| Location: | Florida |
|---|---|
| Posted: | Dec 15, 2025 |
| Due: | Jan 29, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-26-002 |
| Publication URL: | To access bid details, please log in. |
Project Description: The existing Southwest Water Treatment Plant (WTP) has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, and Ground Storage Tank (GST) for storage. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.

With GovernmentContracts, you can:
...Master Meters installed throughout the Water, Wastewater, and IQ distribution systems. Flow meters... ...
Collier County
Bid Due: 6/12/2026
...improvement intended to enhance water quality, increase system reliability, and strengthen fire flow.../2026 ...
Volusia County
Bid Due: 6/25/2026
...File No: 26-423 Description: Water Elevation Monitoring Services - Annual Contract Contact.... 20260423, ...
Charlotte County
Bid Due: 6/09/2026
...improvement intended to enhance water quality, increase system reliability, and strengthen fire flow.../2026 ...
Volusia County
Bid Due: 6/11/2026