| Location: | Florida |
|---|---|
| Posted: | Dec 15, 2025 |
| Due: | Jan 29, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-26-002 |
| Publication URL: | To access bid details, please log in. |
Project Description: The existing Southwest Water Treatment Plant (WTP) has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, and Ground Storage Tank (GST) for storage. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.

With GovernmentContracts, you can:
...Project: Southside Water Reclamation Facility Dewatering System Expansion and Process Control... Description: The ...
Toho Water Authority
Bid Due: 10/01/2026
...Project: Southside Water Reclamation Facility Dewatering System Expansion and Process Control... Description: The ...
Toho Water Authority
Bid Due: 10/08/2026
...and level sensors, valve positioners, liquid, gas, and solids flow meters, process recorders, ...
Collier County
Bid Due: 10/01/2026
...for demolition on the plans, including electrical, sanitary force main, and potable water. ...
State Government of Florida
Bid Due: 10/05/2026