| Location: | Utah |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 14, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PCMC26113-ENG |
| Publication URL: | To access bid details, please log in. |
Project Description: PCMC is inviting proposals from qualified manufacturers to provide two fully engineered half-through truss (no overhead bracing) bridges of steel construction. The manufacturer shall include design, fabrication, finishing, and transporting the steel truss bridge superstructures, including bearings.

With GovernmentContracts, you can:
...for supply and installation of two (2) above ground steel deck truck scale ...
State Government of Utah
Bid Due: 6/24/2026
...of epoxy lined and coated 20-inch steel pipe connection to a 42-inch JVWCD ...
State Government of Utah
Bid Due: 7/07/2026
...steel control structures with gates at turnout locations for water management. Work includes...
Franson Civil Engineers
Bid Due: 6/26/2026