| Location: | Arizona |
|---|---|
| Posted: | Sep 15, 2026 |
| Due: | Sep 30, 2026 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF27B000002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Small Business Set-Aside
PROJECT NUMBER: AZ FLAP PIM FR510(1)
PROJECT NAME: Burro Creek Road
PROJECT DESCRIPTION:
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
SCOPE OF THE WORK:
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award-January - 2027
Construction – January 2027 through October 2027
ESTIMATED COST RANGE:
Between $2,000,000 and $5,000,000
| Oct 15, 2026 | [Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road |

With GovernmentContracts, you can:
...public access and protecting the transportation facility investment and adjacent environmental resources... Activities: ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 2/13/2028
...of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026