| Location: | South Carolina |
|---|---|
| Posted: | Mar 14, 2025 |
| Due: | Apr 15, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | N04-9799-LC |
| Publication URL: | To access bid details, please log in. |
The work includes the abatement of asbestos containing material (ACM) in the floor and ceiling finishes in select rooms in the gatehouse building and inmate housing at Manning Correctional totaling approximately 56,226 square feet. The textured ACM finish was applied over plaster ceilings and to the underside of the concrete roof deck. There are surface mounted and suspended devices such as light fixtures, pipes, conduit, mechanical equipment.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...19, 2026 - 2:00pm Project Location: Pendleton, SC Project Delivery Method: Design-Bid-Build... qualified ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026