REQUEST FOR PROPOSALS
ENGINEERING AND RELATED SERVICES
Coffee Creek – Day Road Sewer Extension
Project #2115
ADVERTISEMENT DATE MARCH 25, 2026
Address Proposals to:
City of Wilsonville
Attn: Amy Maag, PE
29799 SW Town Center Loop East
Wilsonville, OR 97070
Proposals due: Wednesday, April 15, 2026, at 2:00 PM, Pacific Time
Proposals must be sealed in an opaque envelope, plainly marked as follows: “Request for
Proposals – Coffee Creek - Day Road Sewer Extension,” and sent to the attention of Amy Maag,
PE, Development Engineering Manager. Include the name and address of the Proposer.
Proposers must submit five (5) sets of the Proposal. Electronically mailed or faxed Proposals will
not be accepted. The City of Wilsonville reserves the right to reject any or all Proposals.
- This Page Intentionally Left Blank -
Table of Contents
Request for Proposals
I. Project Description ............................................................................................... 3
II. Scope of Work ...................................................................................................... 4
Term of Service ............................................................................................................ 4
Pre-Contract Activity.................................................................................................... 4
Project Phasing............................................................................................................. 4
Task 1 – Task 1 Project Management .......................................................................... 5
III. Minimum Qualifications ...................................................................................... 12
IV. Proposal Requirements ...................................................................................... 13
Proposal Format......................................................................................................... 13
Introductory Letter .................................................................................................... 13
Project Understanding ............................................................................................... 14
Project Approach ....................................................................................................... 14
Proposer’s Experience ............................................................................................... 15
Project Team Experience ........................................................................................... 15
Project Schedule ........................................................................................................ 16
Supporting Information ............................................................................................. 16
V. Proposal Submission .......................................................................................... 16
VI. Proposal Evaluation and Selection ..................................................................... 16
Written Evaluation ..................................................................................................... 17
Interview Evaluation .................................................................................................. 17
Successful Proposer Determination........................................................................... 17
Award Protest ............................................................................................................ 18
VII. Schedule ............................................................................................................ 19
VIII. Pre-Proposal Meeting ......................................................................................... 19
IX. RFP Documents ................................................................................................. 19
X. Project Manager ................................................................................................. 20
XI. RFP Questions ................................................................................................... 20
XII. General RFP Information.................................................................................... 20
Changes to the RFP Solicitation by Addenda............................................................. 20
Confidentiality............................................................................................................ 21
Cancellation ............................................................................................................... 21
Late Proposals ............................................................................................................ 21
Disputes ..................................................................................................................... 22
Proposer Certifications .............................................................................................. 22
Nondiscrimination...................................................................................................... 23
Competition ............................................................................................................... 23
Coffee Creek – Day Road Sewer Extension
Page 1
March 25, 2026
RFP Protests and Change Requests ........................................................................... 23
Proposal Liability ........................................................................................................ 24
City Requests for Clarification, Additional Research, and Revisions ......................... 24
Rejection of Proposals ............................................................................................... 24
Modification or Withdrawal of Proposal by Proposer............................................... 25
Duration of Proposal.................................................................................................. 25
Local and Federal Requirements ............................................................................... 25
Attachment A
Sample Professional Services Agreement ...................................................................A-1
Attachment B
Supporting Information .................................................................................................B-1
Coffee Creek – Day Road Sewer Extension
Page 2
March 25, 2026
Request for Proposals
The City of Wilsonville, Oregon (the “City”) is requesting Proposals in order to select a qualified
consultant to provide professional services for the Coffee Creek - Day Road Sewer Extension
(“Project”). Consultants are invited to demonstrate their experience and qualifications in
performing work directly related to the services required by responding to this Request for
Proposals (RFP). The anticipated negotiated fee for this Project is expected to exceed $100,000;
therefore, Proposals will be evaluated in accordance with the qualifications based selection
procedures of OAR 137-048-0220. This Project ☐does ☒ does not involve federal funds.
I. Project Description
The Coffee Creek industrial area is approximately 258 gross acres south of Day Road, planned to
be used for Regionally Significant Industrial purposes. In 2016, the City adopted the Coffee
Creek Urban Renewal Plan to build utility infrastructure to accommodate growth in the area.
The Coffee Creek – Day Road Sewer Extension Project “Project” was identified and included in
the Urban Renewal Plan to extend sanitary sewer to serve properties south of Day Road in the
Coffee Creek industrial area and properties north of Day Road in the Basalt Creek industrial
area.
The Project is identified in the 2014 Sanitary Sewer Collection System Master Plan and the
Basalt Creek Utility Infrastructure Concept Plan, 2017, and a preferred pipeline alignment and
profile selected by the City in 2019 (See Attachment B). The preferred alignment extends a 15”
sewer main on Day Road from Garden Acres Road to Boones Ferry Road and will provide
additional capacity to support industrial development within the Coffee Creek and Basalt Creek
industrial areas.
The City anticipates that the project will include, but is not limited to, design and coordination
of the following items:
A. Engineering Design Studies
Engineering studies will include, as a minimum, geotechnical investigations to document
the extents of boulders and bedrock along the pipeline alignment, but may include
other studies as determined by the design engineer and approved by the City.
B. Survey and Utility Location
The design engineer will coordinate all required survey for design, coordination, and
verification of all utilities within the project boundaries, and post-construction survey.
C. Layout of Sewer Main and Alignment
As part of the Basalt Creek and Coffee Creek Sanitary Sewer Concept Plan (Dated May 1,
2019), a preferred alignment and profile was selected by the City. The preferred
alignment extends a new 15-inch diameter sanitary sewer main from the existing
manhole near 24925 SW Garden Acres Road to the intersection of SW Day Road and SW
Boones Ferry Road. The Basalt Creek and Coffee Creek Sanitary Sewer Concept Plan can
Coffee Creek – Day Road Sewer Extension
Page 3
March 25, 2026
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.