| Location: | Colorado |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 22, 2026 |
| Agency: | HEALTH AND HUMAN SERVICES, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 75D301-26-R-73423 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas.
The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government.
Period of Performance:
Completion is required within 180 days after Notice to Proceed.
Minimum Vendor Qualifications:
Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.
| Apr 8, 2026 | [Combined Synopsis/Solicitation (Updated)] Level 2 FRP Over Lab Ceilings Installation- COFC0401 |
| Apr 27, 2026 | [Combined Synopsis/Solicitation (Updated)] Level 2 FRP Over Lab Ceilings Installation- COFC0401 |
| May 7, 2026 | [Combined Synopsis/Solicitation (Updated)] Level 2 FRP Over Lab Ceilings Installation- COFC0401 |

With GovernmentContracts, you can:
...smoke detection control panels which are monitored by the base building fire alarm ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/11/2026