| Location: | Florida |
|---|---|
| Posted: | Jul 17, 2025 |
| Due: | Aug 1, 2025 |
| Agency: | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 80KSC025R0009 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
NASA/John F. Kennedy Space Center plans to issue a Request for Proposal (RFP) for 80KSC025R009, Revitalize Power Systems at the VAB Tower C, John F. Kennedy Space Center, Florida.
The North American Industry Classification System (NAICS) code for this procurement is 237130, Power and communication Line and Related Structures Construction with a size standard of $45,000,000.
The objective of this project is to replace the obsolete substations and associated equipment which will significantly increase the safety of the facility and maintenance personnel. Additionally, the new substations will increase the availability and reliability of the VAB Tower C power system.
This project consists of replacing existing VAB Tower C substations 804, 874 (10th floor) and 875 (32nd floor) and all associated 480V sub-fed panels located inside Tower C at the VAB with new reliable code compliant electrical substations and associated downstream equipment. Additionally, a new Arc Flash study will be performed as a part of this project.
This is a 100% Small Business Set-Aside procurement.
Estimated solicitation release date for this requirement is August 2025, with a project period of performance of approximately 800 calendar days. Estimated award amount is anticipated between $5,000,000 and $10,000,000.
| Aug 7, 2025 | [Solicitation (Updated)] Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300 |
| Aug 15, 2025 | [Solicitation (Updated)] Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300 |
| Aug 20, 2025 | [Solicitation (Updated)] Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300 |
| Aug 29, 2025 | [Solicitation (Updated)] Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300 |
| Sep 2, 2025 | [Solicitation (Updated)] Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300 |
| Sep 3, 2025 | [Solicitation (Updated)] Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300 |
| Sep 4, 2025 | [Solicitation (Updated)] Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300 |

With GovernmentContracts, you can:
....) - Architectural [913-16] Construction, Communication Equipment (Includes Antenna Towers) [914-29...] Communication Systems, ...
City of St. Cloud
Bid Due: 6/21/2029