Project Description: Charlotte Water (CLTWater) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide professional engineering services, design, and construction phase services for the Sugar Creek East Equalization Basin, Pumping Station, and Forcemain Improvements Project (Project).
The East Flow EQ Basin and Grit Facility, constructed in 1997, is located south of the treatment facility along Little Sugar Creek. During high flow events, wastewater flows south by gravity to the Excess Flow Control Chamber via a 54” line. In the Excess Flow Control Chamber, there is a gate that can direct flow to either the McAlpine Creek WWMF or to the Flow EQ Fill Pump Station. With the gate to McAlpine Creek WWMF line closed, wastewater enters the Flow EQ Fill Pump Station and is pumped to the East Fow EQ Basin for storage. Once the storm surge is complete and staff want to empty the East Flow EQ Basin, wastewater can then drain via gravity or Return Flow pumps to the Excess Flow Control Chamber, where it then flows by gravity to McAlpine Creek WWMF.

With GovernmentContracts, you can:
...Design services for 2 existing elevators that require replacement of hydraulic pumping units...
North Carolina State University
Bid Due: 6/12/2026
...* Primary Clarifiers and Sludge Pumping * Secondary process: 3-stage BNR with Densification ...
State Government of North Carolina
Bid Due: 6/25/2026
...experienced by the HFL since the West Campus was disconnected from the Method ...
North Carolina State University
Bid Due: 6/09/2026
...was disconnected from the Method Road pumping station as a result of the ...
North Carolina State University
Bid Due: 6/09/2026