Pamlico_B-5995_C204742_Addednum No.1 Bridge #680057 over Dawson Creek on SR-1302

Location: North Carolina
Posted: Jun 6, 2026
Due: Jun 16, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
  • Addendum
  • Attachment Preview

    JOSH STEIN
    GOVERNOR
    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    DANIEL H. JOHNSON
    SECRETARY
    June 5, 2026
    Addendum No. 1
    RE: Contract # C204742
    WBS # 48190.3.1
    Federal Aid # BRZ-1302(083)
    Pamlico County (B-5995)
    Bridge #680057 over Dawson Creek on SR-1302
    June 16, 2026 Letting
    To Whom It May Concern:
    Reference is made to the proposal furnished to you on this project.
    The following revisions have been made to the proposal.
    Page No.
    Proposal Cover
    Table of Contents
    G-45
    Revision
    Note added that reads
    “Includes Addendum No. 1 Dated 06-05-2026”.
    Added NOTE TO CONTRACTOR … G-45.
    The Project Special Provision entitled NOTE TO
    CONTRACTOR has been added.
    Please void the above listed Pages in your proposal and staple the revised Pages thereto.
    The contract will be prepared accordingly.
    Sincerely,
    Wiley W. Jones III, PE
    Director of Field Support
    WWJ/drk
    Attachments
    Mailing Address:
    NC DEPARTMENT OF TRANSPORTATION
    CONTRACT STANDARDS AND DEVELOPMENT
    1591 MAIL SERVICE CENTER
    RALEIGH, NC 27699-1591
    Telephone: (919) 707-6900
    Fax: (919) 250-4127
    Customer Service: 1-877-368-4968
    Website: www.ncdot.gov
    Location:
    1020 BIRCH RIDGE DR.
    RALEIGH, NC 27610
    C204742 (B-5995)
    cc: Mr. Wiley W. Jones III, PE
    Mary Beth Houston, PE
    Mr. Ken Kennedy, PE
    Mr. Malcolm Bell
    Pamlico County
    Mr. Forrest Dungan, PE
    Ms. Jaci Kincaid
    Mr. Jon Weathersbee, PE
    Project File (2)
    STATE OF NORTH CAROLINA
    DEPARTMENT OF TRANSPORTATION
    RALEIGH, N.C.
    PROPOSAL
    INCLUDES ADDENDUM No. 1 DATED 06-05-2026
    DATE AND TIME OF BID OPENING: June 16, 2026 AT 02:00 PM
    CONTRACT ID
    WBS
    C204742
    48190.3.1
    FEDERAL-AID NO. BRZ-1302(083)
    COUNTY
    PAMLICO
    T.I.P NO.
    B-5995
    MILES
    0.180
    ROUTE NO.
    SR-1302
    LOCATION
    BRIDGE #680057 OVER DAWSON CREEK ON SR-1302.
    TYPE OF WORK GRADING, DRAINAGE, PAVING, AND STRUCTURE.
    NOTICE:
    ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
    GENERAL STATUTES OF NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING BOARD FOR CONTRACTORS WHEN BIDDING
    ON ANY NON-FEDERAL AID PROJECT WHERE THE BID IS $40,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE LICENSING BOARD.
    BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR CONDITIONING
    AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS
    ON BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH
    CAROLINA FOR LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
    BIDS WILL BE RECEIVED AS SHOWN BELOW:
    THIS IS A ROADWAY & STRUCTURE PROPOSAL
    5% BID BOND OR BID DEPOSIT REQUIRED
    C204742 B-5995
    G-45
    Pamlico County
    natural background conditions. Downstream sampling location shall be located at the point
    where complete mixing of the discharge and receiving water has occurred.
    The discharge shall be closely monitored when water from the dewatering activities is introduced
    into jurisdictional wetlands. Any time visible sedimentation (deposition of sediment) on the
    wetland surface is observed, the dewatering activity will be suspended until turbidity levels in
    the stilling basin can be reduced to a level where sediment deposition does not occur. Staining of
    wetland surfaces from suspended clay particles, occurring after evaporation or infiltration, does
    not constitute sedimentation. No activities shall occur in wetlands that adversely affect the
    functioning of a wetland. Visible sedimentation will be considered an indication of possible
    adverse impacts on wetland use.
    The Engineer will perform independent turbidity tests on a random basis. These results will be
    maintained in a log within the project records. Records will include, at a minimum, turbidity test
    results, time, date and name of sampler. Should the Department’s test results exceed those of the
    Contractor’s test results, an immediate test shall be performed jointly with the results
    superseding the previous test results of both the Department and the Contractor.
    The Contractor shall use the NCDOT Turbidity Reduction Options for Borrow Pits Matrix,
    available
    at
    https://connect.ncdot.gov/resources/roadside/FieldOperationsDocuments/
    TurbidityReductionOptionSheet.pdf to plan, design, construct, and maintain BMPs to address
    water quality standards. Tier I Methods include stilling basins which are standard compensatory
    BMPs. Other Tier I methods are noncompensatory and shall be used when needed to meet the
    stream turbidity standards. Tier II Methods are also noncompensatory and are options that may
    be needed for protection of rare or unique resources or where special environmental conditions
    exist at the site which have led to additional requirements being placed in the DWQ’s 401
    Certifications and approval letters, Isolated Wetland Permits, Riparian Buffer Authorization or a
    DOT Reclamation Plan’s Environmental Assessment for the specific site. Should the Contractor
