| Location: | Federal |
|---|---|
| Posted: | May 29, 2025 |
| Due: | Jun 30, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912P725BA008 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THE ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84- 99 PROJECT IS AN ONE TIME REPAIR PROPOSED BY USACE TO REPAIR STORM DAMAGED TO FLOOD CONTROL CHANNELS IN ALAMEDA COUNTY. DAMAGES CONSISTED OF EROSION AND BANK FAILURES DURING A SERIES OF ATMOSPHERIC RIVERS BETWEEN DECEMBER 2022 AND MARCH 2023. REPAIRS CONSIST OF TEN (10) SITES ALONG ARROYO MOCHO AND ALAMO CANAL, INCLUDING G-6, G-7, G-8, G-9, G-10, G-13, G-14, F-11, F-12, AND F-13.THE EXISTING FLOOD CONTROL CHANNELS TYPICALLY HAVE EARTHEN SLOPES PREVIOUSLY CONSTRUCTED TO GRADES OF 2H:1V, WITH CHANNEL HEIGHTS RANGING FROM 15-30 FEET. THE DAMAGED SITES VARY IN SIZES. REPAIRS TO DAMAGED SITES WILL RESTORE THE SLOPES TO ORIGINAL GRADE PRIOR TO THE STORM DAMAGES. EARTHWORK WILL START WITH EXCAVATION OF THE DAMAGED AREA, REMOVING DISTURBED SOIL AND VEGETATION WITHIN THE AREA. REPAIRS WILL CONSIST OF PLACING ROCK SLOPE PROTECTION (RSP) AT THE WATERSIDE SLOPE TOE, PLACING SOIL-FILLED RSP UP TO THE 10-YEAR WATER SURFACE ELEVATION, AND RESTORING THE UPPER PORTION OF THE SLOPE WITH COMPACTED BACKFILL. AFTER THE REMAINING SLOPE IS BACKFILLED AND COMPACTED ABOVE THE STONE PROTECTION, EROSION CONTROL MATTING WILL BE INSTALLED AND HYDROSEEDED.
| Jun 5, 2025 | [Solicitation (Updated)] ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84-99 PROJECT |
| Jun 25, 2025 | [Solicitation (Updated)] ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84-99 PROJECT |
| Jul 7, 2025 | [Solicitation (Updated)] ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84-99 PROJECT |

With GovernmentContracts, you can:
Follow High Speed Aerial Targets Active Contract Opportunity Notice ID W900KK-26-SSN-Targets Related Notice
DEPT OF DEFENSE
Bid Due: 6/29/2026
Follow 47--COUPLING HALF,QUICK Active Contract Opportunity Notice ID SPE7M326T6274 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 6/08/2026
Follow 59--REACTOR Active Contract Opportunity Notice ID SPE4A626T73P2 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/05/2026
Follow 53--COVER,ACCESS Active Contract Opportunity Notice ID SPE7L126Q1138 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/08/2026