| Location: | Utah |
|---|---|
| Posted: | Apr 21, 2025 |
| Due: | May 14, 2025 |
| Agency: | City of West Valley City |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Bid No. 25-10 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes approximately 4,000 LF of new 8-inch ductile iron pipe. connection to existing 10-inch CIP in 900 E, 2 connections to the existing 6-inch ductile iron pipe, removal and salvaging of existing hydrants, new hydrants, reconnection of existing service laterals via copper flare connector, installation of a combination air valve and vault, with water service planned to stay active for construction, with a coordinated switch over. Includes incidental restoration of disturbed waterway, and landscaping, Includes asphalt removal, disposal and placement. Also includes 4 cast-in-place sewer manholes with concrete collars.

With GovernmentContracts, you can:
...Project: NS26-148 Hinckley Town - Sewer Lagoon Improvements Phase 1 Ref. #: NS26-148 ...
State Government of Utah
Bid Due: 7/10/2026
...Description: The Issuing Office for the Bidding Documents is: Hanna Water and Sewer ...
State Government of Utah
Bid Due: 6/30/2026
...is comprised of approximately 1,100 miles of sanitary sewer lines. The District owns ...
State Government of Utah
Bid Due: 9/17/2026
...seeks a qualified Utah-licensed contractor to rehabilitate 20 sanitary sewer manholes using 100% ...
State Government of Utah
Bid Due: 6/30/2026