| Location: | Virginia |
|---|---|
| Posted: | Apr 9, 2025 |
| Due: | Apr 30, 2025 |
| Agency: | Chesapeake Public School |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Jolliff Middle School Roof Replacement
Addenda: 0
Release Date: 4/9/2025
Due Date: 4/30/2025
Prior to beginning the roof retrofit project, the contractor will contract Tremco to preform two (2) infrared roof surveys. One (1) will be conducted prior to roof work beginning to confirm the location and extent of the wet insulation shown in the drawings. If the survey shows additional wet insulation to that shown on the drawings, those new areas will be repaired (including demolition and new work) like areas currently indicated as having wet insulation in the project. The second survey will be conducted after Substantial Completion of the roof to confirm all areas of the roof insulation are dry. In addition to any other closeout and punch list requirements, any areas found to contain wet insulation will be repaired by the contractor.
Roof Retrofit using a Ketone Ethlyene Ester (KEE) roofing system over gypsum cover board. The assembly will be installed over the existing roof.
Roof drain piping support directly adjacent to new and existing roof drains.
The Project will be constructed under a single prime contract.

With GovernmentContracts, you can:
Follow Next Generation Advanced Bomb Suit Contract Modification Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 8/03/2026
Follow 6505--FDG Radiopharmaceutical Active Contract Opportunity Notice ID 36C24426Q0839 Related Notice Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/05/2026
Follow SPE4AX26R0041-6830-HALON,FIRE EXT Active Contract Opportunity Notice ID SPE4AX26R0041 Related Notice SPE4AX26R0041 Department/Ind.
DEPT OF DEFENSE
Bid Due: 8/11/2026
*NOTICE ONLY* 2026-2027 M7B Snow Removal Services ... Status: Open RFI 125122 Virginia
State Government of Virginia
Bid Due: 2/01/2027