Annual Needs - CIPP Liner Addendum 1

Location: North Carolina
Posted: Apr 17, 2026
Due: Apr 22, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • 10 - Weapons
Publication URL: To access bid details, please log in.
  • ME00112
    POC
    Annual Needs - CIPP Liner
  • Attachment Preview

    ME00112
    Division-Wide
    COVER SHEET
    PROPOSAL SHEET
    TABLE OF CONTENTS
    PROJECT SPECIAL PROVISIONS
    SCOPE OF WORK:.................................................................................................................... G-1
    DIVISION LET CONTRACT PREQUALIFICATION: ........................................................... G-1
    MANDATORY PRE-BID CONFERENCE (Prequalifying to Bid): ......................................... G-1
    INTERESTED PARTIES LIST NOT REQUIRED: .................................................................. G-2
    HAUL ROADS:.......................................................................................................................... G-3
    CONTRACT TIME FOR ID/IQ:................................................................................................ G-3
    INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES: ....... G-3
    INTERMEDIATE CONTRACT TIME NUMBER 2 AND LIQUIDATED DAMAGES: ....... G-5
    INTERMEDIATE CONTRACT TIME NUMBER 3 AND LIQUIDATED DAMAGES: ....... G-6
    NON-EXCLUSIVE CONTRACT:............................................................................................. G-7
    WORK ORDER ASSIGNMENT (MULTIPLE AWARDS) FOR ID/IQ: ................................. G-8
    BONDING REQUIREMENTS FOR ID/IQ: .............................................................................. G-8
    MOBILIZATION AND LIQUIDATED DAMAGES FOR ID/IQ: ........................................... G-9
    RENEWAL OF CONTRACT (CPI PRICE ADJUSTMENT) FOR ID/IQ: ............................ G-10
    DISPUTE RESOLUTION PROCESS FOR ID/IQ: ................................................................. G-10
    NO MAJOR CONTRACT ITEMS:.......................................................................................... G-11
    NO SPECIALTY ITEMS: ........................................................................................................ G-11
    FUEL PRICE ADJUSTMENT PAPER BID: .......................................................................... G-11
    SCHEDULE OF ESTIMATED COMPLETION PROGRESS:............................................... G-12
    MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE
    (DIVISIONS):........................................................................................................................... G-12
    MULTI-YEAR MAINTENANCE CONTRACTS (ID/IQ): .................................................... G-27
    RESTRICTIONS ON ITS EQUIPMENT AND SERVICES:.................................................. G-28
    USE OF UNMANNED AIRCRAFT SYSTEM (UAS): .......................................................... G-28
    EQUIPMENT IDLING GUIDELINES:................................................................................... G-28
    OUTSOURCING OUTSIDE THE USA: ................................................................................. G-29
    NOTIFICATION OF OPERATION: ....................................................................................... G-31
    PAYMENT AND RETAINAGE.............................................................................................. G-31
    TOLL FACILITY REIMBURSEMENT:................................................................................. G-31
    TOLL TRAFFIC COORDINATION: ...................................................................................... G-32
    ROADWAY .................................................................................................................................R-1
    STANDARD SPECIAL PROVISIONS
    AVAILABILITY OF FUNDS TERMINATION OF CONTRACTS ..................................SSP-1
    ERRATA..................................................................................................................................SSP-2
    PLANT AND PEST QUARANTINES ...................................................................................SSP-5
    MINIMUM WAGES ...............................................................................................................SSP-6
    TITLE VI AND NONDISCRIMINATION: ...........................................................................SSP-7
    ON-THE-JOB TRAINING ....................................................................................................SSP-16
    ME00112
    G-1
    Division-Wide
