| Location: | Utah |
|---|---|
| Posted: | Apr 21, 2025 |
| Due: | May 14, 2025 |
| Agency: | City of West Valley City |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Bid No. 25-10 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes approximately 4,000 LF of new 8-inch ductile iron pipe. connection to existing 10-inch CIP in 900 E, 2 connections to the existing 6-inch ductile iron pipe, removal and salvaging of existing hydrants, new hydrants, reconnection of existing service laterals via copper flare connector, installation of a combination air valve and vault, with water service planned to stay active for construction, with a coordinated switch over. Includes incidental restoration of disturbed waterway, and landscaping, Includes asphalt removal, disposal and placement. Also includes 4 cast-in-place sewer manholes with concrete collars.

With GovernmentContracts, you can:
...Project: Construction Project Management Ref. #: SB26-6 Department: Division of Purchasing Type... to ...
State Government of Utah
Bid Due: 8/19/2026
...Bid Title: Pre-Approved ADU Construction Documents Category: RFP Postings Status: Open Description...: Pre-Approve ...
Summit County
Bid Due: 8/21/2026
...Project: NSD Testing & Special Inspection of Construction Materials RFP Ref. #: NSDRP26-0708... ...
State Government of Utah
Bid Due: 8/11/2026
...Project: Center Park Dr. - 6200 S Trail Construction Ref. #: WJPW26070801 Department: ...
State Government of Utah
Bid Due: 8/06/2026