Project Close-out including warranty administration
* All other services requested and customarily furnished by an engineer and its consultants on
similar projects and in accordance with the terms and conditions of the Standard Wake County
Agreement for Professional Services.
IV. Consultant Qualifications
The engineering consultant firm and proposed staff to be assigned responsibilities on Wake County
projects must be highly qualified and experienced in all phases of the planning, design, and construction
of similar public facilities. In addition, the engineering consultant firm and proposed staff must have
extensive experience in all aspects of mechanical, electrical, plumbing, and fire protection engineering on
similar projects, extensive knowledge of the regulations governing the design, bidding, and construction
of such facilities in the State of North Carolina, experience in extensive facility investigation and
evaluation, Demonstrated experience in providing design and construction administration services for
high-security facilities, and a proven capability to effectively and efficiently manage projects of similar
complexity to produce a facility consistent with and meeting the needs and goals outlined by Wake
County. Consulting firm will become knowledgeable of the "Wake County Design and Construction
Guidelines and Standards" and the "Wake County Energy Design Management Guidelines".
V. Scope of Work
Provide all mechanical, electrical, plumbing and fire protection engineering design services required for
Wake County Construction & Renovation Projects.
VI. Project Schedule
The duration of projects varies from several months to years, depending on size, complexity, and
logistical requirements. The contract documents for each project specifies the construction period and
requires the awarded contractor to develop a detailed construction schedule.
Page 4 of 10
VII. Proposal Format Requirements
All proposals shall be submitted on 812" x 11" paper, side bound with Table of Contents and reference
tabs for key sections. The total submittal shall not exceed either twenty (25) double-sided or fifty (50)
single-sided pages with text, consecutively numbered (front/back covers, cover letter, Table of Contents
and Tab pages are excluded from these totals). Submittals must include responses to each of the
following:
A. Letter of Interest
Letter of interest including information about the engineering consultant's firm such as
history/background, years of service, number of employees, number of locations, certifications,
professional memberships, and other relevant information which the engineering consultant believes
to be of importance.
B. Project Organization and Staffing of Design Team
Provide the following:
1. Organization chart listing all assigned staff including job titles.
2. Detailed resumes of all assigned staff with list of completed projects and years of experience.
3. Description of responsibilities to be fulfilled by each assigned staff member.
4. Current workload of staff members.
C. Experience
Provide summary of at least four (4) representative projects for which the engineering consultant was
responsible. Each of the project summaries shall include the following:
1. Description of facility or project, including size, functions housed, original project budget,
actual project cost, and year completed,
2. Description of services provided,
3. Summary of client's program along with key design elements and how they were addressed,
4. List of staff assigned to the project,
5. Degree of involvement (prime or associate),
6. Associate firms involved and their assigned responsibilities,
7. Principal and associate staff involved along with their assigned responsibilities, and
8. References including names, addresses (including e-mail addresses) and telephone numbers.
D. Design Approach
Provide the following:
1. Describe your approach to the project design to assure the Owner's functional and quality
requirements are satisfactorily addressed for the Project. Explain your firm's procedures for
quality control and coordination of the various disciplines of work in preparing construction
documents.
Page 5 of 10
2. Describe the process by which your firm will develop alternative schematic design solutions
for the Project.
3. Explain the design team's use of whole building energy analysis (including life cycle cost
analyses) and identify in detail the specific studies which will be undertaken during the various
phases of the Project to assure the building is energy efficient and complies with the County's
"Wake County Energy Design Management Guidelines." Identify specific ASHRAE
standards which will be followed and the specific computer software which will be used for
energy analysis to insure efficient facility design.
4. Describe any Computer-Aided Drafting, Building Information Modeling, and Design
technology that will be used by your firm and that of your associates.
5. Explain how your firm will prepare cost estimates and control project cost to assure the project
budget is not exceeded.
6. Explain the management tools, techniques and procedures your firm uses to maintain the
project's schedule.
7. Describe your teams approach to evaluating existing conditions in complex occupied existing
facilities.
8. Describe your team's approach to operation and maintenance considerations in both the design
and construction administration phases.
