| Location: | Florida |
|---|---|
| Posted: | Dec 15, 2025 |
| Due: | Jan 29, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-26-002 |
| Publication URL: | To access bid details, please log in. |
Project Description: The existing Southwest Water Treatment Plant (WTP) has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, and Ground Storage Tank (GST) for storage. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.

With GovernmentContracts, you can:
...Project ID: ITB No. 2025/2026-A12 Title: Mid-Clay Water Reclamation Facility (WRF) Ground Storage... ...
Clay County Utility Authority
Bid Due: 10/09/2026
...of a new Fleet Parts Room metal storage system. The project includes the ...
City of Hollywood
Bid Due: 9/28/2026
...BEACH, FL, 33415-3199, USA Commodity Codes Code Description Extended Description 39091 Water... products, ...
Palm Beach County
Bid Due: 11/02/2026
..." - Oil-contaminated water and/or sludge from secured collection - Contaminated or waste ...
Marion County School Board Purchasing
Bid Due: 10/07/2026