| Location: | Minnesota |
|---|---|
| Posted: | Feb 27, 2026 |
| Due: | Mar 10, 2026 |
| Agency: | State Government of Minnesota |
| Type of Government: | State & Local |
| Category: | |
| Publication URL: | To access bid details, please log in. |
Brief Description: MnDOT requests letters of interest to prepare final road plans, specifications, cost estimates, a stormwater management plan, and all related documents and agreements for: Trunk Highway (TH) 280: From Wabash Avenue (Ave.) in St. Paul to just north of Broadway Street (St.). Hennepin Avenue: (Hennepin Reconstruction) From the 33rd Ave. intersection to 300 feet west of Industrial Boulevard (Blvd.), in coordination with Hennepin County. The final plan will also incorporate five bridge preservation plans developed by the MnDOT Bridge Office for bridge numbers 9471, 9472, 62033, 62034, and 62843 and accommodating Minnesota Commercial Railway Crossing plans at Hennepin Ave. and Industrial Blvd. and a drainage repair on Energy Park Drive.
Date posted: 02/24/2026
Due date: 03/10/2026

With GovernmentContracts, you can:
...- Seeding, Erosion Control - Temporary, Paving (Asphalt or Concrete), Roadway Pavement Markings...
WSB
Bid Due: 6/08/2026
..., temporary erosion control, traffic control, dewatering and restoration, along with temporary conveyance...
Metropolitan Council
Bid Due: 6/30/2026
...as well as some temporary office space and 5,982sf of existing space on ...
Washington County
Bid Due: 6/09/2026
...Post Date 06/01/2026 Quest Number 10193293 Category Code Construction,Erosion Control - Temporary... - ...
WSB
Bid Due: 6/23/2026