9. Explain how your firm manages the Construction Administration process to include
conducting project meetings, reviewing submittals, responding to requests for information,
issuing field orders, processing construction change directives, issuing bulletin drawings,
reviewing and justifying contractors' cost proposals, processing change orders, processing
payment applications, performing final inspections and assembling close-out documents.
10. Describe in detail steps which will be taken by your firm to guard the Owner against defects
and deficiencies in the work of the contractors during the construction phase.
11. Explain why you believe your firm is the most qualified firm to provide the requested services
for this Project.
E. Consultant Professional Fees, Litigation, and Workload
1. Submit an hourly billing rate schedule for all personnel by job title who will work with the
County in providing professional services for this project. Provide firm's unit costs schedule.
2. List any pending or settled lawsuits, mediation or arbitration cases in which the firm was
involved during the past ten (10) years.
3. List current and proposed projects including man-hour estimates, scheduled completion dates,
and assigned team members. Provide workload chart indicating monthly commitments of
team members for next twelve months.
VIII. Selection of Engineering Consultant Firms
A. Process
Procedures similar to those followed by Wake County in the selection of design consultants will be
followed. This will ensure that the engineering consultant firms are selected in a fair and uniform
manner and have appropriate qualifications and experience.
Page 6 of 10
A Selection Committee comprised of County staff has been established. Upon receipt of proposals
from respondents, Selection Committee members will review the proposals in detail and identify
("short list") those firms that appear to be most qualified to provide services for the Project. Separate
presentations and interview sessions will then be scheduled with the "short-listed" firms to permit the
Selection Committee to further evaluate each firm's qualifications and proposal. From these
interviews, it is anticipated that the Selection Committee will select three (3) to four (4) firms to
perform the referenced work. Upon selection, the Department of Facilities Design & Construction will
the negotiate terms, conditions and fees of a professional services agreement with each selected firm.
In the event negotiations of specific contract terms and conditions prove unsuccessful with a selected
firm, the Selection Committee will select another firm with which to begin contract negotiations.
B. Timeline
The key activities and milestone dates for the selection process are listed below:
Activity Milestone Date
Announce Request for Qualifications and Proposal October 15, 2026
Deadline for Respondent Questions October 30, 2026
Proposal Submission Deadline November 5, 2026
Selection Committee Meeting to Determine Short List November 20, 2026
Selection Committee Presentation/Interviews Sessions December 11, 2026
Announce Firm Selections December 18, 2026
IX. Evaluation Criteria
A. The following criteria will be the basis on which firms will be selected for further consideration:
1. Core business strength,
2. Organizational chart and expertise/qualifications of staff,
3. Experience and past performance of firm on similar projects,
4. Project Quality Control plan including recent experience with cost control, change orders, and
maintaining design and construction schedules,
5. Design approach including innovative design solutions, capabilities, and proven experience in
extensive evaluations of facility energy consumption and life cycle cost analyses,
6. Operation and maintenance considerations in both design and construction administration
phases,
7. Construction administration approach,
8. Hourly billing rates,
9. Record of successfully completed projects without major legal or technical problems,
10. Current workload, and
11. Other factors that may be appropriate for the Project.
Page 7 of 10
X. Submission of Proposals
Five (5) complete packages must be received at the following address by 2:00 p.m. on Thursday
November 5, 2026.
County of Wake
Facilities Design & Construction Office
336 Fayetteville Street, WCOB 11th Floor,
Raleigh, North Carolina 27601
Attention: Maged Sedarous, Facilities Project Manager
XI. Professional Services Agreement
Professional services required to complete the proposed projects will be authorized through the County's
standard form of Agreement for Professional Services. The terms of the Agreement will be a three-year
period. Wake County will retain the option to renew at the end of the three-year term. Implementation of
projects will be accomplished by amendment to the base Agreement.
XII. General Comments
A. Any cost incurred by respondents in preparing or submitting a Request for Qualifications and
Proposal for the Project shall be the respondents' sole responsibility.
B. All responses, inquiries or correspondence relating to this Request for Qualifications and Proposal
will become the property of Wake County when received (subject to Section XIII -
Confidentiality).