    PROJECT SPECIAL PROVISIONS
    GENERAL
    SCOPE OF WORK:
    This work shall consist of the rehabilitation of existing storm water pipes, or culverts by the
    method or methods specified at the designated locations described in the Contract.
    Pipe liner systems used for rehabilitation shall be from the NCDOT Approved Products List and
    may be subject to limitations for use as specified herein, by site-specific limitations for those
    locations listed in the Contract, or limitations as shown on the NCDOT Approved Products List
    for the specific liner system. The Contractor shall consult the Contract to determine the
    method or methods that are permitted at each rehabilitation location.
    Liners provided per these special provisions shall be designed per the NCDOT Manual for Pipe
    Rehabilitation.
    The Contractor shall provide contract submittals as called for herein to the Engineer a
    minimum of 10 days prior to start of installation.
    DIVISION LET CONTRACT PREQUALIFICATION:
    (07-01-14)(12-1-16)
    SPD 01-410
    Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime
    Contractor prior to submitting a bid. Information regarding prequalification can be found at:
    https://connect.ncdot.gov/business/Prequal/Pages/default.aspx.
    Prior to performing the work, the prime contractor and/or subcontractor(s) shall be prequalified
    in the work code(s) which are identified as work items in the prime contractor’s construction
    progress schedule that they will complete themselves. Any contractor identified as working
    outside their expertise may be considered in default of contract.
    MANDATORY PRE-BID CONFERENCE (Prequalifying To Bid):
    (7-18-06) (Rev. 12-23-25)
    SPI 1-14A
    In order for all prospective bidders to have an extensive knowledge of the project, all prospective
    bidders shall attend a mandatory pre-bid conference at 1:30 p.m., Thursday April 9th, 2026.
    NCDOT Century Center Building B
    Temporary Construction Entrance to Building B Door B-2
    Boiling Springs Conference Room
    1020 Birch Ridge Drive
    Raleigh, NC 27610
    (919)707-7160
    ME00112
    R-8
    Division-Wide
    - Soft spots
    - Blisters or bubbles
    - Delaminations
    - Gaps in the length of the CIPP
    - Gaps or a loose fit between the exterior of the CIPP and the culvert
    • Test results indicate one of the following:
    - If heat cured, 2 of the 3 flat plate samples do not have any of the following:
    - The specified modulus of elasticity
    - The specified flexural strength
    - Either the specified modulus of elasticity or the specified flexural strength
    - If UV cured, 2 of the 3 cured samples do not have any of the following:
    - The specified modulus of elasticity
    - The specified flexural strength
    - Either the specified modulus of elasticity or the specified flexural strength
    The liner thickness is less than the greater of either one of the following:
    - Specified thickness
    - Calculated minimum thickness shown in your authorized work plan
    Materials and installation methods are not those shown in your authorized
    - Materials and installation methods are not those shown in your authorized
    installation plan
    - Defects are excessive or unrepairable
    - CIPP is not continuous or does not fit tightly for the full length of the culvert.
    If UV cured, and post installation inspections reveal signs of incomplete curing (dripping resin,
    - etc), contractor will trim liner obscuring uncured liner, re-wet, and re-cure with UV.
    Category B - Fold and Form Flexible Liners:
    When Category B - Fold and form flexible liners are specified, the liner system shall conform to
    the following requirements as supported by submitted design calculations:
    Must provide hydraulic calculations comparing existing culvert to proposed
    culvert liner.
    Must provide structural calculations.
    Standards references:
    o ASTM D1784 defines PVC cell class
    o ASTM F1504 for PVC cell classification 12334 or 13223
    ME00112
    R-9
    Division-Wide
    o ASTM F1533 for polyethylene
    o ASTM F714 for polyethylene min. cell classification 335420 and 24%
    carbon black - ASTM F1606 for deformed polyethylene
    o ASTM F1947 for folded PVC
    o ASTM F1867 for folded / formed PVC Type A
    o ASTM F1871 for PVC Type A
    Polyethylene liner may not be used in applications where liner creep due to
    thermal expansion and contraction will be a detriment, such as a pipe with direct
    lateral connections.
    Minimum SDR shall be 32.5 to limit liner thickness and ensure adequate liner
    material properties.
