| Location: | Florida |
|---|---|
| Posted: | Dec 15, 2025 |
| Due: | Jan 29, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-26-002 |
| Publication URL: | To access bid details, please log in. |
Project Description: The existing Southwest Water Treatment Plant (WTP) has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, and Ground Storage Tank (GST) for storage. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.

With GovernmentContracts, you can:
...Project ID: Title: Petroleum Storage Tank Repair Service Addenda: 0 Release Date: 5/29/2026 ...
Sarasota County
Bid Due: 7/01/2026
...Project ID: Title: Petroleum Storage Tank Testing and Inspection Services Addenda: 0 Release ...
Sarasota County
Bid Due: 6/19/2026
...ELEVATED & GROUND STORAGE TANK MAINTENANCE & ASSET MANAGEMENT Secondary Contact Michael Falcon... ...
Brevard County School Board
Bid Due: 7/02/2026
...ELEVATED & GROUND STORAGE TANK MAINTENANCE & ASSET MANAGEMENT Secondary Contact Michael Falcon... ...
Polk County Public Schools Facilities and Operations
Bid Due: 7/02/2026