C. Wake County has sole discretion and reserves the right to reject any and all responses received
with respect to this Request for Qualifications and Proposal and to cancel the process at any time
prior to entering into a formal agreement. The County reserves the right to request additional
information or clarification of information provided in the response without changing the terms of
the Request for Qualifications and Proposal.
D. The Selection Committee intends to select a minimum of three engineering consultant firms to
provide professional services for Wake County Facilities Design & Construction projects.
E. Please refer to the following website location for a copy of the Request for Qualifications and
Proposal and any other related information. If a question of general concern is asked by any firm,
an addendum will be issued to include a copy of the written response.
http://www.wakegov.com/finance/business/rfp/Pages/bids.aspx
F. Below is a list of electronic files that can be accessed on the following ftp web site:
https://www.wakegov.com/departments-government/facilities-design-
construction/facilities-design-construction-guidelines-standards
Page 8 of 10
Agreement for Professional Services
Amendment [One] to Agreement for Professional Services
Wake County Energy Design Management Guidelines
Wake County Design and Construction Guidelines and Standards
G. Respondents are advised to refrain from contact with Selection Committee members. Any specific
questions regarding the Request for Qualifications and Proposal should be directed to the Project
Manager at the following addresses:
Maged Sedarous
Facilities Project Manager
County of Wake
Facilities Design & Construction Office
Wake County Office Building, 11th Floor
P.O. Box 550
Raleigh, NC 27602
TEL (919) 856.6364
FAX (919) 856-6355
maged.sedarous@wake.gov
XIII CONFIDENTIALITY OF DOCUMENTS
In general, documents that are submitted as part of the response to this Request for Qualifications and
Proposal will become public records, and will be subject to public disclosure. North Carolina General
Statutes Section 132-1.2 and 66-152 provide a method for protecting some documents from public
disclosure. If the engineering consultant firm follows the procedures prescribed by those statutes and
designates a document "confidential" or "trade secret", the County will withhold the document from
public disclosure to the extent that it is entitled or required to do so by applicable law.
If the County determines that a document that the engineering consultant firm has designated
"confidential" or "trade secret" is not entitled to protection from public disclosure, the County will
provide notice of that determination to the contact person designated by the firm, in any reasonable
manner that the County can provide such notice, at least five business days prior to its public disclosure of
the document. If the firm does not designate anyone to receive such notice, or if, within five business
days after the designated person receives such notice, the firm does not initiate judicial proceedings to
protect the confidentiality of the document, the County will not have any obligation to withhold the
document from public disclosure.
By submitting to the County a document that the engineering consultant firm designates as "confidential"
or "trade secret", the firm agrees that in the event a third party brings any action against the County or any
of its officials or employees to obtain disclosure of the document the firm will indemnify and hold
Page 9 of 10
harmless the County and each organization's affected officials and employees from all costs, including
attorney's fees incurred by or assessed against any defendant, of defending against such action. The firm
also agrees that at the County's request the firm will intervene in any such action and assume all
responsibility for defending against it, and that the firm's failure to do so will relieve the County of all
further obligations to protect the confidentiality of the document.
Page 10 of 10

With GovernmentContracts, you can:
Follow DEVCOM ARMY RESEARCH LABORATORY BROAD AGENCY ANNOUNCEMENT FOR FOUNDATIONAL RESEARCH Active Contract
DEPT OF DEFENSE
Bid Due: 11/20/2027
Follow DEVCOM ARMY RESEARCH LABORATORY BROAD AGENCY ANNOUNCEMENT FOR FOUNDATIONAL RESEARCH Active Contract
DEPT OF DEFENSE
Bid Due: 11/20/2027
Follow DEVCOM ARMY RESEARCH LABORATORY BROAD AGENCY ANNOUNCEMENT FOR FOUNDATIONAL RESEARCH Active Contract
Federal Agency
Bid Due: 11/20/2027
Bid Title: ITB: Ocean Ridge Reclaimed Waterline Category: Public Utilities Status: Open Description:
Brunswick County
Bid Due: 11/19/2026