    Must exactly follow ASTM F1606 Appendix X1.2.2 Fully Deteriorated Design
    Condition for Polyethylene; or ASTM F1947 Appendix X1.2.2 Fully Deteriorated
    Design Condition for PVC.
    o Check Fully Deteriorated design thickness against ASTM F1606
    Appendix X1.2.1 Partially Deteriorated design thickness for Polyethylene;
    and ASTM F1947 Appendix X1.2.1 Partially Deteriorated design
    thickness for PVC. Use the thicker of Partially Deteriorated and Fully
    Deteriorated design methods.
    Minimum pipe ovality of 2% used for calculations.
    o If actual ovality is greater than 12.5% as described in ASTM F1947,
    submit calculations based on alternative design methods.
    Soil Enhancement Factor, maximum of 7.
    326BPoisson’s Ratio = 0.45 for PE and 0.38 for PVC.
    o Grout is assumed to have no greater load bearing capacity than
    surrounding soil.
    o Assume groundwater table elevation at greater of: crown of pipe or ½ the
    distance between lowest invert of pipe and highest ground elevation over
    pipe.
    o Traffic loading is HS-20. Neglect after 8 ft of cover on single barrel
    culverts if span length is 8 ft or less. For multiple span culverts, the effects
    may be neglected where the depth of fill exceeds the distance between
    inside faces of endwalls. See AASHTO LRFD Bridge Design
    Specifications for additional information.
    Total unit weight of soil is 120 pcf.
    Modulus of soil reaction is 1,000 psi.
    Factor of safety N = 2.0.
    Long Term Modulus of Elasticity, 50-year sustained loading value
    shall be used.
    ME00112
    R-10
    Division-Wide
    22,000 psi shall be used for HDPE, PE, PP; and 140,000 psi shall be used for PVC; per
    AASHTO LRFD Bridge Design Specifications 8th ed., Table 12.12.3.3- Alternately, NCDOT
    Type 2 or Type 5 certifications may be submitted by vendors or contractors for proof of value
    used in calculations.
    Warranty :
    The Contractor shall provide a one year warranty on all materials and workmanship.
    III. MEASUREMENT & PAYMENT
    Pre Installation Inspection will be measured and paid for as the actual number of linear feet of
    pipe inspected, including mobilization of equipment, and production of records. Linear footage is
    not increased for multiple passes of inspection equipment through a length of pipe.
    Pipe Rehabilitation will be measured and paid for as the actual number of linear feet of pipe for
    the Size, and Method that has been incorporated into the completed and accepted work. Note: At
    locations shown in the Contract where multiple methods are permitted, the Contractor may select
    any of the methods specified, however, if only one method is specified, this will be the only
    method permitted at that location. This price shall include cleaning and preparation of the host
    pipe, furnishing and installing the liner, lateral reconnection, coupling and expansion devices,
    annular cement grout, design (if necessary) and shop drawing preparation, furnishing and
    installing liner and all components of the liner system, capturing any discharges or releases
    during installation or curing operations, furnishing any documentation or fees required for
    effluent or condensate disposal, all testing and sampling including furnishing reports and pre and
    post installation video inspections, waste disposal costs, excavation, sheeting, shoring, disposing
    of surplus and unsuitable material; backfilling and backfill material; compaction, restoring
    existing surfaces, and clearing debris and obstructions.
    De-Watering will be measured and paid as the actual number of water diversions or bypasses
    required to complete Pipe Rehabilitation work. Each instance of De-Watering paid includes De-
    Watering for pre-inspection, installation, post inspections, and remediation (if necessary). All
    materials, equipment, labor, or other resources required to de-watering a site shall be incidental
    to the unit cost for De-watering.
    Payment will be made under:
    Pay Item
    Pre-Installation Inspection
    (Size) Pipe Rehabilitation CIPP
    De-Watering Pump (Size)
    Pay Unit
    Linear Foot
    Linear Foot
    Each
    GROUTING HOST PIPE BEFORE LINING:
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Bid Opportunity: Readvertisement: Galvanized Requiring Replacement (GRR) Program Pre-Bid Meeting: Closing Date/Time: June

    Carrboro OWASA (Water and Sewer Authority)

    Bid Due: 6/23/2026

    Addendum Forsyth_BR-0168_C205160_Addendum No.1 J OSH S TEIN G OVERNOR S TATE OF N

    Division of Highways

    Bid Due: 6/16/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.