| Location: | Utah |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 14, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PCMC26113-ENG |
| Publication URL: | To access bid details, please log in. |
Project Description: PCMC is inviting proposals from qualified manufacturers to provide two fully engineered half-through truss (no overhead bracing) bridges of steel construction. The manufacturer shall include design, fabrication, finishing, and transporting the steel truss bridge superstructures, including bearings.

With GovernmentContracts, you can:
...fabrication activities in a professional and educational setting....
State Government of Utah
Bid Due: 7/28/2026
...fabrication, delivery, and installation and startup support as specified herein....
State Government of Utah
Bid Due: 8/05/2026
...for final design verification, shop drawing review, equipment fabrication, delivery, and installation and ...
State Government of Utah
Bid Due: 8/05/2026
...demolition as required, fabrication and installation of stainless steel wall/bench/panel systems...
State Government of Utah
Bid Due: 7/28/2026