    exhaust all Tier I Methods on a site exclusive of rare or unique resources or special
    environmental conditions, Tier II Methods may be required by regulators on a case by case basis
    per supplemental agreement.
    The Contractor may use cation exchange capacity (CEC) values from proposed site borings to
    plan and develop the bid for the project. CEC values exceeding 15 milliequivalents per
    100 grams of soil may indicate a high potential for turbidity and should be avoided when
    dewatering into surface water is proposed.
    No additional compensation for monitoring borrow pit discharge will be paid.
    NOTE TO CONTRACTOR:
    The streambed cannot be disturbed (other than spuds or anchors). Work from land, barge,
    workbridges, the existing structure, or the new structure will be allowed as long as it does not
    include stream bottom or stream bank disturbing activities, or vibration.
    C204742 B-5995
    Pamlico County
    COVER SHEET
    PROPOSAL SHEET
    TABLE OF CONTENTS
    PROJECT SPECIAL PROVISIONS
    HAUL ROADS:......................................................................................................................G-1
    BUILD AMERICA, BUY AMERICA (BABA): .....................................................................G-1
    CONTRACT TIME AND LIQUIDATED DAMAGES:..........................................................G-5
    INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:........G-5
    PERMANENT VEGETATION ESTABLISHMENT:.............................................................G-6
    CONSTRUCTION MORATORIUM: .....................................................................................G-6
    MAJOR CONTRACT ITEMS: ...............................................................................................G-7
    SPECIALTY ITEMS: .............................................................................................................G-7
    FUEL PRICE ADJUSTMENT:...............................................................................................G-7
    STEEL PRICE ADJUSTMENT:.............................................................................................G-9
    SCHEDULE OF ESTIMATED COMPLETION PROGRESS:..............................................G-21
    DISADVANTAGED BUSINESS ENTERPRISE: ................................................................G-21
    CERTIFICATION FOR FEDERAL-AID CONTRACTS:.....................................................G-35
    RESTRICTIONS ON ITS EQUIPMENT AND SERVICES: ................................................G-36
    USE OF UNMANNED AIRCRAFT SYSTEM (UAS):.........................................................G-36
    EQUIPMENT IDLING GUIDELINES: ................................................................................G-36
    U.S. DEPARTMENT OF TRANSPORTATION HOTLINE:................................................G-37
    SUBSURFACE INFORMATION:........................................................................................G-37
    MAINTENANCE OF THE PROJECT:.................................................................................G-37
    TWELVE MONTH GUARANTEE: .....................................................................................G-38
    EROSION AND SEDIMENT CONTROL/STORMWATER CERTIFICATION:.................G-39
    PROCEDURE FOR MONITORING BORROW PIT DISCHARGE:....................................G-44
    NOTE TO CONTRACTOR: ................................................................................................G-45
    ROADWAY ........................................................................................................................... R-1
    STANDARD SPECIAL PROVISIONS
    AVAILABILITY OF FUNDS – TERMINATION OF CONTRACTS ................................ SSP-1
    NCDOT GENERAL SEED SPECIFICATION FOR SEED QUALITY .............................. SSP-2
    ERRATA ............................................................................................................................ SSP-5
    PLANT AND PEST QUARANTINES................................................................................ SSP-8
    TITLE VI AND NONDISCRIMINATION: ........................................................................ SSP-9
    MINORITY AND FEMALE EMPLOYMENT REQUIREMENTS .................................. SSP-18
    REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTR CONTRACTS ...... SSP-21
    ON-THE-JOB TRAINING ............................................................................................... SSP-35
    MINIMUM WAGES ........................................................................................................ SSP-38
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow Repair BEQ FC555 Active Contract Opportunity Notice ID N4008526R9043 Related Notice Department/Ind.

    DEPT OF DEFENSE

    Bid Due: 7/13/2026

    Follow Class 5 Information Processing System (IPS) Security Container Active Contract Opportunity Notice

    DEPT OF DEFENSE

    Bid Due: 6/22/2026

    Follow SAAF and MAAF Airfield Lighting System Maintenance and Repair Active Contract Opportunity

    DEPT OF DEFENSE

    Bid Due: 6/22/2026

    Solicitation Number: 281-FB26257 Project Title: 3820 N. Liberty Street Restroom Renovations Description: This

    State Government of North Carolina

    Bid Due: 7/15/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.