| Location: | Utah |
|---|---|
| Posted: | Apr 21, 2025 |
| Due: | May 14, 2025 |
| Agency: | City of West Valley City |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Bid No. 25-10 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes approximately 4,000 LF of new 8-inch ductile iron pipe. connection to existing 10-inch CIP in 900 E, 2 connections to the existing 6-inch ductile iron pipe, removal and salvaging of existing hydrants, new hydrants, reconnection of existing service laterals via copper flare connector, installation of a combination air valve and vault, with water service planned to stay active for construction, with a coordinated switch over. Includes incidental restoration of disturbed waterway, and landscaping, Includes asphalt removal, disposal and placement. Also includes 4 cast-in-place sewer manholes with concrete collars.

With GovernmentContracts, you can:
...Outlet Works. Repairs include pipe support concrete pad repairs and restoration. ... Project: ...
State Government of Utah
Bid Due: 9/23/2026
.... The work includes demolition of existing structures, installation of new concrete features, ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/23/2026
...chain-link fence and barbed-wire extension, including demolition, concrete footings, bollards..., connections to existing ...
State Government of Utah
Bid Due: 10/20/2026
...includes demolition of existing structures, installation of new concrete features, upgraded family... and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/23/2026