| Location: | Ohio |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Feb 19, 2026 |
| Agency: | State Government of Ohio |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SRC0000036719 |
| Publication URL: | To access bid details, please log in. |
| Solicitation ID: | SRC0000036719 |
| Solicitation Name: | Painting and Patching Unit K- 02032026 |
| Original Begin Date: | 2/3/2026 8:28:34 AM |
| Begin Date: | 2/3/2026 8:28:34 AM |
| End Date: | 2/19/2026 2:00:00 PM |
| Inquiry End Date: | 2/17/2026 2:00:00 PM |
| Commodity: | Painting services |
| MBE Set Aside: | MBE Set Aside |
| Agency: | DMH711120 CIN Maintenance SUBH |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000036719
|
|||
|
Solicitation Name
Painting and Patching Unit K- 02032026
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
1
|
MBE Set Aside
|
||
|
Begin Date
2/3/2026 8:28:34 AM (ET)
|
Amendment?
|
||
|
End Date
2/19/2026 2:00:00 PM (ET)
|
Inquiry End Date
2/17/2026 2:00:00 PM
|
||
|
Summary
The Ohio Department of Behavioral Health, Summit Behavioral Healthcare location is looking for a Painting Service to paint and patch the interior walls and bedrooms of Unit K.
Project Overview: The vendor is responsible for patching and painting the interior walls on unit K. In addition the are 3 bedrooms/bathrooms that need painted. The goal is to achieve a clean, uniform finish throughout all specified areas. In addition to these rooms, painting/patching the nursing stations wall. The ceiling is not included 1. Project Details
2.
Scope of Work
Preparation
Patching
Priming (if required)
Painting
|
Predecessor Contract
|
||
|
Process
The Ohio Department of Behavioral Health (DBH) will award this project to the lowest-cost responsive and responsible supplier. The awarded supplier must include all applicable costs for delivery, setup, and warranty in their submission.
|
|||
|
Ship To
P002265 DMH SUMMIT BHO Cincinnati
|
|||
1 Record(s)
|
0 Record(s)
|
1 Record(s)
|
Scope of Work for Vendor: Painting and Patching the interior walls and bedrooms of unit K
Project Overview: The vendor is responsible for patching and painting the interior walls on unit K. In addition the are 3 bedrooms/bathrooms that need painted. The goal is to achieve a clean, uniform finish throughout all specified areas. In addition to these rooms, painting/patching the nursing stations wall. The ceiling is not included
1. Project Details
• Spaces to be painted: The common area on unit K - walls of the unit and patient bedrooms/bathrooms.
• Surfaces to be painted: Walls
• Existing Condition: Minor patches may be required for imperfections or previous damage.
2. Scope of Work
Preparation
• Inspect each area requiring patchwork, such as cracks, dents, or holes.
• Ensure all walls are dry, and free of debris before starting work.
• Remove or cover all furniture, fixtures, and floor surfaces to protect from dust and paint splatters.
• Mask and tape all baseboards, trim, and edges around ceilings, doors, and windows to ensure clean paint lines.
• Move or protect any electrical outlets, light fixtures, and vent covers.
Patching
• Patch all cracks, holes, or surface imperfections using suitable materials for drywall or plaster.
• Sand patched areas smoothly to blend with the existing surface, ensuring a seamless finish.
• Conduct a final inspection to confirm all patched areas are smooth and level.
Priming (if required)
• Apply primer to any patched areas or other areas where needed, ensuring color consistency.
Painting
• Materials and Color: Use paint specified by the client (e.g., low-VOC paint, finish type (SATIN), and color) on walls and ceilings.
• Paint Application: Apply at least two coats of paint for full coverage and uniform finish.
• Maintain proper ventilation and temperature during the painting process.
• Check for uniformity in color and texture after each coat and correct any visible inconsistencies.
Clean-Up
• Remove all protective coverings carefully to avoid any paint spills or damage.
• Clean any minor paint splatters on floors, trim, and fixtures.
• Restore each area its original condition, moving furniture and fixtures back into place.
3. Quality Standards
• All painted surfaces should be smooth, consistent in color, and free of brush strokes, streaks, or roller marks.
• Patches should blend seamlessly with the rest of the wall or ceiling, with no visible lines or texture differences.
• All work should adhere to professional standards, with final inspections in each room to ensure a high-quality finish.
4. Project Timeline
• Start Date: February 23rd, 2026
• Completion Date: March 20, 2026
• The vendor will provide an estimated timeline for each unit and coordinate with the client if adjustments are required.
5. Deliverables
• Fully patched and painted walls in unit K (Common areas)
• Each area inspected and signed off by the client to confirm quality.
6. Materials and Supplies
• Responsibility for Materials: Vendor will supply paint, primer, and patching materials.
• Waste Disposal: Vendor is responsible for removing all debris and disposing of it off-site.
7. General Requirements
• Vendor must comply with all applicable safety and environmental regulations.
• Maintain a clean and safe working environment in all areas throughout the project.
• Provide regular updates to the client on project progress.
• Site Visit required to be considered for project