| Location: | Washington |
|---|---|
| Posted: | Feb 18, 2025 |
| Due: | Mar 5, 2025 |
| Agency: | City of Poulsbo |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Noll Road – North Segment
The City is currently soliciting bids for the Noll Road Improvements project – North Segment and Middle Safe Routes to School.
Sealed Bids will be received by the City of Poulsbo at City Hall, 200 NE Moe Street, Poulsbo, Washington 98370-7347, until 11:00 a.m., Wednesday, February 12, 2025, as stamped by the official bid clock located on the Engineering Department counter. Bids will therefore be opened and publicly read aloud. Bids received after the time fixed for Bid Opening will not be considered. Contract shall be awarded on or after March 5, 2025. Bidders shall familiarize themselves with RCW 39.04.350, effective February 12, 2025.
This project will provide roadway, illumination, sidewalk, and shared-use path improvements between Noll Road NE and NE Bjorn Street, sidewalk improvements at Poulsbo Elementary School, a roundabout at the intersection of NE Mesford Road and Noll Road NE, and roadway, sidewalk, and shared-use path improvements between NE Mesford Road and NE Lincoln Road. Stormwater conveyance improvements will be included. Utility relocation will occur as needed. New water and sewer mains will be installed in the vicinity of NE Lincoln Road.
The Engineer’s estimated range for this project is between $10.0 Million and $12.0 Million. For technical questions, please email Josh Ranes, City of Poulsbo, jranes@cityofpoulsbo.com.
To view the advertisement in full, please click Noll North Advertisement .
______________________________________________________________________________________________________________________
West Poulsbo Stormwater Retrofit
The City solicited bids for the West Poulsbo Stormwater Retrofit project.
The project consists of work to be performed within 60 working days from Notice to Proceed and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows:
Construction of the West Poulsbo Stormwater Retrofit which shall consist of, but not be limited to:
This project was awarded to VET Industrial for $753,243.29
_________________________________________________________________________________________________________
Complete Streets Curb Ramp Upgrades Project
The City solicited bids for the Complete Streets Curb Ramp Upgrades project.
The project consists of work to be performed within 50 working days from Notice to Proceed and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows:
This project includes construction of ADA ramps, sidewalk, curb and gutter, adjusting storm drainage grates, pavement rehabilitation/restoration, temporary traffic control, landscape restoration, and other required work.
This project was awarded to Asphalt Patch Systems for $465,010.00

With GovernmentContracts, you can:
...Solicitation Close Date: 06/11/26 Title: WWCC - Supply Fan 4 Retrofit Ref #:2026-060 ...
State Government of Washington
Bid Due: 6/11/2026
...Construction Management Services for the White Center Ponds Retrofit Project A&E Solicitation...
King County
Bid Due: 6/09/2026
...Project: BID - WWCC - Supply Fan 4 Retrofit - Walla Walla Community ...
State Government of Washington
Bid Due: 6/11/2026
...that seismic retrofit and building envelope work does not damage or require rework ...
City of Seattle
Bid Due: 6/10/2026