| Location: | North Carolina |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Mar 9, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-RFQ-14 |
| Publication URL: | To access bid details, please log in. |
Project Description: Charlotte Water (CLTWater) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide professional engineering services, design, and construction phase services for the Sugar Creek East Equalization Basin, Pumping Station, and Forcemain Improvements Project (Project).
The East Flow EQ Basin and Grit Facility, constructed in 1997, is located south of the treatment facility along Little Sugar Creek. During high flow events, wastewater flows south by gravity to the Excess Flow Control Chamber via a 54” line. In the Excess Flow Control Chamber, there is a gate that can direct flow to either the McAlpine Creek WWMF or to the Flow EQ Fill Pump Station. With the gate to McAlpine Creek WWMF line closed, wastewater enters the Flow EQ Fill Pump Station and is pumped to the East Fow EQ Basin for storage. Once the storm surge is complete and staff want to empty the East Flow EQ Basin, wastewater can then drain via gravity or Return Flow pumps to the Excess Flow Control Chamber, where it then flows by gravity to McAlpine Creek WWMF.

With GovernmentContracts, you can:
...Related to the Wastewater Service Due Diligence Preliminary Engineering Report of the Pitt ...
Greenville Utilities
Bid Due: 6/09/2026
...with wastewater treatment plant improvements at the Pender County Utilities Wastewater Treatment Plant...-effective, ...
County of Pender
Bid Due: 6/25/2026
...the Eastside and Westside Wastewater Treatment Plants during the time period of February ...
City of High Point
Bid Due: 4/01/2029
...County, along with several smaller wastewater conveyance networks in the central and northern ...
County of Pender
Bid Due: 6/25/2026